My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6623 EVERGREEN WAY 2024-10-11
>
Address Records
>
EVERGREEN WAY
>
6623
>
6623 EVERGREEN WAY 2024-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 11:37:33 AM
Creation date
9/24/2024 3:45:05 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6623
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMO GENERAL NOTES <br /> 'qt�Q GRO& <br /> 1. DURING STORAGE&CONSTRUCTION,ALL DUCT AND OTHER RELATED AIR DISTRIBUTION `4 � � <br /> COMPONENT OPENINGS SHALL BE COVERED WITH TAPE,PLASTIC,SHEET METAL TO 44 <br /> PREVENT DUST,WATER,AND DEBRIS FROM ENTERING THE SYSTEM. Cr 1 <br /> 2. CONTRACTOR SHALL PROVIDE DUCT TRANSITIONS&OFFSETS AS NEEDED IN ORDER TO I <br /> HAVE A COMPLETE FUNCTIONING SYSTEM. ��j • <br /> 3. SITE INSPECTION-CONTRACTOR SHALL VISIT THE SITE OF WORK AND BE THOROUGHLY <br /> FAMILIAR WITH THE WORKING CONDITIONS&EXACT NATURE OF THE WORK PRIOR TO THE <br /> SUBMISSION OF BID.CONTRACTOR SHALL VERIFY ALL IN PLACE&EXISTING CONDITIONS <br /> AND SHOULD ANY CONFLICTING CONDITION ARISE WHERE THE INTENT OF THE DRAWING IS <br /> IN DOUBT OR WHERE THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND FIELD ACE MEP GROUP,INC. <br /> CONDITIONS,THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR ARCHITECT IN WRITING D.,SUITE 25 <br /> FOR CLARIFICATION PRIOR TO SUBMISSION OF BID.SUBMISSION OF A BID ACKNOWLEDGES IRVINE,CA 9241 IRVINE BLV BLV p 0 <br /> FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM. 951.808.1040 <br /> acemepgroup.com <br /> OF�o WAS,, <br /> W�� Nco2 <br /> T <br /> 110.F 22625035 Gya <br /> RFOISTEQ-�'��0 <br /> DEMO PLAN NOTES �ssIONALt <br /> 1O LOCATE FCU IN MOUNTED T-0"AFF TO BOTTOM OF UNIT.ROUTE REFRIGERANT PIPING REVISION <br /> ABOVE CEILING AND UP THRU ROOF TO CONDENSING UNIT. <br /> 2O SET CONDENSING UNIT ON ROOF USING TWO CURBS PLUS EQUIPMENT CURBS,SECURE <br /> CONDENSING UNIT TO CURBS ARRANGED IN PARALLEL SET LONG SIDE OF CURB <br /> PARALLEL TO ROOF SLOPE FLASH INTO ROOF BY GC.FINAL LOCATION TO BE <br /> DETERMINED IN THE FIELD.ALL MAINTENANCE CLEARANCE OF NEW AND EXISTING PROJECT NO:24115 <br /> EQUIPMENT SHALL BE MAINTAINED. <br /> DATE:05/13/2024 <br /> O3 PROVIDE T24 COMPLIANT THERMOSTAT FROM FCU MANUFACTURER. <br /> DRAW BY: <br /> O ® RUN 3/4"CONDENSATE LINE IN WALL DOWN TO APPROVED RECEPTOR.PROVIDE <br /> T CONDENSATE PUMP. CHECK BY: <br /> SCALE: <br /> A; O CU <br /> O1 <br /> W <br /> 4 I..L Qa O <br /> w > CV <br /> \ Z °O <br /> W <br /> W Lu <br /> Z WW <br /> a M > <br /> M N W <br /> I..I.J c9 <br /> VJ <br /> Z) <br /> SHEET TITLE: <br /> ENLARGED PLANS <br /> NORTH <br /> a� <br /> SHEET NUMBER: <br /> 0 r zr 4' s' <br /> 1/2" M 200 <br /> NER ROOM ENLARGED PLAN 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.