My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Casne Engineering, Inc. 9/24/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Casne Engineering, Inc. 9/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 12:29:54 PM
Creation date
9/25/2024 12:29:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Casne Engineering, Inc.
Approval Date
9/24/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Dan Enrico
Subject / Project Title
Electrical Engineering Design and Construction Services for the Lift Station 47 - Beverly Lake Sanit
Tracking Number
0004529
Total Compensation
$31,442.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
July 30, 2024 <br />LS 47 - Beverly Lake Sewer Replacement Project <br />Electrical Engineering Services <br />Scope^ƵŵŵĂƌLJ <br />The existing electrical design will be reviewed, updated and stamped. The current design package <br />contains seven electrical sheets, as well as electrical specification sections. We will review and update <br />the design to meet NEC and local code requirements and implement updates to ensure a complete and <br />practical electrical installation. <br />We will support the City of Everett during the bid phase, including an onsite bid meeting with <br />prospective bidders and answering electrical related bid questions from bidders. <br />Construction phase service will include electrical product submittal reviews and RFI response, <br />supporting coordination between Snohomish PUD and electrical contractor, assisting with <br />commissioning planning, onsite commissioning support with owner and the integration team (City of <br />Everett performing programming internally). Upon construction completion, we will assist in completing <br />and stamping record drawings, perform the Arc Flash study, and provide Arc Flash labels. <br />Payment <br />Payment shall be by monthly progress report for actual time and materials.
The URL can be used to link to this page
Your browser does not support the video tag.