Laserfiche WebLink
NEUDORFER <br /> ENGINEERS ;P <br /> ; <br /> 4N 5"n-COMPâ–șN, <br /> PROJECT McDonough Loop Radome Building 313 <br /> LOCATION Tobyhanna Army Depot, PA <br /> Executive Summary <br /> Overview <br /> Commissioning at Clare's Place project verified that the building systems perform interactively <br /> according to their design intent and the Owner's operational needs. <br /> Replaced 3 Outdoor Air and Exhaust DOAS units with 3 exhaust fans and 3 intake fans. The <br /> units run 24/7/365. The intake fans have staged heating modules on the discharge of the fans. <br /> Neudorfer Engineers verified the fans operated and the heaters staged up. <br /> Testing Results <br /> Intake Fans (IF-1, IF-2, and IF-3) <br /> The intake fans provide fresh air to the space 24/7/365. They have operable duct heaters on the <br /> discharge of the fans and the fan intakes are near existing outdoor AC units, which may or may <br /> not operate. These units were successfully tested for airflow by the TAB personnel, and for <br /> staged heating. <br /> Exhaust Fan (EF-1, EF-2, and EF-3) exhaust fan provides ventilation continually. They operate <br /> 24/7/365. The fans were successfully commissioned. <br /> Open Issues <br /> None <br />