|
•
<br /> TABLE 305.E
<br /> STANDARD METHODS I
<br /> PIPING SUPPORT SPACING. •" DUCT CONSTRUCTION STANDARDS. '..._ �HermanSOn
<br /> MAXIMUM MAXIMUM DUCT CONSTRUCTION STANDAR.;' *Hermdns011 NEW AND EXISTING CONDITIONS Hermanson
<br /> PIPING MATERIAL HORIZONTAL VERTICAL -
<br /> SPACING(feel) SPACING(feet) -
<br /> ABS I,'i l,c 4 10' NE FORSSTRLA ION EOISTINOACOS CONSTRUCTION SEW CONSTRUCTOR
<br /> FLATEXISTING CONSTRUCTION FLAT SLABS Building Today,De/fining Tomorrow
<br /> Aluminum pipe and tubing 10 15 PLUMBING AND PIPING HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED
<br /> •BANGER INSERT •MINI UNDERCUT INSERT •BANGER INSERT •WEDGE ANCHOR DOLT He mme n Company LIP
<br /> Cat-iron pipee 5 15 HANGER MATRIX BY PIPE MATERIAL •CABLE•BOLTA„ITHens°„EYE`Ef EN° •LADLE.BOLT AND WITw.s„FaELET F"° •THREADED ROD ••Tor AND ROD COUPLING tin 2M Avenue North
<br /> NREAOEo ROD Keg.Muninoton 95032
<br /> Copper or copper-alloy pipe 12 ILA 12 _,� TM(706)575-9700
<br /> - I I Faa:(206)575-08E0
<br /> Copper or copper-alloy tubing 8 10 schedule BO/Sta..,rd.rn.•,,eutinme WNWO.GrAwea www.nem,anaon ewn
<br /> . ... d,Socket
<br /> CPVC'pipe or tubing,I inch 3 ILA, _. __.. canudcmr E•9 l:Hmlelt0msv
<br /> and smaller �
<br /> C•P\'C'pipe or tubing.I'',inches - I
<br /> andlan. 4 '°' - I. II I II CHC SNOH CO
<br /> Lead piper Continuous 4 > I ,D TeC
<br /> Pe pipe ur tubing _=,(32 inches) 4 ° NEW CONSTRUCTION EXISTING CONSTRUCTION NEWCONSTRUCTION OUSTINo CONSTRUCTION
<br /> S.Fedv�e40/SO„-MydT.,,.,i3O.F,„n,.nn.n.,ocu,S.,dotl PAN-0ECR CONCRETE SLABS CO CONCRETE SLABS PAMOECK CONCRETE SLABS PAN-0ECK CONCRETE SLABS SOUTH EVERETT
<br /> RAN DE
<br /> PE-RT I inch and smaller 2:.,(32 inches) 10' W -r.— HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED ANNEX
<br /> •CABLE N H RE •WBODE ANCHOR - •DEWALT r091NSERT •WEDGE ANCHOR DOLT TA
<br /> A0.0R •ROD COUPLING•N°NUT •NUT AND ROD COUPLING
<br /> PE-RTI ,inches and larger 4 ILA __- _ - -c TOGGLE END •CgSLE WITH INI'EYELET END .THREADED ROD •THREADED ROD
<br /> •NUT AND WASHER
<br /> PEX Tubing I nch and smaller 2,(32 inches) IO or N+• _ L 8EVE EVERGREEN WAY
<br /> ir•inPEX tubing I',inches and larger 4 1P' �• ^^^• NN•noc EVERETT,WA 98208
<br /> Polypropylene(PP)pipe or 2'';,(32 inches) 10' I _ .
<br /> robing.I inch and smaller ' „_r ,I _ —__ _:
<br /> Polypropylene(PP)pipe ace _ J !
<br /> tubing,I',inches and larger _ __ '
<br /> Stooltubing S IB " ••n•one lAT•..er••, ALL CONSTRUCTION ALL CONSTIRUCTION ALL CONSTRUCTION t\\COUOq R
<br /> PVC PIPe
<br /> o H.
<br /> -- UCTION ALL CONSTRUCTION AC O\xnSN y,.
<br /> STEEL BEAMS BAR JOISTS STEEL BEAMS BAR JOISTS ,, 9
<br /> Steel pipe 12 IS c A r'"A L
<br /> r _ I HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED y, /'"
<br /> For$1'IiM'h-l5.imm,l l'wl-7W.%min. •SEAM CLAMP •.CABLC W'RN LOOP END BEAM CLAMP •� -
<br /> .BEAM CLAMP •.B
<br /> •CABLE WITH tro•EYELET END •THREAD.ROD •THREADED ROD
<br /> a.See Section 301.I% do,rn. sod •NUT •NUT \�rw0
<br /> b.The maximum hn I spacing f - pipe bangers stall be .BOLT AND WASHER �nrlFm
<br /> A a
<br /> increased to ID feet where 10-foot lengths of pipe are installed. '- "' "' -..m„
<br /> e.Mid-slope unit', ur r... w
<br /> 'o NW.UNRRA h
<br /> •• E
<br /> Ii
<br /> in
<br /> I. l
<br /> ISSUE FOR PERMIT
<br /> r um_ Of.Oa
<br /> M IINEIOL H-4-02
<br /> P-H-MAT y Key Plan
<br /> DUCT CONSTRUCTION STANDARDS 3Hermanson
<br /> RECTANGULAR••D•D•MO w1Nw. Rrw±1,w•more DUCT j ECTAN°ULA„DUCTal RE eTANOFIiR DUCT RECTAN •GULAR DUCTRECTANGULAR°UCP RECTANGULAR DUCT
<br /> SUPPORTS REQUIRED IF.Sv •SUPPORTS
<br /> axe REQUIR nen ED
<br /> SUPPORTS REQUI OM RE° SU•i PPOO•L THREAD.RFO IR,
<br /> t.
<br /> BEARER ROO
<br /> LREQUIRED x ' REQUIRED RER REQUIRE° BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED
<br /> •
<br /> :[.><"'`).<--1 i
<br /> J Revisions
<br /> i
<br /> I
<br /> OVAL DUCT OVAL DUCT OVAL DUCT OV•L DUCT OVAL DUCT woe°,Vra•°uCY 14,1
<br /> ,w - w•D w-• Tx T. ;w.0 s'lo`.I MOT.
<br /> u,•. w'1 �A...E,a..o . • •
<br /> SUPPORTS REQUIRED SUPPORTS REOUIRED
<br /> SUPPORTS REQUIRED SUPPORTS REQUIRED
<br /> LPPORTS
<br /> SUPPORTS
<br /> UIRED SUPPORTS
<br /> .De e•LV Tw•uD•D ROO .I•C.tV Tx,••x0WOO .I r e•tV e.,°:D°eO:DD° •,-o•LV,„ee.ao•o Roo .,.e cum T.R••D•om�1
<br /> "`Er"Q`''RED UIREDrr BEARER REQUIRED BEARER REQUIRED BEUlE0.REQVIRED BEARER REQUIRED BEARER REQUIRED
<br /> • I I I I 05/09/23 BOG PERMIT RESPONSE
<br /> (•
<br /> u
<br /> J 11 i j 04/11/23 OW ISSUE FOR PERMITrlcER sPacicu�c No. Doe BY Description
<br /> INSTALL HANGERS SHOWN ON... ROUND DUCT ROUND DUCT ROUND DUCT
<br /> ROUND Cl EVERY 10 FEET Iw`••eTe„e'^ n'•"erm 'e^ D,.vne•-••e- °""T"'•'^•ALL MS.
<br /> OVAL Cl EVERY 08 FEET SUPPORTS a ROM..ROO RI...R,c00r RDUNo°VUGT . ..,• ••L•9 •. Design Team
<br /> RECTCAE. �. ..o REQUIRED IRED
<br /> ...�v,.,."o°o:"e° SUPPORTS GA."r.I0.,0.0,00 •a•cav,L.Lw*,Do
<br /> Cl1 EVERY 08 FEET •TOOK SUPPORTS REQUIRED Design BOG
<br /> CEEAEEK iEQV REQx'D YAGA CANOOIEm[9• MI'an Lam BEARER OLQUIRED Bu,P%.1nEOUDReEL°e,LT SEIrARER REO�IRF°n•dw••12 CA RANw • D•.xo Ow Drown EPR
<br /> Checked OTN
<br /> H-4-01 � Pr
<br /> e Construction Number 21-22-22770
<br /> Construction Number XX-XX-X%XXX
<br /> ,ague Onto 02/50/23
<br /> CITY OF EVERETT
<br /> REVIEREVIEWED PERMIT CONSTRUCTION
<br /> WED L� "J FORSTANDARDS
<br /> -HVAC
<br /> FOR CITY USE
<br /> M0.04
<br />
|