Laserfiche WebLink
MECHANICAL NOTES ABBREVIATIONS HVAC <br /> P DIAMETER FGCO FINISH GRADE CLEANOUT MEZZ MEZZANINE 128 <br /> DUCT ® THERMOSTAT <br /> G.n 11 FEET FLA FULL LOAD AMPS MIN MINIMUM OR <br /> 1.A FIRST NUMBER 15 SIDE SHOWN _ <br /> CONTROLS WIRING <br /> INCHES FLK FLOOR MOP MAX.OVERCURRENT — <br /> 1.All work to conform to all locally adopted coded including the International Building Code,International Mechanical FS FLOOR SINK PROTECTION 12x8 (DUCT SIZES ARE INCHES) <br /> code,Uniform Plumbing Code,all City,County and State Codes including locally adopted amendment.to the (IN CONDUIT) <br /> APPROX APPROXIMATELY FT5 FLOOR TEMPERATURE SENSOR <br /> National Code&and the Washington State Energy Code. FWCO FIN15H WALL CLEANOUT (N) NEW ® SUPPLY DUCT UP <br /> 2.The Contractor shall visitthe site prior to submitting a bid and note all conditions affecting his work.No extra. BDD BACK DRAFT DAMPER OBD OPPOSED BLADE DAMPER OK LARGE TO SMALL TRANSITION <br /> will be allowed for coordination or relocation of exieting conditiono not shown on the drawings. Bide shall serve as BTU/H 3KITISH THERMAL UNITS/HOUR GPH GALLONS PER HOUR OC ON CENTER <br /> evidence of knowledge of existing conditions. GPM GALLONS PER MINUTE OD OUTSIDE DIAMETER SUPPLY DUCT DOWN <br /> 3.5ecure and payfor all required permitA,fees and inspection cortificatm. CAP CAPACITY H HEIGHT 05A OUTSIDE AIR ROUND TO RECTANGULAR <br /> 4.Furnish all labor,material.,equipment and toole to perform mechanical work shown,noted or scheduled for a CFM CU61C FEET PER MINUTE HP HORSEPOWER RETURN DUCT UP <br /> P TRANSITION <br /> complete and finished installation. CIRC CIRCULATION HTG HEATING P&T PRESSURE&TEMPERATURE <br /> COMB COM6U5TION HW HOT WATER POC POINT OF CONNECTION RETURN DUCT DOWN <br /> a.All materiale and equipment shall be commercial grade and shall carry a U.L.label, �F/5 FIRE-SMOKE DAMPER <br /> b.Materials,products and equipment,including all components thereof,shall be new and such me appear on the CONT CONTINUATION HWC HOT WATER RECIRCULATION PPE55 PRESSURE <br /> Undenvritera Laboratories Liet of Approved Item.and shall meet requirements of A5TM,IEEE,IPCEA,NEC, CLG COOLING HWG HIGH WALL GRILLE PSI POUNDS PER 5QUARE INCH <br /> CO CLEANOUT HWR HEATING WATER RETURN <br /> NEMA,RLM,CEM and other recognized standards and shall be sized in conformity with requirements of the CW COLD WATER HW5 HEATING WATER SUPPLY RAP RADIANT OR SQUARE EL50W <br /> International whichever <br /> rMechanical Code,International Plumbing Code,Uniform Plumbing Code and other applicable wdee, HT HOT or HEAT or HEATING KEDIKC RECIRCULATION OR whichever are more etringerrt. BRANCH CONNECTION FITTING <br /> D DEPTH HYDR HYDRONIG RED REDUCED or REDUCER <br /> 5.It is the intent that this work shall be complete in every respect and that any material or work not.pecifically DCW DOMESTIC COLD WATER REF'G REFRIGERATOR <br /> mentioned or shown on the drawings,but necoeearyto fully complete the work shall befurnieheAbythis DEG DEGREE ID INSIDE DIAMETER RIB RELAY IN BOX <br /> contractor without extra charge. DHW DOMESTIC HOT WATER IMC 20121NT.MECH.CODE SAN SANITARY SQUARE ELBOW CONICAL 45 DEG <br /> 6.Use&ufficientjourneymen,workmen and competent supervisors In the execution of this work to ensure proper DP.N DRAIN INT INTERNATIONAL 5CH SCHEDULE TURNING VANES <br /> and adequate installation manpower tomeetthe construction schedule. DTL DETAIL 5CHED SCHEDULE <br /> '/.The word"provide'ae used herein mean&to furnish and install complete. DWG DRAWING L LENGTH SP STATIC PKE55UKE OF, <br /> 8.Submit material liste,product data and shop drawinge for major equipment to the Engineer for approval. OX DIRECT EXPANSION LIQ LIQUID 13YPA56 DAMPER FLEXIBLE CONNECTION <br /> 5ubmittale shall include all data,information and dimensioned drawings required by the Engineer to determine the LWG LOW WALL GRILLE TEMP TEMPERATURE <br /> correct product is being provided for the project.Data sheets that include products not part of the project shall (E) EXISTING TYP TYPICAL —————— <br /> ESP EXTERNAL STATIC PKE55UPE MAT MIXED AIR TEMP.SENSOR VEL VELOCITY OR SOUND LINING DIFFUSER TYPE <br /> have required products highlighted to make It obvious of the product being provided.5ubetitutiona shall be clearly EXCH EXCHANGER MAX MAXIMUM VTK VENT THROUGH ROOF CFM SEE SCHEDULE <br /> lieted on a cover letter stating the reason for the substitution(product no longer made,product has a longer EXH EXHAUST M13H 1,000 BTU/H'e A THROAT SIZE <br /> chip time than the duration of the project from project start date to project completion date,no other FD FLOCK DRAIN MCA MINIMUM CIRCUIT AMPACITY W WIDTH � <br /> eubetitutione are acceptable).Provide electronic submittals in.pdf format.All submittal shall be stamped by the F.D. FIRE DAMPER MC13 MAXIMUM CIRCUIT BREAKER W/ WITH of T VOLUME DAMPEK T RETURN INLET CEILING DIFFUSER <br /> Contractor ehowinel he has reviewed and approved them.Allow for two weeks for Enginearin'l eubmittal review. FFCO FINISH FLOOR CLEANOUT MECH MECHANICAL WC WATER COLUMN 4®� ARROWS INDICATE THROW DIRECTIONS <br /> 9.Cutting,Patching,and Demolition: WCO WALL CLEANOUT <br /> 1 <br /> a.Do all cutting,patching and demolition required to install materials and systems specified and shown on the NOT ALL A513PEVIATIONS USED <br /> drawing.. OK EXHAUST INLET CEILING DIFFUSER <br /> b.Cutting shall be done in a neatand workman like manner limiting.cope to only that which is necessary to RADIUS ELBOW ARROWS INDICATE THROW DIRECTIONS <br /> accomplish the new work.Remove all out material from site.Patch to match exiating. 1 <br /> c.Do no cutting or drilling of structural membere or elabe without permission of the Owner. MISCELLANEOUS <br /> d.Take precautions to protect building,contents and occupants and repair or replace all damage to building and SUPPLY OUTLET CEILING DIFFU5EK <br /> Its contents to like-new condition. aa ARROWS INDICATE THROW DIRECTIONS <br /> e.51ecveo shall extend at[met 2"above finished floor. DIRECTION OF FLOW T <br /> f.All sleeves,openings,etc,through fire rated walls and floors shall be sealed to retain their fire rating. <br /> R REFRIGERANT PIPING En ineerin Services Inc. <br /> 10.Guarantee: 9 9 <br /> 9680 Moran Road NE Bainbridge Is,WA 98110 <br /> a. Materials,equipment and installation shall be guaranteed for a period of one(1)year from date of acceptance. SLASH MARK INDICATE WORK TO 13E REMOVED Pbwe:206.842.69 Webeite:wrwAU tUg.— <br /> Defects which appear during that period shall be corrected at this Contractor's upenae. o-- ELBOW UP <br /> b.For the came period,Mechanical Contractor shall be responsible for any damage to premises caused by defects <br /> in workmanship or in the work or equipment furnished and/or installed by them. LIGHT LINE ITEMS ARE EXISTING C ELBOW DOWN <br /> 11.The drawings and devices shown are generally diagrammatic.Complete details of the building which affect the Clares Place- <br /> installation are not shown.Contractor to provide complete syeteme as shown on the drawinge.The exact <br /> location of all work is to be verified in the field. Bring conflicte to the Engineers attention for resolution prior to DARK LINE ITEMS AKE NEW Ventilation Revision <br /> rough-in.Relocations required due to conflicts shall be done without additional compensation. <br /> 12.Protection: <br /> a. Use all means necessary to protect materials,before,during and after installation and to protectthe installed 6200 12th Dr.SE <br /> work of other trades. Everett,Washington 98203 <br /> b.Contractor shall be responsible for damages caueed by their work to the work of other trades,and shall make, <br /> or pay for,all necessary repaire to restore damage to new condition at no cost to the owner. DEAN <br /> c.In the event of damage,immediately make all repairs and replacements necessary to the satisfaction of the o,K,'Ss b4 s„N1�2 <br /> Owner and at no additional coot to the Owner, > S, <br /> 13.Provide final ae-builtdramnge and maintenance manuals. <br /> Product. y e gl glees o ?' <br /> 1.5hwt Metal:All ductwork to be cheat metal and comply with 5MACNA Ductwork 5tandarde..3"5.P. <br /> NpL <br /> 2.Duct Insulation:See insulation table for thickneea.Sound lining is not allowed on this project. <br /> 3.HVAC Equipment:Furnish and install HVAC as shown In the schedules located on the plane. 01-19-2024 <br /> 4.Drain pipe for exhaust duct type V'copper. <br /> Fwcut'c <br /> Mechanical <br /> 1-Install all control wire in conduit. <br /> Cover Sheet <br /> 2.Electrical Equipment and Wiring:Provide all control conduit and wire associated with the mechanical equipment. <br /> netall in compliance with the requirements of the electrical work. and Legend <br /> 3.Prior to any work or fabrication,carefully inspect the exieting conditions and verify that all such conditions are <br /> Cj�mpatible to the point where this installation may commence. <br /> eet Metal Conetru ion an in tal ti n o all u k al co wit a 5 C A d e 3" .P 2 <br /> ncing:Balance all intake and exhaust fan.to within t 10%of that shown on the drawinge,re-balancing at the <br /> tments is not required.Commission system as required by W5EC and local wdee.Neudorfer Engineers or Date <br /> Air Qua19 January 2024 <br /> cor rowing.eha be kept on& and up dal y. raulde measurement to a undergnoun an concea ed <br /> work. <br /> 'A Provide all rack.,stands and supports for mechanical equipment and ductwork as required. <br /> Revisions <br /> End of Mechanical 5pecificatione. <br /> 02/O6/24 <br /> 02/23/24 <br /> MECHANICAL SHEET LIST <br /> MO.1 MECHANICAL LEGEND AND NOTES Drawn by: <br /> M1.1 MECHANICAL FIR5T FLOOR PLANS lK <br /> M1.2 MECHANICAL SECOND FLOOR RECORD DRAWINGS Checked by(P.M.): <br /> S M1.3 MECHANICAL THIRD FLOOR RECORD DRAWINGS <br /> M1.4 MECHANICAL FOURTH FLOOR PLANS Checked by(C.C.): <br /> Q M2.1 MECHANICAL DIAGRAMS JH <br /> s M5.1 MECHANICAL SCHEDULES <br /> Protect No. <br /> tl <br /> s M0.1 <br /> x .. <br /> Page 17 of 31 <br />