Laserfiche WebLink
WRITTEN DlM IONS ON TuI5 DRAINING SHALL HAVE FRECEDETK.E OVER SEAL® DIMENSIONS. <br />CONTRACTOR SHALL VERIFY ALL DIMENSIONS, CONDITIONS, EfG. PERTAINING TO TIE NORK <br />6EEORE PROc®IN6. THE ONNER MIST M NOTIFIED OF ANY VARIATIONS FROM THE <br />DIME151ON5 AND/OR CONDITION5 SHOWN ON TIESE DRAHIN65. ANY SUCH VARIATION SHALL IsE <br />RESOLVED EY THE ONNER FRIOR TO FROGEEDIN5 NITI THE NORK, OR TFz CONTRACTOR SHALL <br />ACCEPT FULL RE51PON5151 ITY FOR THE LOST TO RECTIFY 5AME. <br />1 <br />24"CARDBOARD BAFFLE <br />ALLOW FOR I" AIR SPACE <br />MIN. EXTEND 12" ABOVE <br />I11,15ULATION.� <br />SOLID SHEATHING <br />OR GDX PLYWD, <br />WHERE EXPOSED <br />TO WEATHER <br />TOP PL. <br />IX FASCIA BD <br />W/ METAL — <br />CUTTER <br />2X BIRD BLK'G. K/� <br />2' SCREENED VENT <br />HOLES WITH 1/4" <br />CORROSION RE515TANT <br />METAL MESH GOVERIN6 <br />FIN. FLR. <br />TOP PL. <br />(2) 2x TOP PLATE, LAP GORNER5,--/ <br />OFFSET END JOINTS BY 45' <br />Tfe" 05B. OR PLYWD. SHEATHING. <br />NAIL 6" EDGE, 12" FIELD WITH 8d <br />NAILS UNLE55 NOTED OTHERWISE <br />2x STUDS ® 16" O.G. <br />2x STUDS a 16" O.G. <br />BARRIER BEHIND <br />FOR SIDING TYPE <br />2x BOTTOM P1 <br />2x P.T. 5 <br />ROOFING MATERIAL <br />FINISH PER ELEVATION <br />ON'I/16" OEC SOLID COX 24-0 PLYWOOD <br />SHEATHING; 8d a 6"OC. EDGE <br />8d ® 12" O.G. FIELD <br />(i/16" 055 AOX PLYWD 6 EVE5) <br />MIN. 15# UNDERLAYMENT <br />NAIL b" EDGE, 12" FIELD <br />WITH 8d NAILS, U.N.O. <br />APPRO <br />MANUF <br />j"BW/ X 10" ANCHOR OLT 3"X3"" X � <br />PLATE WA5HER5 A 48" o.G. NO LE55 <br />THAN 4}" 4 NO MORE THAN 12" <br />FROM EA. END SILL CORNER, JOINT, <br />END, OPENING ETG. T" MIN. <br />EMBEDMENT INTO GONG. EXCEPT <br />SHEAR WALLS - SEE SHEAR WALL <br />NAILIN6 SCHEDULE. <br />HANDRAIL: <br />GRIP I1144" - 2" m <br />PROJECTION FROM <br />WALL NO LE55 <br />THAN IVj". <br />A <br />z <br />S <br />n 11 <br />III �I <br />OPEN RAIL: <br />PIGKSPACE DETHEE <br />SETH SHALL BEARN III III III <br />I II II 11 <br />VED TRU55E5 BEARING III <br />GTURER5 SEAL. Y <br />OF FRAMING PLAN / <br />AGN6 <br />Iy� � <br />Hs"X 10" ANCHOR BOLT W/ 3"X3"X / <br />1/4 " PLATE WASHERS8" a 4a O. NO <br />LE55 THAN 4)'2' S NO MORE THAN 12" 2X4 STOP <br />FROM EA. END SILL CORNER, JOINT, <br />END, OPENIN6 ETC '1" MIN. <br />EMBEDMENT INTO GONG. EXCEPT ® 2-2X HEADER <br />SHEAR NALL5 - SEE SHEAR WALL <br />NAILING SCHEDULE. <br />2x P.T. SILL FLOOR J015T <br />I <br />I <br />z_ <br />F ° #4 REBAR ® 16" O.G. HORIZONTAL <br />X j FIREBLOGK STAIRS: \ <br />STS F ONCE IN TOP 4 BOTTOM <br />OF RUN BETWEEN STRINGERS \ <br />a ° #4 REBAR ® 48" O.G. VERTICAL 8 ALON6 RUN BETWEEN STUDS <br />v <br />USABLE SPACE UNDER STAIRS <br />aTO BE I HR FIRE GONSTRUGTION <br />5/8" TYPE 'X' 6.N.B. (TWO LAYERS <br />AT STAIR GEILING) <br />#4 REBAR <br />W "J" BAR <br />ALL FOOTINGS TO BEAR ON <br />BEARING 501L <br />WALL GREATER THAN 4'-0" PER PLAN <br />5717. FOUNDATION 17E7AIL <br />GI SCALE: N.T.S. PER IRS R403.1.5 #5 <br />6 MIL. VAPOR <br />BARRIER BETWEEN <br />4" GONG. SLAB ON CONCRETE SLAB 4 <br />4" 6RANULAR BED GRANULAR BED <br />R-10 INSULATION; <br />EXTEND UNDER 5L <br />IN HEATED AREAS <br />STAIR 17ETAIL - TYPICAL <br />GI SCALE. N.T.S. <br />FIN. FLR. <br />.: D.E. POSITIVEDFAIN TO STORM 5r5TEM <br />AKA-r FROM 5JILDINr, W. <br />Air NOW <br />C <br />4" A PERE. FOOTING DRAIN <br />W/ CLOTH COVER 4 6RANU <br />COVER A5 REOV. BY 501L <br />GONDITION5 <br />SI 31iIV/2 !—W1 <br />111 <br />z � I_I—III—III III I I I <br />—III—III— <br />I#i ALL REINFORCEMENT <br />MUST BE TIED IN PLACE <br />- — FOR FOUNDATION INSPEGITON <br />SEE FOUNDATION PLAN <br />FOR FTC. / PON, SIZE <br />ALL FOOTINGS TO BEAR ON <br />BEARING 501L <br />TYPICAL WALL SECTIONS <br />61 SCALE: N.7.5. <br />0 <br />a <br />FLAC04MIfP PBR <br />•2 ABOVE <br />GAF% <br />4" GONG <br />4" 6RAN <br />ALL FOOTIN55 TO BEAR ON <br />BEARING SOIL <br />NASH $ ARCHITECTS <br />GENERAL NOTES: <br />L All constructlon per applicable codes and ordinances. <br />C. 2018 IRG, IB <br />2. Verify al dimensions an Job site. Bring discrepancies <br />to the attention of Owner and/or Designer. <br />3. Owner will verify window sizes and manufacturer(s) Kith <br />framer before start of construction. <br />NOSING <br />4. One Ninda" per bedroom shall meet egress code. <br />5. 5kyilght glazing per 2015 IBC. <br />6. Truss manufacturer shall supply shop draNings to Owner <br />and Framer to revleN and approve before fabricatlon. <br />7. Owner NIII verify electrical and heat layouts Nlth <br />Installer before Installation. <br />8. Under all parallel bearing Nails, use double Joists or as <br />noted on plan, Double joist (or extra TJI) under all non - <br />bearing parallel Nails. <br />4N6ER <br />9. TJI products to be Installed per manufacturer's <br />Installatlon guide and approved reports. <br />10. All metal connections to treated wood shall be at a <br />minimum; triple zinc ZMAX (6185 per A5TM A653); Hot Dip <br />Galvanze (A5TM A125 for connectors and A5TM153 for <br />fasteners and anchors. <br />11. All bathroom fans, kitchen hood, and dryer ducts shall be <br />exhausted through the attic to the roof or through the <br />floor system to an outside Nall. All Nall ducts shall <br />terminate at least 36" from a NlndoN opening. <br />STRIN6ER5 <br />STAIR NOTES: <br />RISER HEIGHT = 7-5/4" MAX. <br />TREAD DEPTH = 10" MIN. <br />REBAR FLAC49 W PER <br />DETAL 62 ABOVE <br />CLIMATIC AND GEOGRAPHIC <br />DESIGN CRITERIA: <br />TERMITE: SLIGHT TO MODERATE <br />DECAY: BLIGHT TO MODERATE <br />WINTER DE516N TEMP: IT° <br />IGESHIELD REQUIRED: NO <br />FLOOD HAZARDS: 2003 1992 FIRM <br />AIR FREEZING INDEX: 250 <br />MEAN ANNUAL TEMP: 50 <br />DESIGN DATA: <br />ROOF LOADS: LL 25#/5F (SNOW) <br />DL 15#/SF <br />TOTAL 40#/SF <br />FLOOR LOADS: ILL 40#/SF <br />DL 10#/SF <br />TOTAL 50#/5F <br />DECK LOADS: LL 60#/5F <br />DL 10#/5F <br />TOTAL TO#/5F <br />SOIL : 1500 P5F <br />CONCRETE: 2500 PSI AFTER 28 DAYS <br />(Slit SACK MIX) <br />-5000 P51 FOR EXTERIOR FOUNDATION <br />WALLS, PORCHES, STEPS, AND OR <br />6ARA6E SLABS- AIR ENTRAINMENT <br />15 BETWEEN 5-7% (TABLE 402.2 IRG) <br />MASONRY : PER 2016 IBC <br />STEEL : PER 2018 IBG (GRADE 60) <br />WOOD : PER 2018 IBC <br />NAILING : PER 2018 IRG NAILING PER TABLE <br />Rb02.30 <br />WIND: 85 MPH <br />5EISMIG ZONE - D <br />V = see design calculatlons(Wdl) <br />WEATHERING POTENTIAL: MODERATE <br />FP05T LINE: 12" <br />E.F.P.: 45 PSF <br />4" BEAM: DOl16LA5 FIR #2 <br />fV = ISO <br />fb = 900 P51 <br />E = 1,600,000 <br />6" BEAM: DOUGLAS FIR #2 <br />fV= 170 <br />fb = 8T5 F51 <br />E = 1,300,000 <br />4" POST. DOU61LA5 FIR #2 <br />FG II = 1550 P51 <br />E - 1,600,000 <br />b" P05T: DOU61-A5 FIR #2 <br />FG 11 = "700 PSI <br />E 1,300,000 <br />J015T5 t RAFTERS HEM FIR #2 <br />d STUDS: fv = SO <br />fb = 850 PSI <br />E = 1,3001000 <br />5LU-LAM BEAMS: <br />fv = 240 psi <br />fb = 2,400 psi (reduced by size <br />factor, GF•KU <br />E 1,500,000 psl <br />NOTE: <br />VARIATIONS FROM THE ABOVE <br />LUMBER 6RADES WILL BE <br />NOTED ON THE PLANS, <br />I. 5UBFLOOR: <br />T40 PLYWOOD OR 0513 APA RATED <br />5R1RD-I-FLOOR 16" O.G., 3/4" <br />WALL 4 ROOF SHEATHING: <br />APA RATED SHEATING 24/16 1/16" <br />c <br />� m <br />IrrW cn <br />W �s <br />as V ZZ� <br />J 6 <br />o <br />' LI1 <br />O O <br />T- -A <br />Z t— <br />Z <br />W tL- <br />,> <br />Q <br />w <br />tu <br />Z_ <br />V � O <br />� N � <br />L !i <br />L <br />Q <br />date: 10-6-22 <br />permit: <br />-evlsians: <br />5-2o-a4 <br />drawn by LMD <br />chBck®d by: MWJ <br />SHEET <br />GI <br />#4 REBAR <br />W "J" BAR <br />ALL FOOTINGS TO BEAR ON <br />BEARING 501L <br />WALL GREATER THAN 4'-0" PER PLAN <br />5717. FOUNDATION 17E7AIL <br />GI SCALE: N.T.S. PER IRS R403.1.5 #5 <br />6 MIL. VAPOR <br />BARRIER BETWEEN <br />4" GONG. SLAB ON CONCRETE SLAB 4 <br />4" 6RANULAR BED GRANULAR BED <br />R-10 INSULATION; <br />EXTEND UNDER 5L <br />IN HEATED AREAS <br />STAIR 17ETAIL - TYPICAL <br />GI SCALE. N.T.S. <br />FIN. FLR. <br />.: D.E. POSITIVEDFAIN TO STORM 5r5TEM <br />AKA-r FROM 5JILDINr, W. <br />Air NOW <br />C <br />4" A PERE. FOOTING DRAIN <br />W/ CLOTH COVER 4 6RANU <br />COVER A5 REOV. BY 501L <br />GONDITION5 <br />SI 31iIV/2 !—W1 <br />111 <br />z � I_I—III—III III I I I <br />—III—III— <br />I#i ALL REINFORCEMENT <br />MUST BE TIED IN PLACE <br />- — FOR FOUNDATION INSPEGITON <br />SEE FOUNDATION PLAN <br />FOR FTC. / PON, SIZE <br />ALL FOOTINGS TO BEAR ON <br />BEARING 501L <br />TYPICAL WALL SECTIONS <br />61 SCALE: N.7.5. <br />0 <br />a <br />FLAC04MIfP PBR <br />•2 ABOVE <br />GAF% <br />4" GONG <br />4" 6RAN <br />ALL FOOTIN55 TO BEAR ON <br />BEARING SOIL <br />NASH $ ARCHITECTS <br />GENERAL NOTES: <br />L All constructlon per applicable codes and ordinances. <br />C. 2018 IRG, IB <br />2. Verify al dimensions an Job site. Bring discrepancies <br />to the attention of Owner and/or Designer. <br />3. Owner will verify window sizes and manufacturer(s) Kith <br />framer before start of construction. <br />NOSING <br />4. One Ninda" per bedroom shall meet egress code. <br />5. 5kyilght glazing per 2015 IBC. <br />6. Truss manufacturer shall supply shop draNings to Owner <br />and Framer to revleN and approve before fabricatlon. <br />7. Owner NIII verify electrical and heat layouts Nlth <br />Installer before Installation. <br />8. Under all parallel bearing Nails, use double Joists or as <br />noted on plan, Double joist (or extra TJI) under all non - <br />bearing parallel Nails. <br />4N6ER <br />9. TJI products to be Installed per manufacturer's <br />Installatlon guide and approved reports. <br />10. All metal connections to treated wood shall be at a <br />minimum; triple zinc ZMAX (6185 per A5TM A653); Hot Dip <br />Galvanze (A5TM A125 for connectors and A5TM153 for <br />fasteners and anchors. <br />11. All bathroom fans, kitchen hood, and dryer ducts shall be <br />exhausted through the attic to the roof or through the <br />floor system to an outside Nall. All Nall ducts shall <br />terminate at least 36" from a NlndoN opening. <br />STRIN6ER5 <br />STAIR NOTES: <br />RISER HEIGHT = 7-5/4" MAX. <br />TREAD DEPTH = 10" MIN. <br />REBAR FLAC49 W PER <br />DETAL 62 ABOVE <br />CLIMATIC AND GEOGRAPHIC <br />DESIGN CRITERIA: <br />TERMITE: SLIGHT TO MODERATE <br />DECAY: BLIGHT TO MODERATE <br />WINTER DE516N TEMP: IT° <br />IGESHIELD REQUIRED: NO <br />FLOOD HAZARDS: 2003 1992 FIRM <br />AIR FREEZING INDEX: 250 <br />MEAN ANNUAL TEMP: 50 <br />DESIGN DATA: <br />ROOF LOADS: LL 25#/5F (SNOW) <br />DL 15#/SF <br />TOTAL 40#/SF <br />FLOOR LOADS: ILL 40#/SF <br />DL 10#/SF <br />TOTAL 50#/5F <br />DECK LOADS: LL 60#/5F <br />DL 10#/5F <br />TOTAL TO#/5F <br />SOIL : 1500 P5F <br />CONCRETE: 2500 PSI AFTER 28 DAYS <br />(Slit SACK MIX) <br />-5000 P51 FOR EXTERIOR FOUNDATION <br />WALLS, PORCHES, STEPS, AND OR <br />6ARA6E SLABS- AIR ENTRAINMENT <br />15 BETWEEN 5-7% (TABLE 402.2 IRG) <br />MASONRY : PER 2016 IBC <br />STEEL : PER 2018 IBG (GRADE 60) <br />WOOD : PER 2018 IBC <br />NAILING : PER 2018 IRG NAILING PER TABLE <br />Rb02.30 <br />WIND: 85 MPH <br />5EISMIG ZONE - D <br />V = see design calculatlons(Wdl) <br />WEATHERING POTENTIAL: MODERATE <br />FP05T LINE: 12" <br />E.F.P.: 45 PSF <br />4" BEAM: DOl16LA5 FIR #2 <br />fV = ISO <br />fb = 900 P51 <br />E = 1,600,000 <br />6" BEAM: DOUGLAS FIR #2 <br />fV= 170 <br />fb = 8T5 F51 <br />E = 1,300,000 <br />4" POST. DOU61LA5 FIR #2 <br />FG II = 1550 P51 <br />E - 1,600,000 <br />b" P05T: DOU61-A5 FIR #2 <br />FG 11 = "700 PSI <br />E 1,300,000 <br />J015T5 t RAFTERS HEM FIR #2 <br />d STUDS: fv = SO <br />fb = 850 PSI <br />E = 1,3001000 <br />5LU-LAM BEAMS: <br />fv = 240 psi <br />fb = 2,400 psi (reduced by size <br />factor, GF•KU <br />E 1,500,000 psl <br />NOTE: <br />VARIATIONS FROM THE ABOVE <br />LUMBER 6RADES WILL BE <br />NOTED ON THE PLANS, <br />I. 5UBFLOOR: <br />T40 PLYWOOD OR 0513 APA RATED <br />5R1RD-I-FLOOR 16" O.G., 3/4" <br />WALL 4 ROOF SHEATHING: <br />APA RATED SHEATING 24/16 1/16" <br />c <br />� m <br />IrrW cn <br />W �s <br />as V ZZ� <br />J 6 <br />o <br />' LI1 <br />O O <br />T- -A <br />Z t— <br />Z <br />W tL- <br />,> <br />Q <br />w <br />tu <br />Z_ <br />V � O <br />� N � <br />L !i <br />L <br />Q <br />date: 10-6-22 <br />permit: <br />-evlsians: <br />5-2o-a4 <br />drawn by LMD <br />chBck®d by: MWJ <br />SHEET <br />GI <br />DESIGN DATA: <br />ROOF LOADS: LL 25#/5F (SNOW) <br />DL 15#/SF <br />TOTAL 40#/SF <br />FLOOR LOADS: ILL 40#/SF <br />DL 10#/SF <br />TOTAL 50#/5F <br />DECK LOADS: LL 60#/5F <br />DL 10#/5F <br />TOTAL TO#/5F <br />SOIL : 1500 P5F <br />CONCRETE: 2500 PSI AFTER 28 DAYS <br />(Slit SACK MIX) <br />-5000 P51 FOR EXTERIOR FOUNDATION <br />WALLS, PORCHES, STEPS, AND OR <br />6ARA6E SLABS- AIR ENTRAINMENT <br />15 BETWEEN 5-7% (TABLE 402.2 IRG) <br />MASONRY : PER 2016 IBC <br />STEEL : PER 2018 IBG (GRADE 60) <br />WOOD : PER 2018 IBC <br />NAILING : PER 2018 IRG NAILING PER TABLE <br />Rb02.30 <br />WIND: 85 MPH <br />5EISMIG ZONE - D <br />V = see design calculatlons(Wdl) <br />WEATHERING POTENTIAL: MODERATE <br />FP05T LINE: 12" <br />E.F.P.: 45 PSF <br />4" BEAM: DOl16LA5 FIR #2 <br />fV = ISO <br />fb = 900 P51 <br />E = 1,600,000 <br />6" BEAM: DOUGLAS FIR #2 <br />fV= 170 <br />fb = 8T5 F51 <br />E = 1,300,000 <br />4" POST. DOU61LA5 FIR #2 <br />FG II = 1550 P51 <br />E - 1,600,000 <br />b" P05T: DOU61-A5 FIR #2 <br />FG 11 = "700 PSI <br />E 1,300,000 <br />J015T5 t RAFTERS HEM FIR #2 <br />d STUDS: fv = SO <br />fb = 850 PSI <br />E = 1,3001000 <br />5LU-LAM BEAMS: <br />fv = 240 psi <br />fb = 2,400 psi (reduced by size <br />factor, GF•KU <br />E 1,500,000 psl <br />NOTE: <br />VARIATIONS FROM THE ABOVE <br />LUMBER 6RADES WILL BE <br />NOTED ON THE PLANS, <br />I. 5UBFLOOR: <br />T40 PLYWOOD OR 0513 APA RATED <br />5R1RD-I-FLOOR 16" O.G., 3/4" <br />WALL 4 ROOF SHEATHING: <br />APA RATED SHEATING 24/16 1/16" <br />c <br />� m <br />IrrW cn <br />W �s <br />as V ZZ� <br />J 6 <br />o <br />' LI1 <br />O O <br />T- -A <br />Z t— <br />Z <br />W tL- <br />,> <br />Q <br />w <br />tu <br />Z_ <br />V � O <br />� N � <br />L !i <br />L <br />Q <br />date: 10-6-22 <br />permit: <br />-evlsians: <br />5-2o-a4 <br />drawn by LMD <br />chBck®d by: MWJ <br />SHEET <br />GI <br />