MECHANICAL ABBREVIATIONS MECHANICAL LEGEND MECHANICAL GENERAL NOTES DRAWING INDEX \,
<br /> SHEET NO. HEEL THE CURRENT ■
<br /> REVISION ei
<br /> A AMPS BC NTERNATIGNAL BUILDING CODE 1px10°n�1 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS,INCLUDING,BUT NOT UNITED TO THE 2018 IBC,2018 WSEC,2018 INC& WOO DovER seEr_w�
<br /> AC AR CONDITIONING FCC NTERNATIONAL FUEL GAS CODE f W RECT SUPPLY ANTI DUCT SIMILAR YEAR WA.0 296-104 BOILER RULES. Y0.0t SCHEMES SHEET-RAC ___ _ Herman son
<br /> 1(LX . UP OWARD
<br /> ACRE AIR CHANGES PER HOUR CW NDUSTRIAL COLD WATER I /T RG.as CONSTRUCTIONSTANDARDS-AlEC
<br /> ACT ACOUSTICAL COUNT TILE 0 NSIDE DIAMETER DIMENSION f 2. DO NOT SCALE DRAWINGS,DIMENSIONS GOVERN.DIMENSIONS ARE TO FACE OF STUD,CONCRETE,OR MASONRY UNO. �ql COOIOSC STA DS_spy
<br /> / Building Today,Defining Tomorrow
<br /> AD ACCESS DOOR E !OVERT ELEVATION L10"X10'„
<br /> I RECT SUPPLY AIR DUCT 3. LOCATION MID DETAILS OF EQUIPMENT,DUCT ROUTING AND CONNECTIONS ARE APPROXIMATE.COORDINATE FINAL LOCATIONS WITH OTHER W.W conslnxrrox STANDARDS-RAC
<br /> NP.01 1ST FLOOR PLAN-!RIFE
<br /> ADM. ADDITIONAL EER NTEGRATED ENERGY EFFICIENCY RATIO 101(10"n DN/AWAY TRADES.INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. N2.02 IND FLOOR RAN-HYAC 1Nmnmm Compaq,Lip
<br /> AFT ABOVE FINISHED FLOOR MC NTERNATIONAL MECHANICAL CODE 112.R1 RCO PUN-IOC 1221 zm Menus Not
<br /> 4. VERIFY EXISTING CONDITIONS,DIMENSIONS,DETAILS,ETC.NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK.
<br /> AFG ABOVE FINISHED GRADE N ACHES 1p^%1p^. W2.01 1ST FLOOR RPM RIM-RAC ,T575.97a.0E0.11
<br /> i RECT RETURN DUCT wz02 mD FLOOR PING RAN-HiA
<br /> ALU AL INUDLING UNIT N WG NCHES WRIER OE 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK,DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR YN:(209)575-s�00
<br /> AL/ALUM ALUMINUM PW NTEGRATED PART LOAD VALUE 10�D I UP/TOWARD WORK.IF ADDITIONAL QUESTIONS REMAIN,CONTACT THE ENGINEER PRIOR TO PROCEEDING. ADRI PIPING SHEET- -�'G Fa':(200 57S- 0
<br /> AMP AMPS AMPERAGE KW KILOWATTS �I us.01 DEreas CO-NW _ wewhenna cam
<br /> AP/ ACCESS PANEL UT LEAVING AIR TEMPERATURE f 10^X10','i RECT RETURN DUCT 6. ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNO. 0E.o1 VW neat CO/GRANS-nvec contractor Reg 1.HEM1.L1005v
<br /> ARCH ARCHITECT LRALBS POUND/POUNDS 10"%L Co DN/AWAY 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS.UNO: LOW PRESSURE DUCTWORK(DOWNSTREAM OF
<br /> MC BEADED COLLAR LF/UN FT UNEA,FOOT/FEET VAV BOXES,CONSTANT VOLUME AC SYSTEMS,TOILET EXHAUSTS,ETC.)TO MEET 2'CONSTRUCTION CLASS WITH SEAL CLASS C MEDIUMAPN NUMBER
<br /> BDD BACKDRAFT DAMPER LPG UQUID PROPANE GAS f IOU IO" RECT EXHAUST PRESSURE DUCTWORK(UPSTREAM OF VAR BOXES HIGH VELOCITY EXHAUSTS,ETC. TO MEET 2'CONSTRUCTION Ct ASS WITH SEAL CLASS C
<br /> BF BELOW FLOOR IPS LOW PRESSURE STEAM 10'%10%im Up/TOWARD (UN°IN SCHEDULES At 3'WITH SEAL CLASS B,>4'WITH SEAL CLASS Al. UCT RISERS IN SHAFTS WITH DAMPERED PENETRATIONS TO MEET 28041300103100
<br /> BHP BRAKE HORSEPOWER LOG LEAVING ml 6'CONSTRUCTION CLASS WITH SEAL CLASS A OUTDOOR INSTALLED SUPPLY&RETURN DUCTS TO HAVE SEAL CLASS A
<br /> BLDG BUILDING LAM SOUND POWER RATING LEVEL(IN DO) f 105(10'�<1 RECT EXHAUST 8- ALL CEILING DIFFUSERS ARE 4-WAY THROW UNLESS NOTED OTHERWISE. CHC SNORE CO
<br /> ROD BOTTOM Of DUCT INC LOW WALL GRILLELEGAL DESCRIPTION SOUTH EVERETT
<br /> BOP BOTTOM OF PIPE LOUT LEAVING WATER TEMPERATURE 10'X10'0 ON/AWAY ROT BOTTOM MA MAKE-UP AIR 9. ALL DUCT DIMENSIONS ARE OUTSIDE DIMENSIONS BEFORE SOUND UNING HAS BEEN ACCOUNTEDFOR(SOUND LINING 0 I',DID)
<br /> BS BIRD SCREEN/BLACK STEEL MAX MAXIMUM h Ip^0 (?) 10. OUTSIDE HR INTAKES ON ALL AR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY VENTS,STREETS,LOADING DOCK,NEIGHBORING LOT SEC 13 TAP 28 RGE 04RT-1C-)COM NE COR TH S ALOE LN 30 FT TO S BDY ANNEX
<br /> BTU BRITISH THERMAL UNIT MAU MAKE UP HR UNIT LINES&FUEL BURNING EQUIPMENT OR 3 FEET BELOW OR 25'ABOVE ANY CONTAMINANT SOURCE WITHIN 10 FEET. LN BEV-AUK HWY TH W ALG S BDY LN SD Ha 332.10 FT TH S TO S BDY IN PRI
<br /> BTUH BRITISH THERMAL UNITS PER HOUR MBH 1000 BRUTISH THERMAL UNITS HOUR 10'0 ROUND DUCT-UP/TOWARD8531 EVERGREEN WAY
<br /> CAP CAPACITY MCA MINIMUM CIRCUIT AAPACIY / S/HY 1 TH S 150FT TPB TH E90.00 00 16fi.05E TH SOt•OS DON TO NW NCNHOLLY
<br /> 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING PER C403.5.1&C403.5.5: EVERETT.WA 98208
<br /> CBD CALIBRATED BALANCING DAMPER MD MOTORIZED DAMPER I)10'0 () -0%TO 100%OF THE DESIGN SUPPLY AIR WITH FAULT DETECTION&DIAGNOSTIC REPORTING. DR TH N47•01 30E 114.05E TH N42.58 30W 45.44E TN NOt•OS OOE 198.75E TH
<br /> CC CONTROLS CONTRACTOR MFR MANUFACTURER 10°0 O� ROUND DUCT-DN/AWAY -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. N58'16 15W 182.50E TO SE ESS PSH- TH SW ALG SD SE MGN PSH�1280FT M/L
<br /> CO CC EILING DIFFUSER/CONDENSATE DRAIN RISMISCELLANEOUSr -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. TAP W OF TPB TH E TO TPB LESS FDP COM NE COR SD SEC 13 TH 500.41 ODE
<br /> CORR CONDENSER WATER RETURN MIN MINIMUM/MINUTE b1YX10'0 FLATOVAL DUCT-UP/TOWARD 12. OUTSIDE AR INTAKE,RELIEF,AND EXHAUST OPENINGS SHALL BE EQUIPPED WITH MOTORIZED CLASS 1 LOW LEAK(<4 CFM/SF 0 1'WG) ALC E LN SD DEC 682.2E TH S89.79 00W 115.70E TH S00.41 DOE 179.83E 718
<br /> 4J
<br /> COWS CONDENSER WATER SUPPLY MPS MEDIUM PRESSURE STEAM DAMPERS(OR GRAVITY PER EXCEPTIONS IN C403.7.8)DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE, TH CONE S00.41 00E50.88E TH S44.44 46E 45.44E TO?4WD RAW HOLLY DRIVE 7H
<br /> CFM CUBIC FEET PER MINUTE MT MOUNT <<1 YX10'0UNO FOR SMOKE CONTROL SYSTEM OPERATION S45•15 14W ALG SD R/W I14.04FT TN N00•41 OOW 159.27FT TH N58•16 15W
<br /> CHWR CHILLED WATER RETURN FAD MOUNTED O �� FLATOVAL DUCT-DN/AWAY 220.39FT TO SELY MGNEVERGREEN WAY(PSH,}1)TH N31.43 45E ALG SD HWY MCA
<br /> CHRIS CHILLED WATER SUPPLY MUA MAKE-UP AIR -+_ IS. THE CONTROL SYSTEM SHALL MEET C403 AND RE PROGRAMMABLE,CAPABLE Of BEING SET FOR DIFFERENT DAY TYPES PER WEEK,DEADBAND 154.84E TH 558•16 15E 181.75FT TAP THAT BEAR NO0.41 00W FR TPB TH S00•41
<br /> CID CEILING NUN MAKE-UP WATER 11 SETTING OF AT LEAST 5F 10F FOR RESIDENTIAL),BETWEEN THE HEATING AND COOLING SETPOINTSI AND SETBACK TEMPERATURES WITH OPTIMAL =,,',..
<br /> COL COLUMN NA NOT APPLICABLE T10'0'o DUCT OVERLAP WATER TTART EMPERRLATUR°EES°BY REPROL ESENTA�TOLIEWBUILDING LOADS E A MICROPROCESSOR
<br /> REQUIREDBLIN CC440ABLE3.4.OF VARYING FLOWS ANO RESETTING SUPPLY AIR& OOE 147.87E TPB `-`; �,...O 1'i
<br /> CONC CONCRETE NC NORMALLY CLOSED/NOISE CRITERIA 10•0 14. WHERE REQUIRED BY C408,RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS j '
<br /> CORD CONDENSATE NG/NGAS NATURAL GAS �• BOOT TAP OF THE DATE OF STSILM ACCEPTANCE PER THE ENERGY CODE.AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE - - a y
<br /> CONN CONNECT/CONNECTED/CONNECTION NC NOT IN CONTRACT BUILDING OWNER.ALL INAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER.HAAC a -
<br /> COM CONTINUOUS/CONRNUATTON NO NORMALLY OPEN/NUMBER CONTROL STSIEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS.A PRELIMINARY COMMISSIONING zr,.`O ,,4,'
<br /> COMR CONTRACTOR NPW NON-POTABLE WATER • REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY.A COMPLETE A,
<br /> + 4S TAP FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDD TO THE OWNER. 9
<br /> CHARD COORDINATE N-R NON-RESIDENTIAL - `F
<br /> COP COEFFICIENT OF PERFORMANCE OA/OSA OUTSIDE AIR 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE SMACNA MID ASCE 7.ALL LIFE SAFETY .
<br /> CT COOLNG TOWER OBD OPPOSED BLADE DAMPER MN. VOLUME DAMPEROR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEM EDAN Ip--1.5 FOR RESTRAINT METHODS OR AS NOTED ON THE DRAWINGS.REFER . .
<br /> CO , CUBIC/CONDENSER UNIT OD OUTSIDE DIAMETER/DIMENSION 10.0 TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASES ON SIZING,WEIGHTS AND MOUNTING HEIGHTS. _
<br /> CW DOMESTIC COLD WATER/CONDENSER WATER PCF POUNDS PER CUBIC FOOT T ' 9 9 t' -
<br /> DB DUCTBOARO/DRY BULB/DECIBEL PD PRESSURE DROP 10 CALIBRATED BALANCING DAMPER 16. C�UNGES TENT EARTHQUAKE
<br /> SILL LAINOT BE HUNGFF HVA ENT AS REQUIRED
<br /> R W BY AG FM SUPPORTS.RESTRAINTT MANUAL,SEISMIC HAZARD B.WIRES FOR
<br /> DDC DIRECT DIGITAL CONTROL PH PHASE NL " - ISSUE FOR PERMIT
<br /> DEL DEFLECTION POC POINT OF CONNECTION }1 1} RISE(R)&DROP(0) 17. PROVIDE FIRE AND COMBINATION PRE/SMOKE DAMPERS WHERE SHOWN ON PUNS AND WHERE REQUIRED PER CODE,AT 1-1/2 HR RATING Am v
<br /> DEC DEGREE/DEGREES P/PRESS PRESSURE } 1, } INO.
<br /> DIAL DIAMETERRPSI POUNDS PER SQUARE INCH 1> . TRANSITION 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING.ALL MATERIALS EXPOSED
<br /> DMPR DAMPER PSIG POUNDS PER SQUARE INCH GAUGE WITHIN PLENUMS SHALL BE NON-COMBUSTIBLE OR SHALL BE UL LISTED AND LABELED FOR INSTALLATION IN PLENUMS OR AS HAVING A FLAME KeyPlan
<br /> DN DOWN OTT QUANTITY ( /,T TURNING VANES/SPLATTERS SPREAD INDEX S 25 AND A SMOKE-DEVELOPED INDEX OF S 50. p (]
<br /> DOHS DEDICATED OUTSIDE AIR SYSTEM R/(R) RETURN GRILLE/RELOCATED/RETURN LL CL .ES:'e�+vF:_:: . 9
<br /> DWG DRAWING RA RETURN AIR (--t * DUCT MOUNTED SMOKE DETECTOR 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED IN THE RETURN AIR,PER MECH CODE.SUCH AS HJAC EQUIPMENT i y
<br /> EXH EXHAUST RD/RID ROUND DELIVERING(NOT EXHAUST)>2000 CFM(INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN,WITH A TOTAL SUPPLY �;( :- ,-
<br /> U EACH EXHAUST AIR REF REFERENCE }� BACK DRAFT DAMPER >2000 CFM OR EACH STORY'OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI-STORY INSTALLATION,NOT IN STSAEMS SERVING SINGLE `e'"T 1
<br /> / ) , © CY1ca 4Yh,lcs.e e alevE "-----,
<br /> ECT ENTERING AIR TEMPERATURE TIES REQUI
<br /> RED FREMA ARM SS.SMOKE DETECTORS CONE CE RRA AP BY ELE INSTALLED BYAT MC(WHSN IN DUN CAN B POWER-WIRING OLS INTERLOCK TO Pero P.<a FIRE HARM SYSTEM BY ELECTRICAL CONTRACTOR OV APPLICABLE.VAV BOX WITH SHUTDOWN CAN RE THROUGH CONTROLS SYSTEM. _EC ECGCRATE GRILLE/END CAP/ELEC CONTRACTOR RESID RESIDENTIAL .rwYnn fLIXIBLE DUCT ( FAN) _,,T,�>a.RntoreS
<br /> EER ENERGY EFFICIENT RATING RF RELIEF -) AIR FLOW(DRAWN AIR) 20. ARCHITECTURAL ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY GC AT ALL CONCEALED EQUIPMENT AND DEVICE LOCATIONS,UNLESS I 9 9. :.�.s LOW SG if 0a51mx�
<br /> EE EXHAUST FAN RG REFRIGERANT DISCHARGE GAS -M> AR FLOW(FORCED AIR) NOTED OTHERWISE. s
<br /> EFT EFFICIENCY RL REFRIGERANT UOUID
<br /> EL ELEVATION RPM REVOLUTIONS PER MINUTE =�ME5 XI. ALL MOTOR STARTERS NOT S110WN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR.MOTOR
<br /> ELEC/ELECT ELECTRICAL/ELECTRIC RS REFRIGERANT SUCTION ,G , EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM.
<br /> EN ENERGY MANAGEMENT CONTROL SYSTEM S SUPPLY 22. FOR ALL'SEALED AR TIGHT'OR PRESSURIZED SHAFTS/ROOMS AND PRESSURE/TEMPERATURE/HUMIDITY CONTROLLED ROOMS.THE FOLLOWING cl(L,
<br /> - S E P 2 7 2023
<br /> ENT ENTERING SA SUPPLY AIR COMBINATION FSD SHALL OCCUR: VICINITY MAP EQUIP EQUIPMENT SAT SATURATION/SUPPLY AIR TEMPERATURE FIRE DAMPER -USE SECTION 909.5 OF THE 2018 IBC FOR LTA%ALLOWABLE LEAKAGE AREA,FOLLOWING THE GUIDELINES FOR TOOT STAIR SHA TNO SCALE ESP EXTERNAL STATIC PRESSURE SD SMOKE DETECTOR SMOKE DAMPER CONSTRUCTION. Y
<br /> EWT ENTERING WATER TEMPERATURE S/D SUP&DRIVE CONNECTION MOTOR OPERATED DAMPER -ALL VERTICAL JOINTS,CORNERS AND WALL TRACKS(TOP AND BOTTOM)SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF
<br /> EXIST/(E) EXISTING S_C SEATTLE_CODE SIIII•BIIIIIIIIIILI THE JOINT(BY CC)
<br /> COI EXHAUST SEER SEASONAL ENERGY EFFICIENCY RATING -ANY FLWR DECKING PERPENDICULAR TO THE CONSTRUCTION SHALL BE CAULKED(BY GC).FlWNG WITH ROCK WOOL IS NOT ACCEPTABLE. ... _-_ 1 ITY OF EVERETT
<br /> -ANY PENETRATIONS OF THE CONSTRUCTION DUCTWORK CONDUIT PIPING ... SHALL BE EALED ON BOTH SIDES
<br /> F FAHRENHEIT SEWS SENSIBLE ACCESS DOORS -ALL DOORS SHALL BE PROVIDED WITH TIGHT'FITTING GASKETS AD THRESH SWEEPS AND OPEN AGAINST THE DIRECTION OF PRESSURE.
<br /> FAC FIRE ALARM CONTRACTOR SL SOUND LINED SOUND TRAP -IN ADDITION TO ABOVE,ROOM ENVELOPE TO HAVE VAPOR BARRIER FOR HUMIDITY CONTROLLED ROOMS ' T / - - r -rvICe S
<br /> FD FIRE DAMPER SM SHEETMETAL FLEX CONNECTION -ROOM ENVELOPE TO BE INSULATED(R-11 MIN)IF TEMPERATURE DIFFERENCE EXCEEDS 10'F TO ADJACENT AREAS - - O
<br /> FDC FIRE DEPARTMENT CONNECTION SPEC SPECIFICATION _ Z:,t " E
<br /> Ff FINISHED FLOOR SO SCREENED OPENING f 16 X16"OQSL_# ACOUSTICALLY LINED DUCT 23. ALL ADHESIVES,SEALANTS,PAINTS AND COATINGS USED DURING THE INSTALLATION/FINISH WORK SHALL MEET THE LED REQUIREMENTS FOR IEQ. - � ; I.
<br /> ^„ -'
<br /> FlC FURNISHED AND INSTALLED BY CONTRACTOR SOG SLAB ON GRADE OD=OUTSIDE DIMENSIONS 24. MAXIMUM STANDARD LENGTH OF FLEXIBLE DUCT SHALL BE PER BUILDING STANDARDS OR 12'MAX;UP TO 25'MAXIMUM LENGTH IS ACCEPTABLE •�. s_ `, J?>. ,__,_, -no FURNISHED FURNISHED AND INSTALLED BY OWNER SP STATIC PRESSURE SL-SOUND LINING(THICKNESS) IF'FLEX DUCT(UL-181 TESILI&NOT"CONNECTOR}IS USED,DUCT 0 IS INCREASED BY 1 NOMINAL SIZE&BENDS DO NOT EXCEED 235' •FLA FULL LOAD AMPS SF SQUARE FEET TOTAL.REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENTS.FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE<25 AND SMOKE
<br /> FLEX FLEXIBLE SS STARLESS STEEL ...•, FABRIC DUCT DEVELOPED RATING SHALL 8E A 50.USE THERMAFLEX MODEL G-KM FOR LOW AND MEDIUM PRESSURE APPUCATIONS OR APPROVED EQUAL MI \ I `,.F
<br /> FIR FLOOR STRUC STRUCTURAL CLEARANCE
<br /> FOB FIAT ON BOTTOM TA TRANSFER AR ® 25. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL.THE ELECTRICAL DESIGN&CONTRACTOR
<br /> FOC FURNISHED BY OTHERS, TEMP TEMPERATURE/TEMPORARY SUPPLY AIR DIFFUSER TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS-SEE ELECTRICAL DRAWINGS. THE MECHANICAL •^y ilk'_
<br /> TER (WITH CORE BLANKOFf ROTA CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION WITH A VISIBLE ;s)'
<br /> INSTALLED BY CONTRACTOR 1BD TO BE DETERMINED
<br /> FOS FLIT ON SIDE TOED TOP OF DUCT
<br /> / TT) DISPLAY/NOTIFICATION READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL AS REQUIRED. I t. .G n •, ;.
<br /> FOT FIAT ON TOP TOS TOP OF STEEL/TOP OF SLAB ® CEILING EXHAUST AIR GRILLE 26. THE PROJECT TEAM IS COLLECTIVELY RESPONSIBLE FOR COMPLIANCE WITH TrC4121�((APPENDIX EL'RENEWABLE ENERGY SYSTEMS.'AS WELL AS -- • r
<br /> FP ARE PROTECTION TOT TOTAL C406-EFFICIENCY PACKAGES'AS APPLICABLE TO THE PROJECT AND AS COORDINATED DURING DESIGN WITH ENTIRE DESIGN/CONSTRUCTION - 11- ' -PEA OF WOW '
<br /> FPM FEET PER MINUTE TSP TOTAL STATIC PRESSURE 0 CQUNG RETURN OR TRANSFER TEAM. a a,Te'
<br /> FSAE FIRE SERVICE ACCESS ELEVATOR ISTAT THERMOSTAT AIR GRILLE
<br /> E
<br /> FSD FIRE/SMOKE DAMPER TYT' TYPICAL ® SLOTTED DIFFUSER(PLAN VIEW)
<br /> E FOOT/FEET UH UNIT HEATER �`'''`'� __'
<br /> FUT FUTURE UNO UNLESS NOTED OTHERWISE 3 < REVISION CLOUD&TRIANGLE C /FV FACE VELOCITY V VOLT 1••.^�•✓��Y ROUND DUCT SYMBOL � �+
<br /> G GRILLE VA VENTILATION AIR ',VIM FLATOVAL DUCT SYMBOL Y 4 1/4 > osfoe/u t1� PERMR RESPONSE
<br /> GA GAUGE/GALLON VD VOLUME DAMPER /f DEGREES SYMBOL 1S ! . , ti T�F T' ,./
<br /> ,J" -
<br /> GALV GALVANIZED VEL VELOCITY ei PONT OF CONNECTION 0 ` I - i •+.. _ fl .,� ) 04/11/z3 GG ISSUE FOR PERMR
<br /> GC GENERAL CONTRACTOR VENT VERTICAL Sd1L-1QQ CARD TAG IDENTIFIER- TYPE-CFM > CITYOF EVERETT
<br /> -` No. Date By Description
<br /> GPM GALLONS PER MINUTE WTI VARIABLE FREQUENCY DRIVE 8'0 SIZE N Ill GRD GRILLE/REGISTER/DIFFUSER VOL VOLUME T T'STAT/TEMP SENSOR ®CARBON DIOXIDE SENSOR 0 -_ 4 p^�'i`A �.
<br /> HD HEAD
<br /> GNERD WALL BOARD AM WEPPED BULB°UCT gH HUMIDITY SENSOR J_ ' Q R��t FOR ".A`.!'9 T
<br /> HORIZ HORIZONTAL WG WATER GAUGE SMOKE DETECTOR ()CARBON MONOXIDE SENSOR E 0 SITE MAP Design Team
<br /> HP HORSEPOWER W/ WITH O ► �w .. Dea1Rn BEG
<br /> HR HOUR µ/O WITHOUT ©STATIC PRESSURE SENSOR illC _ NO SCALE
<br /> HSPF HEATING SEASONAL PERFORMANCE FACTOR W/SF WATTS PER SQUARE FOOT ®OCCUPANCY SENSOR 7,NITROGEN DIOXIDE SENSOR ` I Permit it: M2304-034 Dawn `PR
<br /> HT HEIGHT WAC WASHINGTON ADMINISTRATIVE CODE 'i 4.3
<br /> HOG HIGH WALL TRANSFER GRILLE WSEC WASHINGTON STATE ENERGY CODE
<br /> HOUR NOT WATER RETURN i } EXISTING DUCTWORK O o� : Site Address: 8531 EVERGREEN WAY Chocked DEN
<br /> RS HOT WATER SUPPLY ��y//y�l
<br /> Mx HEAT EXCHANGER {111/lC DEMO DUCTWORK c. Owner: COMMUNITY HEALTH CENTER OF i../ EcEovED
<br /> EO Construction Nu N mDe OX-AX-RS]EG
<br /> HZ HERTZ 1 WALL-MOUNTED GRILLE re
<br /> 2 PIPE ELBOW UP a S NO HO M IS H CO ,.�e Data am 02/XX/23
<br /> �-> PIPE ELBOW DH
<br /> Additional Permits Are Required t a 1 DIRECTOR OF FLOW ae'a . Tenant: COMMUNITY HEALTH CNTR SNORED CITY
<br /> i -- 1 DIRECTION OF SLOPE DOWN
<br /> J.
<br /> 2 3 PLUG OR CAP �'' App.Date: 4/12/2023 MAY 2 $ 2023 COVER
<br /> 1 1 PRESS REDUCING ASSEMBLY C
<br /> For This Project To Include: 1 SOLENOID VALVE Q 3 . Permit Type: MECHANICAL
<br /> 2 I 1 PUMP E • SHEET
<br /> 0-CAWS/CHWHO CHILLED WATER SUPPLY/RETURN E Subtype: COMMERCIAL MECHANICAL(PLAN REVIEW CITY OF EVERETT -HVAC
<br /> ❑ P• lumbing ❑ Sprinkler T--RN '-9 REFRIGERANT UOUID/SUCTION
<br /> NC- NATURALGAS 0
<br /> v REQUIRED) Permit Services
<br /> 1- LPG 5 LIQUID PROPANE GAS 15
<br /> El M• echanical ❑ Fire Alarm 1-CDWS/CDWHO CONDENSER WATER SUPPLY/RETURN E Description: INSTALL MULTIPLE LINTS, REFRIDGE PIPING
<br /> 1-HWS/HWR-I HEATING WATER SUPPLY/RETURN v FOR CITY USE
<br /> T-CONED CONDENSATE Z
<br /> /S:1 Electrical 1-FOV-1 FUEL OIL VENT 0Date: dZ G�L�'7Af�
<br /> R-FOS/FORS FUEL OIL SUPPLY/RETURN .
<br /> A-RDG� REFRIGERANT DISCHARGE GAS Reviewed
<br /> tice Set Job Site Set
<br />
|