2021 WASHINGTON STATE ENERGY CODE NOTES 2021 GENERAL NOTES DUCTWORK LEGEND ABBREVIATIONS LEGAL INFORMATION
<br /> 1. THE COMPLIANCE PATH IS PRESCRIPTIVE. 1. COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE LATEST ADOPTED VERSION OF THE INTERNATIONAL BUILDING SYMBOL DESCRIPTION AAV AUTOMATIC AIR VENT ADDRESS:2300 MERRILL CREEK PKWY,EVERETT,WA 98203
<br /> 2. WSEC C103.fi:CLOSEOUT DOCUMENTS SHALL BE PROVIDED TO THE OWNER. CODE(IBC),INTERNATIONAL MECHANICAL CODE(IMC),WASHINGTON STATE ENERGY CODE(WSEC),UNIFORM PLUMBING CODE(UPC), ABV ABOVE
<br /> 3. WSEC C403.7.8.3:DAMPERS INSTALLED TO COMPLY WITH REQUIREMENTS,AND SHALL HAVE A MAXIMUM LEAKAGE RATE WHEN TESTED IN ACCORDANCE WITH AMCA INTERNATIONAL FIRE CODE(IFC),NFPA,AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL JURISDICTIONS AND AD ACCESS DOORI AREA DRAIN PARCELM 28040200300200
<br /> STANDARD 500D OF: WASHINGTON STATE. ® SUPPLY DIFFUSERIGRILLE AFF ABE FINISHED FLOOR AgMechanicai
<br /> A. MOTORIZED DAMPERS:CLASS 1,4 CFMISQ.FT.OF DAMPER AREA AT 1.0INCH W.G. AG ABOVE GRADE ZONING:N/A
<br /> B. NON-MOTORIZED DAMPERS:20 CFM/SO.FT.OF DAMPER AREA AT 1.0INCH W.G.,EXCEPT THAT FOR NON-MOTORIZED DAMPERS SMALLER THAN 24INCHES IN 2. MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN NATURE,AND DO NOT NECESSARILY REFLECT EVERY REQUIRED OFFSET,FITTING,OR AL ALUMINUM
<br /> EITHER DIMENSION:40 CFM/SQ.FT.OF DAMPER AREAAT 1.0 INCH W.G. ACCESSORY.THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE DOCUMENTS THAT ARE NOT DEFINITELY RETURN GRILLE ATM ATMOSPHERE LEGAL DESCRIPTION:
<br /> 4. WSECC403.10.2:ALL DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTION OF GALVANIZED DUCTWORK.ALL DUCTWORK SHALL BE SEALED. FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS AV ACID VENT SEC 02 TWP 28 RGE 04LOT 5A OF SEAWAY CENTER FOUR BSP REC VOL I OF BSP'S P.O.Box 249
<br /> DUCT TAPE NOT ALLOWED. MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS.DO NOT SCALE DRAWINGS. ® AN ACID WASTE PG 246-247 AF NO 9203025002 BEING PTN OF SW1/4 2623 West Valley Hwy.Aubum,
<br /> 5. WSEC 0405.8:ELECTRIC MOTOR SHALL MEET THE MINIMUM EFFICIENCY REQUIREMENTS OF TABLE C405.8(1)THROUGH C405.8(4).FRACTIONAL HP FAN MOTORS EXHAUST GRILLE WA 98071
<br /> GREATER THAN 1112HP AND LESS THAN 1 HP SHALL BE ELECTRONICALLY COMMUTATED MOTORS. 3. ITEMS MARKED AS TYPICAL APPLY TO THAT DRAWING SHEET ONLY.UNLESS NOTED OTHERWISE,DETAILS MARKED AS TYPICAL APPLY TO SAS BUILDING AUTOMATION SYSTEM Tel:(253)838-9780
<br /> 6. WSEC C408.1:BUILDINGS SHALL BE COMMISSIONED FOR ALL MECHANICAL AND PLUMBING SYSTEMS.TOTAL MECHANICAL SYSTEMS WITH COOLING CAPACITY LESS THE DRAWING SET. ® SLOT&LINEAR DIFFUSER/GRILLE BFP BACKFLOW PREVENTER Fax:(253)833-1384
<br /> THAN 180,000 BTU/H AND HEATING CAPACITY LESS THAN 240,000 BTU/H ARE EXEMPT FROM THE COMMISSIONING PROCESS PER SEC C408.1 EXCEPTION 1.THE BFV BUTTERFLY VALVE AU-BU-RM1163BA
<br /> LARGEST SERVICE WATER HEATING SYSTEM WITH CAPACITY LESS THAN 200,000 BTU/H WHERE THERE ARE NO POOLS OR PERMANENT SPAS ARE EXEMPT FROM 4. COORDINATE INSTALLATION OF MECHANICAL SYSTEMS WITH BUILDING STRUCTURE AND ALL OTHER TRADES.THE CONTRACTOR SHALL �®�I�I ROUND AND SQUARE DUCT(UP&DOWN) BG BELOW GRADE
<br /> THE COMMISSIONING PROCESS PER SEC C408.1 EXCEPTION 2.WHEN REQUIRED,COMMISSIONING SHALL BE PERFORMED PER WSEC C408 AND SHALL INCLUDE: COORDINATE THE EXACT LOCATION OF DUCTWORK WITHIN THE STRUCTURE AT THE SITE. V� BGS BUG SCREEN
<br /> A. COMMISSIONING PLAN BHP BRADINGMANAGEME VICINITY MAP
<br /> B. SYSTEMS TESTING AND BALANCING 5. ALL EQUIPMENT SHALL BE FREE FROM DEFECTS IN MATERIAL,WORKMANSHIP,AND SHALL BE OF THE KIND AND QUALITY DESCRIBED BARE SHEETMETAL BMS BUILDING MANAGEMENT SYSTEM
<br /> 14x12 12"m 14x1 m ) BOB BOTTOM OF BEAM
<br /> C. HVAC EQUIPMENT AND CONTROLS FUNCTIONAL TESTING HEREIN.ALL EQUIPMENT SHALL BE APPROVED FOR INSTALLATION IN THE STATE OF WASHINGTON AND SHALL HAVE ALL CERTIFICATIONS -- (RECTANGULAR,ROUND,&OVAL
<br /> D. SUPPORTING DOCUMENTATION IN THE FORM OF OPERATION AND MAINTENANCE AND RECORD DOCUMENTS AND RATINGS REQUIRED TO MEET ALL ENERGY,POLLUTION,ENVIRONMENTAL,SEISMIC,LOCAL,STATE,ETC.CODES AND REGULATIONS. _ _ BOD BOTTOM OF DUCT
<br /> SOUNDLINE SHEETMETAL WITH 1"LINING
<br /> E. COMMISSIONING REPORT _14x_14_SL (UNO) BOP BOTTOM OF PIPE
<br /> 7. WSEC C408.2.2:PROVIDE BALANCING DEVICES FOR SUPPLY AIR OUTLETS,ZONE TERMINAL DEVICES AND HYDRONIC COILS,AND AS INDICATED ON THE CONTRACT 6. VERIFY SITE VOLTAGES,PHASES AND ELECTRICAL LOADS PRIOR TO ORDERING ANY EQUIPMENT. BTU BRITISH THERMAL UNITS
<br /> DOCUMENTS.BALANCING DEVICES SHALL INCLUDE,BUT ARE NOT LIMITED TO,DAMPERS,TEMPERATURE AND PRESSURE TEST CONNECTIONS,AND BALANCING G 8^m BTU/HR BRITISH THERMAL UNITS PER HOUR `i25
<br /> VALVES.CONTACT THE ENGINEER FOR CLARIFICATION AND ANY VARIANCES.AIR AND WATER FLOW RATES SHALL BE MEASURED AND ADJUSTED TO DELIVER FINAL 7. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE. /7111I I I FLEX DUCT BTU
<br /> BALL VALVE
<br /> FLOW RATES WITHIN TOLERANCES.
<br /> 8. PROVIDE MECHANICAL EQUIPMENT CLEARANCES,36"FOR MECHANICAL ACCESS OR ELECTRICAL ACCESS ON UNITS OF LESS THAN 460V, 8"m Bz8 ® SQUARE-TO-ROUND TRANSITION CB CATCH BASIN -;L.Ight OUSE'.
<br /> 42"FOR ELECTRICAL ACCESS OF UNITS 460V,OR OTHER CLEARANCES PER THE MANUFACTURERS RECOMMENDATIONS. CC CONTROLS CONTRACTOR 9
<br /> CFH CUBIC FEET PER HOUR
<br /> 9. LOCATIONS AND SIZES OF ALL FLOOR,WALL,AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED. 6z�„8�a TRANSITION/REDUCER CFM CUBIC FEET PER MINUTE
<br /> Cl CASTIRON
<br /> 10. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS'RECOMMENDATIONS,CONTRACT CIRC CIRCULATION
<br /> DUCT CONTINUES
<br /> DOCUMENTS,AND APPLICABLE CODES AND REGULATIONS. CNTR CONTRACTOR MUItIIIE'0
<br /> CO CLEAN OUT
<br /> 11. ALL MECHANICAL EQUIPMENT THAT REQUIRES ACCESS FOR SERVICE AND MAINTENANCE(ELECTRIC COIL PULL,FILTER CHANGE,MOTOR I DUCTCAP CV CHECK VALVE
<br /> CHANGE,COMPRESSOR CHANGE,LUBRICATION,SHEAVE AND BELT CHANGE,FAN CHANGE OUT,ETC).THIS SHALL BE INDICATED WITH A
<br /> PERMANENT SIGN MOUNTED IN THE EQUIPMENT ACCESS PANELS INDICATING THE CLEARANCE AND STATING:"THIS EQUIPMENT MUST y D,(D) DEMO
<br /> HAVE A MINIMUM ACCESS OF(REQUIRED CLEARANCE)'.NO TRADE SHALL BLOCK THIS SPACE." $ FIRE DAMPER DCBP DOUBLE CHECK BACKFLOW PREY. �\
<br /> DCVA DIRE DIGITALC CHECK LVE NTROLASSEMBLY +
<br /> 12. CONTRACTOR SHALL COORDINATE DIFFUSER,GRILLE AND REGISTER LOCATIONS AND DUCT ROUTING CLEARANCES WITH THE DDC DIRECT DIGITAL CONTROL \1
<br /> FIREISMOKE DAMPER
<br /> STRUCTURAL,REFLECTED CEILING,AND LIGHTING PLANS. DFU DRAINAGE FIXTURE UNIT \ -
<br /> ON DOWN
<br /> 13. ALL EQUIPMENT,DAMPERS,PIPING,AND ACCESSORIES IN CONCEALED SPACES REQUIRING ACCESS SHALL HAVE ACCESS DOORS.ALL =r= BALANCING DAMPER TB f -II hi ' S2E
<br /> ACCESS DOORS PROVIDED BY G.C.IN FIRE RATED STRUCTURE SHALL BE FIRE RATED.COORDINATE LOCATIONS WITH ARCHITECT. E,(E) EXISTING D 9 .`, y 6-
<br /> CONTRACTOR TO PROVIDE ACCESS DOORS. ELEC ELECTRICAL
<br /> MOTORIZED DAMPER ELEV ELEVATION
<br /> 14, ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED UNLESS OTHERWISE NOTED. EWT ENTERING WATER TEMPERATURE
<br /> SUPPLY AIR EXH EXHAUST '=
<br /> 15, SERVICE RECEPTACLES SHALL HAVE GFCI PROTECTION LOCATED WITHIN 25 FT.OF EQUIPMENT. EXP EXPANSION
<br /> �i RETURN/EXHAUSTAIR F,(F) FUTURE
<br /> FC FLEXIBLE CONNECTION P3IfleField CQStCQ
<br /> 2021 HVAC NOTES (D OT THERMOSTAT(ROOM/DUCT) FCU FANCOIL UNTO
<br /> FD FLOOR DRAIN
<br /> 1. MATERIALS,METHODS,AND INSTALLATION SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES BASED ON NATIONAL,STATE, SPACE PRESSURE SENSOR(TO EMS) FPM FEET PER MINUTE SITE MAP
<br /> AND MUNICIPAL LAWS,CODES,AND ORDINANCES.THIS PROJECT IS DESIGNED SPECIFICALLY BASED ON THE 2021 WASHINGTON FPS FEET PER SECOND
<br /> MECHANICAL CODE(WSMC),THE 2021 WASHINGTON BUILDING CODE(WSBC)AND THE 2021 WASHINGTON ENERGY CODE(WSEC). FS FLOOR SINK
<br /> SIZE TYPE GRILLE/REGISTER/DIFFUSER TAG FTf FEET
<br /> 2. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH THE 2021 IMC(SECTION 603,ETC)AND WITH CURRENT SMACNA STANDARDS. CFM FTD FOOTING DRAINAGE
<br /> PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH THE 2021 IBC(SECTION 1613,ETC),ASCE 7,AND THE FU FIl(TURE UNIT .
<br /> SMACNA SEISMIC RESTRAINT MANUAL.
<br /> GALV GALVANIZED pp��
<br /> 3. DUCT SIZES SHOWN ON PLAN ARE THE INTERIOR(CLEAR/FREE AREA)DIMENSIONS,UNLESS OTHERWISE NOTED;INCREASE METAL DUCT GENERAL LEGEND GAL GALLONS ~ � SST 1` 'i9
<br /> SIZE TO ACCOUNT FOR DUCT LINER.ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED.OFFSETS IN DUCTS, GC GENERAL CONTRACTOR v � LPE e asrx\�'I�
<br /> INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS.MAINTAIN A DUCTWORK ASPECT RATION OF 2.5 TO 1,OR LESS. GI GREASE INTERCEPTOR - v ,l., `J'
<br /> SYMBOL DESCRIPTION GPH GALLONS PER HOUR - w q 1'�' "V✓
<br /> 4. ALL SUPPLY AND RETURN DUCTS,AIR HANDLERS,AND PLENUMS INSIDE AND OUTSIDE THE HEATED SPACE SHALL BE SEALED AT ALL GPM GALLONS PER MINUTE I
<br /> JOINTS AND CORNERS INCLUDING PREFABRICATED JOINTS AND LONGITUDINAL SEAMS.ALL JOINTS IN THE HVAC DUCTS SHALL BE EQ-01-01 EQUIPMENT TAG GWB GYPSUM WALL BOARD x
<br /> MECHANICALLY FASTENED.
<br /> 2"FX-1 FIXTURE TAG HB HOSE BIBB
<br /> 5. MAXIMUM FLEX DUCT LENGTH IS 8'-0".HANGERS SHALL NOT CRIMP THE DUCTWORK OR REDUCE THE INTERIOR DIMENSION.MAXIMUM SAG HP HEAT PUMP,OR HORSEPOWER9t L-t8^�g P•^♦��2OYAL Er
<br /> FOR SUSPENDED DUCTWORK 131/2'FOR EVERY FOOT OF RUN.FLEXIBLE DUCTWORK SHALL BE ALLOWED TO RUN 12"STRAIGHT FROM <1 FLAG NOTE HX HEAT EXCHANGER
<br /> ANY CONNECTION BEFORE TAKING A TURN.THE RADIUS AT THE CENTERLINE OF A BEND MUST BE A MINIMUM OF ONE DUCT DIAMETER. a~ Oi1Z¢12014
<br /> F o'"
<br /> CONNECTIONS TO BOOTS,COLLARS,TRUNKS,AND EQUIPMENT MUST BE MECHANICALLY FASTENED AND SUBSTANTIALLY AIRTIGHT. POINT OF CONNECTION ID INSIDE DIMENSION p
<br /> SEALANTSAND TAPES USED TO MAKE DUCTWORK AIRTIGHT MUST BE COMPLIANTWITH UL-181 STANDARDSAND INSTALLED ACCORDING IE INVERT ELEVATION
<br /> TO MANUFACTURERS'SPECIFICATIONS.
<br /> 1 Nf' INCHES I
<br /> 6. EQUIPMENT SHALL BE LABELED WITH TAG NAMES PER THE PLANS. M1.00 DETAIL SYMBOL INS INSULATION -
<br /> IRR IRRIGATION ,/F M
<br /> 7. COORDINATE AND PROVIDE ALL DUCT TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT.FIELD TB I
<br /> VERIFY AND COORDINATE ALL DUCT DIMENSIONS BEFORE FABRICATION.THE CONTRACTOR SHALL VERIFY EQUIPMENT CONNECTION 1 LBS/# POUNDS
<br /> ORIENTATION BEFORE DUCTING TO EQUIPMENT. SECTION SYMBOL LINT LEAVING WATER TEMPERATURE
<br /> M1.00
<br /> 8. ALL CUTTING,PATCHING,FRAMING,FIRE SAFING,PAINTING,ROOF OPENING,CURBS,ROOFING,ETC.REQUIRED TO INSTALL MECHANICAL MBH 1,000 BTUIH
<br /> SYSTEMS SHALL BE BY THE GENERAL CONTRACTOR INCLUDING ALL FLASHING FRAMING AND ROOFING OF SHEETMETAL DUCT MECH MECHANICAL
<br /> ENCLOSURES. ZONE1-1-01 ZONE TAG 800 FT2 MH MANHOLE SCOPE OF WORK
<br /> 9. VERIFY THERMOSTAT LOCATIONS WITH THE ARCHITECT.IF NOT SHOWN ON ARCHITECTURAL PLANS,LOCATE ALL ROOM THERMOSTATS N,(N) NEW
<br /> 4'-0"(CENTERLINE)ABOVE FINISHED FLOOR(UNLESS OTHERWISE NOTED).NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE NC NORMALLY CLOSED 1.PROVIDE ONE EXHAUST FAN FOR METROLOGY ROOM AND ASSOCIATE DUCTWORK.
<br /> LOCATION CANNOT BE MAINTAINED,OR WHERE THERE IS A QUESTION ON LOCATION.PROVIDE SECURITY COVERS FOR ALL THERMOSTATS NIC NOT IN CONTRACT
<br /> AND SENSORS. NO NORMALLY OPEN
<br /> 10. OPERATION AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE:SUBMITTAL DATA,NAMES AND OC ON CENTER
<br /> ADDRESSES OF AT LEAST ONE SERVICE AGENCY,HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A OD OUTSIDE DIMENSION MECH SHEETS INDEX 0 PERMIT 04/24/2024
<br /> COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. OFCI OWNER FURNISHED CNTR INSTALL.
<br /> OFD OVERFLOW DRAIN SHEET DESCRIPTION No. Revision/Issue Date
<br /> 11. COORDINATE ALL EQUIPMENT AND SYSTEM OUTAGES WITH OWNER. OFSD OVERFLOW STORM DRAIN M.. M
<br /> OP ECH COVERSHEET
<br /> 12. EQUIPMENT AND PIPE IDENTIFICATION:ALL PIPING IN SERVICEABLE LOCATIONS(INCLUDING ABOVE LAY-IN CEILINGS)SHALL BE OPNG ENING M2.01 METROLOGY ROOM-HVAC KEY PLAN
<br /> IDENTIFIED WITH SEMI-RIGID PLASTIC OR ADHESIVE IDENTIFICATION MARKERS.MARKERS SHALL BE BRADY MANUFACTURE OR PERF PERFORATED
<br /> APPROVED.CONFORM TO ANSI A13.1,"SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS'.LOCATE MARKERS ADJACENT TO EACH PLBG PLUMBING
<br /> VALVE,AT MINIMUM 30 CENTERS WITH AT LEAST ONE MARKER BETWEEN ANY TWO PARTITIONS.PROVIDE DIRECTION OF FLOW ARROWS POC POINT OF CONNECTION
<br /> AT MARKERS.LABEL EQUIPMENT WITH 3"ENGRAVED PHENOLIC LABELS,TAKE EQUIPMENT NAMES FROM THE EQUIPMENT SCHEDULE. PREV PREVIOUS
<br /> PRV PRESSURE REDUCING VALVE
<br /> PSIA POUNDS PER SQUARE INCH(ABSOLUTE)
<br /> PSIG POUNDS PER SQUARE INCH(GAUGE)
<br /> PT/PIT PRESSURE AND TEMPERATURE
<br /> QD QUICK DISCONNECT
<br /> R,(R) RELOCATE
<br /> RD ROOF DRAIN
<br /> RIO ROUGH IN ONLY
<br /> RL RAIN LEADER
<br /> RPBA RED.PRES.BACKFLOW ASSEMBLY
<br /> SCD STEAM CONDENSATE
<br /> SCCR SHORT CIRCUIT CURRENT RATING roi•n.�•,"a.ao...
<br /> SF SQUARE FEET ZAP ENERGY VENTILATION
<br /> SSISSTL STAINLESS STEEL
<br /> STBY STANDBY
<br /> APPROVED STD STANDARD 2300 MERRILL CREEK
<br /> Office of Community,Planning&Economic Development STL STEEL PARKWAY
<br /> PLANNING DEPARTMENT SUSP SUSPENDED EVERETT,WA 98203
<br /> NAME: DGray TBV THERMAL BALANCING VALVE
<br /> DATE: 05/09/202a TDH TOTAL DYNAMIC HEAD
<br /> TI TENANT IMPROVEMENT
<br /> TOD TOP OF DUCT
<br /> TOP TOP OF PIPE
<br /> ` City of Everett Permit Review THIS SET OF TOS TOP OF STEEL n n O.00
<br /> TP TRAP PRIMER I V I
<br /> TYP TYPICAL
<br /> EVERETT Status: Reviewed for Permit DRAWINGS SHALL BE uR URINAL n""mom
<br /> w..x.�.o. ON JOB SITE AT ALL VFD VARIABLE FREQUENCY DRIVE .m
<br /> 05/13/2024 3:43:00 PM TIMES VSD VARIABLE SPEED DRIVE MECH COVERSHEET
<br /> VTR VENT THRU ROOF
<br /> W/ WITH
<br /> IN WRAP
<br /> AKH/JS GAH cMW
<br /> WC WATER CLOSET
<br /> WCO WALL CLEANOUT
<br /> WH WALL HYDRANT o2024/04/24
<br /> WSFU WATER SOURCE FIXTURE UNIT
<br /> ZCV ZONE CONTROL VALVE SNOSCALE
<br />
|