Laserfiche WebLink
Commissioning Plan Page 7 <br /> C. Commissioning Team <br /> 1. Commissioning is a team effort. The following organizations each contribute their <br /> expertise to the functional success of the project. <br /> Owner <br /> IF IF <br /> Architect General Contractor Engineer <br /> Mechanical Contractor Commissioning Authority/ Electrical Contractor <br /> TAB Contractor <br /> 2. The following commissioning flowchart summarizes the commissioning activities <br /> to be performed on the project. <br /> Installation <br /> Verification Pre-FPT Startup Point to Point <br /> (Contractor) (CA) (Contractor) (CC) <br /> TAB Report <br /> & TAB <br /> Back-Check <br /> PVTs FPT Commissioning <br /> (CC) (CC, CA) Report <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 7 of 68 Everett, WA <br />