2021 WASHINGTON STATE ENERGY CODE NOTES 2021 GENERAL NOTES DUCTWORK LEGEND ABBREVIATIONS LEGAL INFORMATION
<br /> 1. THE COMPLIANCE PATH IS PRESCRIPTIVE. 1. COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE LATEST ADOPTED VERSION OF THE INTERNATIONAL BUILDING SYMBOL DESCRIPTION AAV AUTOMATIC AIR VENT ADDRESS:2300 MERRILL CREEK PONY,EVERETT,WA 98203
<br /> 2. WSEC C103.6:CLOSEOUT DOCUMENTS SHALL BE PROVIDED TO THE OWNER. CODE(IBC),INTERNATIONAL MECHANICAL CODE(IMC),WASHINGTON STATE ENERGY CODE(WSEC),UNIFORM PLUMBING CODE(UPC), ABV ABOVE
<br /> 3. WSEC C403.7.8.3:DAMPERS INSTALLED TO COMPLY WITH REQUIREMENTS,AND SHALL HAVE A MAXIMUM LEAKAGE RATE WHEN TESTED IN ACCORDANCE WITH AMCA INTERNATIONAL FIRE CODE(IFC),NFPA,AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL JURISDICTIONS AND AD ACCESS DOORI AREA DRAIN PARCELM 28040200300200
<br /> STANDARD 500D OF: WASHINGTON STATE. ® SUPPLY DIFFUSER/GRILLE AFF ABOVE FINISHED FLOOR AfilMechanicai
<br /> A. MOTORIZED DAMPERS:CLASS 1,4 CFWSQ.FT.OF DAMPER AREA AT 1.0INCH W.G. AG ABOVE GRADE ZONING:N/A
<br /> B. NON-MOTORIZED DAMPERS:20 CFM!SO.FT.OF DAMPER AREA AT 1.01NCH W.G.,EXCEPT THAT FOR NON-MOTORIZED DAMPERS SMALLER THAN 24INCHES IN 2, MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN NATURE,AND DO NOT NECESSARILY REFLECT EVERY REQUIRED OFFSET,FITTING,OR AL ALUMINUM
<br /> EITHER DIMENSION:40 CFM!$0.FT.OF DAMPER AREA AT 1.0 INCH W.G. ACCESSORY.THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE DOCUMENTS THAT ARE NOT DEFINITELY RETURN GRILLE ATM ATMOSPHERE LEGAL DESCRIPTION:
<br /> 4. WSEC G403.10.2:ALL DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTION OF GALVANIZED DUCTWORK.ALL DUCTWORK SHALL BE SEALED. FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS AV ACID VENT SEC 02 TWP 28 RGE 04LOT 5A OF SEAWAY CENTER FOUR BSP REC VOL I OF BSP'S P.O.Box 249
<br /> DUCT TAPE NOT ALLOWED. MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS.DO NOT SCALE DRAWINGS. AN ACID WASTE PG 246-247 AF NO 9203025002 BEING PTN OF SW114 2623 West Valley Hwy.Auburn,
<br /> 5. WSEC C405.8:ELECTRIC MOTOR SHALL MEET THE MINIMUM EFFICIENCY REQUIREMENTS OF TABLE C405.8(1)THROUGH C405.8(4).FRACTIONAL H ®P FAN MOTORS EXHAUST GRILLE WA 98071
<br /> GREATER THAN 1I12HP AND LESS THAN 1 HP SHALL BE ELECTRONICALLY COMMUTATED MOTORS. 3. ITEMS MARKED AS TYPICAL APPLY TO THAT DRAWING SHEET ONLY.UNLESS NOTED OTHERWISE,DETAILS MARKED AS TYPICAL APPLY TO BAS BUILDING AUTOMATION SYSTEM Tel:(253)838-9780
<br /> 6. WSEC C40B.1:BUILDINGS SHALL BE COMMISSIONED FOR ALL MECHANICAL AND PLUMBING SYSTEMS.TOTAL MECHANICAL SYSTEMS WITH COOLING CAPACITY LESS THE DRAWING SET. ® SLOT&LINEAR DIFFUSER/GRILLE BFP BACKFLOW PREVENTER Fax:(253)833-1384
<br /> THAN 180,000 BTUM AND HEATING CAPACITY LESS THAN 240,000 BTU/H ARE EXEMPT FROM THE COMMISSIONING PROCESS PER SEC C408.1 EXCEPTION 1.THE BFV BUTTERFLY VALVE AU-BU-RM1163BA
<br /> LARGEST SERVICE WATER HEATING SYSTEM WITH CAPACITY LESS THAN 200,000 BTU/H WHERE THERE ARE NO POOLS OR PERMANENT SPAS ARE EXEMPT FROM 4. COORDINATE INSTALLATION OF MECHANICAL SYSTEMS WITH BUILDING STRUCTURE AND ALL OTHER TRADES.THE CONTRACTOR SHALL �® Q� ROUND AND SQUARE DUCT(UP&DOWN) BG BELOW GRADE
<br /> THE COMMISSIONING PROCESS PER SEC C408.1 EXCEPTION 2.WHEN REQUIRED,COMMISSIONING SHALL BE PERFORMED PER WSEC C408 AND SHALL INCLUDE: COORDINATE THE EXACT LOCATION OF DUCTWORK WITHIN THE STRUCTURE AT THE SITE. BGS BUG SCREEN
<br /> A. COMMISSYSTEMS
<br /> ONING ESTINGAN BHP BRAKE DINGMANAGEME VICINITY MAP
<br /> B. SYSTEMS TESTING AND BALANCING 5. ALL EQUIPMENT SHALL BE FREE FROM DEFECTS IN MATERIAL,WORKMANSHIP,AND SHALL BE OF THE KIND AND QUALITY DESCRIBED 14x12 12"m 14x1 m BARE SHEETMETAL BMS BUILDING MANAGEMENT SYSTEM
<br /> C. HVAC EQUIPMENT AND CONTROLS FUNCTIONAL TESTING HEREIN.ALL EQUIPMENT SHALL BE APPROVED FOR INSTALLATION IN THE STATE OF WASHINGTON AND SHALL HAVE ALL CERTIFICATIONS (RECTANGULAR,ROUND,&OVAL) BOB BOTTOM OF BEAM
<br /> D. SUPPORTING DOCUMENTATION IN THE FORM OF OPERATION AND MAINTENANCE AND RECORD DOCUMENTS AND RATINGS REQUIRED TO MEET ALL ENERGY,POLLUTION,ENVIRONMENTAL,SEISMIC,LOCAL,STATE,ETC.CODES AND REGULATIONS. __ BOD BOTTOM OF DUCT
<br /> SOUNDLINE SHEETMETAL WITH 1"LINING
<br /> E. COMMISSIONING REPORT 14x14$L BOP BOTTOM OF PIPE
<br /> - -- UNO
<br /> 7. WSEC C408.2.2:PROVIDE BALANCING DEVICES FOR SUPPLY AIR OUTLETS ZONE TERMINAL DEVICES AND HYDRONIC COILS AND AS INDICATED ON THE CONTRACT 6. VERIFY SITE VOLTAGES PHASES AND ELECTRICAL LOADS PRIORTO ORDERING ANY EQUIPMENT. BTU BRITISH THERMAL UNITS
<br /> DOCUMENTS.BALANCING DEVICES SHALL INCLUDE,BUT ARE NOT LIMITED T0,DAMPERS,TEMPERATURE AND PRESSURE TEST CONNECTIONS,AND BALANCING G$„m BTU/HR BRITISH THERMAL UNITS PER HOUR (5251
<br /> VALVES.CONTACT THE ENGINEER FOR CLARIFICATION AND ANY VARIANCES.AIR AND WATER FLOW RATES SHALL BE MEASUREDAND ADJUSTED TO DELIVER FINAL 7. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE. ///I I I I I I FLEX DUCT BV BALL VALVE
<br /> FLOW RATES WITHIN TOLERANCES. CB CATCH BASIN L C ht"�?L15 e 8. PROVIDE MECHANICAL EQUIPMENT CLEARANCES,36'FOR MECHANICAL ACCESS OR ELECTRICAL ACCESS ON UNITS OF LESS THAN 460V, 8^m Bz8 SQUARE-TO-ROUND TRANSITION -
<br /> 42"FOR ELECTRICAL ACCESS OF UNITS 460V,OR OTHER CLEARANCES PER THE MANUFACTURERS RECOMMENDATIONS. ter- CC CONTROLS CONTRACTOR Pa,k
<br /> CFH CUBIC FEET PER HOUR
<br /> 9. LOCATIONS AND SIZES OF ALL FLOOR,WALL,AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED. 6z�.,8�a TRANSITIONI REDUCER CFM CUBIC FEET PER MINUTE 19
<br /> CI CASTIRON
<br /> 10. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCESDUCT CONTINUES IN ACCORDANCE WITH MANUFACTURERS'RECOMMENDATIONS,CONTRACT CIRC CIRCULATION
<br /> •
<br /> DOCUMENTS,AND APPLICABLE CODES AND REGULATIONS. CNTR CONTRACTOR MukllteQ
<br /> CO CLEAN OUT
<br /> 11. ALL MECHANICAL EQUIPMENT THAT REQUIRES ACCESS FOR SERVICE AND MAINTENANCE(ELECTRIC COIL PULL,FILTER CHANGE,MOTOR DUCTCAP CV CHECKVALVE
<br /> CHANGE,COMPRESSOR CHANGE,LUBRICATION,SHEAVE AND BELT CHANGE,FAN CHANGE OUT,ETC).THIS SHALL BE INDICATED WITH A `
<br /> PERMANENT SIGN MOUNTED IN THE EQUIPMENT ACCESS PANELS INDICATING THE CLEARANCE AND STATING:"THIS EQUIPMENT MUST D,(D) DEMO
<br /> HAVE A MINIMUM ACCESS OF(REQUIRED CLEARANCE)'.NO TRADE SHALL BLOCK THIS SPACE.- �C FIRE DAMPER DCBP DOUBLE CHECK BACKFLOW PREV.
<br /> DCVA DOUBLE CHECK VALVE ASSEMBLY
<br /> 12. CONTRACTOR SHALL COORDINATE DIFFUSER,GRILLE AND REGISTER LOCATIONS AND DUCT ROUTING CLEARANCES WITH THE FIRE/SMOKE DAMPER DOC DIRECT DIGITAL CONTROL T
<br /> STRUCTURAL,REFLECTED CEILING,AND LIGHTING PLANS. DFU DRAINAGE FIXTURE UNIT
<br /> ON DOWN
<br /> 13. ALL EQUIPMENT,DAMPERS,PIPING,AND ACCESSORIES IN CONCEALED SPACES REQUIRING ACCESS SHALL HAVE ACCESS DOORS.ALL =rC BALANCING DAMPER
<br /> ACCESS DOORS PROVIDED BY G.C.IN FIRE RATED STRUCTURE SHALL BE FIRE RATED.COORDINATE LOCATIONS WITH ARCHITECT. E,(E) EXISTING �DENIg FUh1re Of FIIgh1 (5
<br /> CONTRACTOR TO PROVIDE ACCESS DOORS. EL EC ELECTRICAL
<br /> MOTORIZED DAMPER ELEV ELEVATION
<br /> 14, ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED UNLESS OTHERWISE NOTED. EWT ENTERING WATER TEMPERATURE
<br /> SUPPLY AIR EXH EXHAUST o c
<br /> 15, SERVICE RECEPTACLES SHALL HAVE GFCI PROTECTION LOCATED WITHIN 25 FT.OF EQUIPMENT. EXP EXPANSION
<br /> RETURN/EXHAUSTAIR F,(F) FUTURE
<br /> PC FLEXIBLE CONNECTION Paine Field CQStco
<br /> FCO FLOOR CLEAN
<br /> 2021 HVAC NOTES (DTI QT THERMOSTAT(ROOM/DUCT) FCU FAN COIL UNTO
<br /> FD FLOOR DRAIN
<br /> 1. MATERIALS,METHODS,AND INSTALLATION SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES BASED ON NATIONAL,STATE, FPM FEET PER MINUTE
<br /> AND MUNICIPAL LAWS,CODES,AND ORDINANCES.THIS PROJECT IS DESIGNED SPECIFICALLY BASED ON THE 2021 WASHINGTON P SPACE PRESSURE SENSOR(TO BMS) FPS FEET PER SECOND SITE MAP
<br /> MECHANICAL CODE(WSMC),THE 2021 WASHINGTON BUILDING CODE(WSBC)AND THE 2021 WASHINGTON ENERGY CODE(WSEC). FS FLOOR SINK
<br /> SIZE TYPE GRILLEI REGISTER!DIFFUSER TAG FTr FEET
<br /> 2. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH THE 2021 IMC(SECTION 603,ETC)AND WITH CURRENT SMACNA STANDARDS. CFM FTD FOOTING DRAINAGE
<br /> PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH THE 2021 IBC(SECTION 1613,ETC),ASCE 7,AND THE FU FIXTURE UNIT
<br /> SMACNA SEISMIC RESTRAINT MANUAL. 'a• -- - - -
<br /> GALV GALVANIZED
<br /> 3. DUCT SIZES SHOWN ON PLAN ARE THE INTERIOR(CLEAR/FREE AREA)DIMENSIONS,UNLESS OTHERWISE NOTED;INCREASE METAL DUCT GENERAL LEGEND GAL GALLONS SST(K Nq
<br /> SIZE TO ACCOUNT FOR DUCT LINER.ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED.OFFSETS IN DUCTS, GC GENERAL CONTRACTOR
<br /> INCLUDING DIVIDED DUCT$AND TRANSITIONS AROUND OBSTRUCTIONS.MAINTAIN A DUCTWORK ASPECT RATION OF 2.5 TO 1,OR LESS. GI GREASE INTERCEPTOR
<br /> SYMBOL DESCRIPTION GPH GALLONS PER HOUR
<br /> 4. ALL SUPPLY AND RETURN DUCTS,AIR HANDLERS,AND PLENUMS INSIDE AND OUTSIDE THE HEATED SPACE SHALL BE SEALED ATALL GPM GALLONS PER MINUTE
<br /> JOINTS AND CORNERS INCLUDING PREFABRICATED JOINTS AND LONGITUDINAL SEAMS.ALL JOINTS IN THE HVAC DUCTS SHALL BE EQ-01A1 EQUIPMENT TAG GWB GYPSUM WALL BOARD - + - y, • %��
<br /> MECHANICALLY FASTENED. -
<br /> yA(VI, 3' I �F•S?PCISTER6 �'
<br /> 2"FX-1 FIXTURE TAG HB HOSE BIBB
<br /> 5. MAXIMUM FLEX DUCT LENGTH IS 8'-0".HANGERS SHALL NOT CRIMP THE DUCTWORK OR REDUCE THE INTERIOR DIMENSION.MAXIMUM SAG HP HEAT PUMP,OR HORSEPOWER
<br /> FOR SUSPENDED DUCTWORK 131/2'FOR EVERY FOOT OF RUN.FLEXIBLE DUCTWORK SHALL BE ALLOWED TO RUN 12"STRAIGHT FROM <1 FLAG NOTE HX HEAT EXCHANGER
<br /> ANY CONNECTION BEFORE TAKING A TURN.THE RADIUS AT THE CENTERLINE OF A BEND MUST BE A MINIMUM OF ONE DUCT DIAMETER. I e „, »..wr.04/2412021,
<br /> CONNECTIONS TO BOOTS,COLLARS,TRUNKS,AND EQUIPMENT MUST BE MECHANICALLY FASTENED AND SUBSTANTIALLY AIRTIGHT. POINT OF CONNECTION ID INSIDE DIMENSION l _ 5
<br /> SEALANTS AND TAPES USED TO MAKE DUCTWORK AIRTIGHT MUST BE COMPLIANT WITH UL-181 STANDARDS AND INSTALLED ACCORDING IE INVERT ELEVATION
<br /> TO MANUFACTURERS'SPECIFICATIONS.
<br /> 1 6. EQUIPMENT SHALL BE LABELED WITH TAG NAMES PER THE PLANS. M1.00 DETAIL SYMBOL IW INCHES INS INSULATION ,.3`
<br /> IRR IRRIGATION i I -K F
<br /> 7. COORDINATE AND PROVIDE ALL DUCT TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT.FIELD r8 I
<br /> VERIFY AND COORDINATE ALL DUCT DIMENSIONS BEFORE FABRICATION.THE CONTRACTOR SHALL VERIFY EQUIPMENT CONNECTION 1 LBS/# POUNDS
<br /> ORIENTATION BEFORE DUCTING TO EQUIPMENT. SECTION SYMBOL LWT LEAVING WATER TEMPERATURE
<br /> M1.00
<br /> 8. ALL CUTTING,PATCHING,FRAMING,FIRE BARING,PAINTING,ROOF OPENING,CURBS,ROOFING,ETC.REQUIRED TO INSTALL MECHANICAL MBH 1,000 BTUIH
<br /> SYSTEMS SHALL BE BY THE GENERAL CONTRACTOR INCLUDING ALL FLASHING FRAMING AND ROOFING OF SHEETMETAL DUCT MECH MECHANICAL
<br /> ENCLOSURES. ZONE1-1-01 ZONE TAG MH MANHOLE SCOPE OF WORK
<br /> 800 FT2
<br /> 9. VERIFY THERMOSTAT LOCATIONS WITH THE ARCHITECT.IF NOT SHOWN ON ARCHITECTURAL PLANS,LOCATE ALL ROOM THERMOSTATS N,(N) NEW
<br /> 4'-0"(CENTERLINE)ABOVE FINISHED FLOOR(UNLESS OTHERWISE NOTED).NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE NC NORMALLY CLOSED 1.PROVIDE ONE EXHAUST FAN FOR METROLOGY ROOM AND ASSOCIATE DUCTWORK.
<br /> LOCATION CANNOT BE MAINTAINED,OR WHERE THERE IS A QUESTION ON LOCATION.PROVIDE SECURITY COVERS FOR ALL THERMOSTATS NIC NOT IN CONTRACT
<br /> AND SENSORS. NO NORMALLY OPEN
<br /> 10. OPERATION AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE:SUBMITTAL DATA,NAMES AND OC ON CENTER
<br /> ADDRESSES OF AT LEAST ONE SERVICE AGENCY,HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A OD OUTSIDE DIMENSION MECH SHEETS INDEX 0 PERMIT 04/24/2024
<br /> COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. OFCI OWNER FURNISHED CNTR INSTALL.
<br /> OFD OVERFLOW DRAIN SHEET DESCRIPTION No. Revision/Issue Date
<br /> 11. COORDINATE ALL EQUIPMENT AND SYSTEM OUTAGES WITH OWNER. OFSD OVERFLOW STORM DRAIN Mo. MECH COVERSHEET
<br /> OPNG OPENING M2.01 METROLOGY ROOM-HVAC KEY PLAN
<br /> 12. EQUIPMENT AND PIPE IDENTIFICATION:ALL PIPING IN SERVICEABLE LOCATIONS(INCLUDING ABOVE LAY-IN CEILINGS)SHALL BE
<br /> IDENTIFIED WITH SEMI-RIGID PLASTIC OR ADHESIVE IDENTIFICATION MARKERS.MARKERS SHALL BE BRADY MANUFACTURE OR PERF PERFORATED
<br /> APPROVED.CONFORM TO ANSI A13.1,"SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS'.LOCATE MARKERS ADJACENT TO EACH PLBG PLUMBING
<br /> VALVE,AT MINIMUM 30 CENTERS WITH AT LEAST ONE MARKER BETWEEN ANY TWO PARTITIONS.PROVIDE DIRECTION OF FLOW ARROWS POC POINT OF CONNECTION
<br /> AT MARKERS.LABEL EQUIPMENT WITH 3"ENGRAVED PHENOLIC LABELS,TAKE EQUIPMENT NAMES FROM THE EQUIPMENT SCHEDULE. PREV PREVIOUS
<br /> PRV PRESSURE REDUCING VALVE
<br /> PSIA POUNDS PER SQUARE INCH(ABSOLUTE)
<br /> PSIG POUNDS PER SQUARE INCH(GAUGE)
<br /> PT/PIT PRESSURE AND TEMPERATURE
<br /> QD QUICK DISCONNECT
<br /> R,(R) RELOCATE
<br /> RD ROOF DRAIN
<br /> RIO ROUGH IN ONLY
<br /> RL RAIN LEADER
<br /> RPBA RED.PRES.BACKFLOW ASSEMBLY
<br /> SCD STEAM CONDENSATE
<br /> SCCR SHORT CIRCUIT CURRENT RATING roi•na,m•,^a.oa
<br /> SF SQUARE FEET ZAP ENERGY VENTILATION
<br /> SSISSTL STAINLESS STEEL
<br /> STBY STANDBY
<br /> STD STANDARD 2300 MERRILL CREEK
<br /> STL STEEL PARKWAY
<br /> SUSP SUSPENDED
<br /> EVERETT,WA 98203
<br /> TBV THERMAL BALANCING VALVE
<br /> TDH TOTAL DYNAMIC HEAD
<br /> TI TENANT IMPROVEMENT
<br /> TOD TOP OF DUCT
<br /> TOP TOP OF PIPE
<br /> TOS TOP OF STEEL n �O.O O
<br /> TP TRAP PRIMER I V I
<br /> TYP TYPICAL
<br /> UR URINAL ea>mm�m
<br /> VFD VARIABLE FREQUENCY DRIVE
<br /> VSD VARIABLE SPEED DRIVE MECH COVERSHEET
<br /> VTR VENT THRU ROOF
<br /> W/ WITH
<br /> /W WRAP E
<br /> aAKH/JS GA GAH MW
<br /> WC WATER CLOSET
<br /> WCO WALL CLEANOUT a WH WALL HYDRANT 2024/04/24
<br /> WSFU WATER SOURCE FIXTURE UNIT
<br /> ZCV ZONE CONTROL VALVE NO SCALE
<br />
|