Laserfiche WebLink
PermiUk. M2402-014 <br /> SI$Addre- 620012TH DR SE <br /> Owner: BERKSHIRE HOUSING LLC <br /> Tenant: EVERETT SAFE STREETS SUPPORfiVE <br /> ABBREVIATIONS HOUSING <br /> App. MECHANICAL <br /> MECHANICAL NOTES HVAC PermitType: MECHANICAL <br /> Subtype: COMMERCIAL MECHANICAL(PLAN REVIEW <br /> 6 DIAMETER FGCO FINISH GRADE CLEANOUT MEZZ MEZZANINE 12xb REQUIRED) <br /> General FEET FLA FULL LOAD AMPS MIN MINIMUM OR DUCT ® THERM05TAT Description: VENTILATION SYSTEM REVISION/UPDATE <br /> INCHES FLR FLOOR MOP MAX.OVERCURREN7 FIRST NUMBER 15 SIDE SHOWN _ Reviewed By: Da e: �� <br /> 1.All work to conform to all locally adopted codes including the International Building Code,International Mechanical 12x8 DUCT SIZES ARE INCHES i' CONTROLS WIRING <br /> F5 FLOOR SINK PROTECTION ( ) (IN CONDUIT) _ ice Set Od Site Set <br /> code,Uniform Plumbing Code,all City,County and State Codes including locally adopted amendments to the APPROX APPROXIMATELY FT5 FLOOR TEMPERATURE SENSOR <br /> National Codes and the Waehington State Energy Code. FWCO FINISH WALL CLEANOUT (N) NEW ® SUPPLY DUCT UP �- <br /> 2.The Contractor ehall vivittha site prior to submitting a bid and normal]conditions affecting hie work.No extras BDD BACK DRAFT DAMPER 050 OPPOSED BLADE DAMPER F-- LARGE TO SMALL TRANSITION <br /> will be allowed for coordination or relocation of axiotire conditions not shown on the drawings.Side shall verve as BTU/H BRITI5H THERMAL UNITS/HOUR GPH GALLONS PER HOUR OC ON CENTER 0 SUPPLY DUCT DOWN <br /> evidence of knowledge of existing conditions. GPM GALLONS PER MINUTE OD OUTSIDE DIAMETER <br /> 3.Occurs and payfor all required permits,fete and inspection certificates. GAP CAPACITY H HEIGHT 05A OUTSIDE AIR RETURN DUCT UP ROUND 70 RECTANGULAR <br /> 4.Furnish all labor,materiale,equipment and tool&to perform mechanical work shown,noted or scheduled fora CFM CUBIC FEET PER MINUTE HP HORSEPOWER TRANSITION <br /> complete and finlehad installation. CIRC CIRCULATION HTG HEATING P&T PRESSURE&TEMPERATURE <br /> a.All materials and equipment shall be commercial grade and shall carry a U.L label. <br /> COMBCOMBU5TION HW HOT WATER POC POINT OF CONNECTION RETURN DUCT DOWN <br /> b, Materials,products and equipment,including all components thereof,shall be new and ouch Am appear on the CONT CONTINUATION HWC HOT WATER RECIRCULATION PRE55 PRESSURE F/5 FIRE-SMOKE DAMPER <br /> CLG COOLING HWG HIGH WALL GRILLE P51 POUNDS PER SQUARE INCH <br /> Underwriters Laboratories List of Approved Items and shall meet requirements of A5TM,IEEE,IPCEA,NEC, CO CLEANOUT HWR HEATING WATER RETURN <br /> NEMA,RLM,CEM and other recognized standards and shall be eized in conformity with requirements of the GW GOLD WATER HWS HEATING WATER SUPPLY FAD RADIANT UK ' 5QUARE ELBOW <br /> International Mechanical Code,International Plumbing Code,Uniform Plumbing Code and other applicable codae, HT HOT or HEAT or HEATING REDIRC RECIRCULATION �OR 7- <br /> whichever arc more stringent. D DEPTH HYDR HYDRONIC RED REDUCED or REDUCER BRANCH CONNECTION FITTING <br /> 5.It is the intent that this work shall be complete in every respect and that any material or work not specifically DCW DOMESTIC COLD WATER REPG REFRIGERATOR <br /> mentioned or shown on the drawirge,but necessary to fully complate,the work ofiall be furnished by this DEG DEGREE ID INSIDE DIAMETER RIB RELAY IN BOX <br /> contractor withoutautra charge. DHW DOMESTIC HOT WATER IMC 20121N7.MECH.CODE SAN SANITARY SQUARE ELBOW CONICAL 45 DEG ^RET� <br /> CFV1- <br /> 6.Use eufficientjourneymen,workmen and competent supervisors in the execution of this w DRN DRAIN INT INTERNATIONAL 5CH SCHEDULE TURNING VANES <br /> to ensure proper _. �`�M�Y <br /> and adequate installation manpower to meet the construction schedule. DTL DETAIL SCHED SCHEDULE REVIEWED FOR P <br /> %.The word"providd'me used herein means to furnish and install complete. DWG DRAWING L LENGTH SP STATIC PRESSURE OR <br /> l <br /> 8.Submit material li product data and chop drawings for major equipment to the Engineer for approval. BYPASS DAMPER FLEXIBLE CONNECTION <br /> LWG LOW WALL GRILLE TEMP TEMPERATURE <br /> Submittals shall include <br /> determine <br /> de all data,information and dimensioned drawings required by the Engineer to deterr DX DIRECT EXPAN51ON LIQ LIQUID mine the (E) EXISTING TYP TYPICAL <br /> correct product!e being provided for the project.Data shears that include products not part of the project shall ESP EXTERNAL STATIC PRE55URE MAT MIXED AIR TEMP.SENSOR VEL VELOCITY OR SOUND LINING DIFFUSER TYPE <br /> have required products highlighted to make it obvious of the product being provided.Sub s stitution shall be clearly EXCH EXCHANGER MAX MAXIMUM VTR VENT THROUGH ROOF CFM <br /> SEE SCHEDULE <br /> listed on a cover letter staring the reason for the substitution(product no longer made,product has A longer EXH EXHAUST MBH 1,000 BTU/H'r A THROAT SIZE <br /> ship time than the duration of the project from project start date to project completion date,no other FP FLOOR DRAIN MCA MINIMUM CIRCUITAMPACITY W WIDTH <br /> substitutions are acceptable). Provide electronidsubmittals in.peifformat.All submittal shall be etampacl by the F.D. FIRE DAMPER MC13 MAXIMUM CIRCUIT BREAKER W/ WITH VOLUME DAMPER ? RETURN INLET CEILING DIFFUSER <br /> Contractor showing he has reviewed and approved them.Allow for two"eke for Engineering oubmittal review. FFCO FINISH FLOOR CLEANOUT MECH MECHANICAL WC WATER COLUMN ®� AP.ROWS INDICATE THROW DIRECTIONS <br /> 9.Cutting,Patching,and Demolition: WCO WALL CLEANOUT y <br /> a. Do all cutting,patching and demolition required to Install materials and systems specified and shown on the NOT ALL ABBREVIATIONS USED <br /> drawinge. OR 1 EXHAUST INLET CEILING DIFFUSER <br /> ��. <br /> b.Cutting*hall be done in a neat and workman like manner limiting scope to only that which is necceoaryta RADIUS ELBOW ? ARROWS INDICATE THROW DIRECTIONS <br /> accomplish the new work.Remove all cut material from Bite.Patch to match existing. <br /> c. Do no cutting or drilling of structural members or slabs without perm lesion of the Owner. MISCELLANEOUS <br /> d.Take precautions to protect building,contents and occupants and repair or replace all damage to building and ��.,� SUPPLY OUTLET CEILING DIFFUSER <br /> its contents to Iikc-new condition. DIRECTION OF FLOW ARROWS INDICATE THROW DIRECTIONS <br /> e.Sleeves shall extend at[met 2"above fin lehad floor. IA TKITF <br /> f.All cleaves,openings,etc.,through fire rated wells and floors ohall be coaled to retain their fire rating. R REFRIGERANT PIPING Engineering Services Inc. <br /> 10.Guarantee: <br /> a. Materiels,equipment and installation shall be guarentaed for a period of one(1)year from date of acceptance. SLASH MARK INDICATE WORK TO BE REMOVED Pn9s60 M.r.n Rom ME eomb,my.I,,con 9e110 <br /> Defects which appear during that period shall be corrected at this Contractor's expense. 0- ELBOW UP <br /> b. For the came period,Mechanical Contractor shall be responsible for any damage to prem!see deuced by defects <br /> In workmanship or in the work or equipment furnished and/or installed by them. LIGHT LINE ITEMS ARE EXISTING C ELBOW DOWN <br /> 11.The drawings and devisee shown are generally diagrammatic.Complete detail.of the building which affect the C lares Place- <br /> Installation are not shown.Contractor to provide complete systems me shown on the drawings.The exact DARK LINE ITEMS ARE NEW Ventilation Revision <br /> location of all work is to be verified in the field.Bring conflicts to the Engineers attention for revolution prior to <br /> rough-in.Relocations required due to conflicts shall be done without additional compensation. <br /> 12.Protection: <br /> 6200 12th Dr.SE <br /> a.Use all means naccoeary to protect materials,before,during and after installation and to protect the installed Everett,Washington 98203 <br /> work of other trades. <br /> b.Contractor ehall be reoponeible for damages caused by their work to the work of other trades,and shall make, <br /> or pay for,all necessary repairs to restore damage to new condition at no coot to the owner. DEAN <br /> c.In the event of damage,immediately make all repairs and replacern-te necessary to the eatiefaction of the O� o*`r•w.r,�G� <br /> Owner and at no additional coot to the Owner. <br /> 13.Provide final me-built drawings and malntenance manuals. <br /> Products °cr atctea_�` <br /> 1.Sheet Metal:All ductwork to be sheet metal and comply with SMACNA Ductwork Standards.3 3"5.P. <br /> dNAL S" <br /> 2.Duct Insulation:Sam inoulation table for thickness.Sound lining is not allowed on this project. 01-19-2024 <br /> 3.HVAC Equipment:Furnish and install HVAC me shown in the schedules located on the plane. <br /> 4.Drain pipe for exhaust duct type"L"copper. <br /> Mechanical <br /> Fx-t.'n <br /> 1•Install all control wire in conduct. Cover Sheet <br /> 2.Electrical Equipment and Wiring:Provide all control conduit and wire associated with the mechanical equipment, and Legend <br /> Install in compliance with the requirements of the electrical work. <br /> 3.Prior to any work or fabricstlon,carefully inspect the existing conditions and verify that all ouch conditions arc <br /> compatible to the point where this installation may commence, <br /> 4.Sheet Metal Construction and installation of all ductwork shall comply with all SMACNA 5tandarde <br /> 5.Balancing:Balance all air outlets to within t 10%ofthat shown on the drawings.Commission eyetem me required Date <br /> by W5EC and local codes.Neudorfer Engineers shall provide test,balance and commieeloning. 19 January 2024 <br /> 5.Record drawings shall be kept on site and updated dally.Provide madourament to all underground and concealed <br /> work. <br /> %.Provide all racks,etande and support*for mechanical equipment and ductwork me required. <br /> End of Mechanical 5pecificatione. <br /> Revisions <br /> MECHANICAL SHEET LIST <br /> MO.1 MECHANICAL LEGEND AND NOTES Drawn by: <br /> M1.1 MECHANICAL FIRST FLOOR PLANS IK <br /> M1.2 MECHANICAL SECOND FLOOR RECORD DRAWINGS Checked by(P.M.): <br /> M1.3 MECHANICAL THIRD FLOOR RECORD DRAWINGS <br /> M1.4 MECHANICAL FOURTH FLOOR PLANS Checked by(C.C.): <br /> M2.1 MECHANICAL DIAGRAMS JH <br /> M5.1 MECHANICAL 5CHEDULE5 Project No. <br /> I� <br /> M0. 1 ;; <br />