Commissioning Plan Page 32 <br /> c) Investigate the dynamic interactions between components in the building <br /> system. Evaluate the scheduling, the interaction between heating and <br /> cooling, and the effectiveness of the HVAC system in meeting the comfort <br /> requirements. <br /> 9. In some systems, deficient performance will result in additional work being <br /> required to commission the systems. This work will be completed under the <br /> direction of the Owner's Representative and the Engineer, with input from the <br /> Contractor and equipment supplier. Whereas all members will have input and <br /> the opportunity to discuss the work and resolve problems, the Engineer will have <br /> final jurisdiction on the work needed to achieve performance. Corrective work <br /> shall be completed in a timely fashion to permit timely completion of the <br /> commissioning process. <br /> 10. A functional performance test shall be aborted if any system deficiency prevents <br /> the successful completion of the test. The responsible subcontractor shall correct <br /> all deficiencies in accordance with the applicable contract requirements. The item <br /> shall then be retested until it has been completed with no errors. Installing <br /> Contractor is responsible for retesting costs. <br /> VI. QUALIFICATIONS AND EXPERIENCE <br /> See attached documentation. <br /> Commissioning Firm: Certifications, list of similar projects, and company history. <br /> Commissioning Authority: Names, certifications, and resumes for all firm personnel, <br /> including persons to assist the designated lead CA. The Commissioning Firm's and <br /> Commissioning Specialists' certifications shall be maintained for the entire duration of <br /> the duties specified herein. <br /> VII. BLANK PRE-FUNCTIONAL CHECK FORMS <br /> See attached documentation. <br /> Pre-Functional Performance Test (PFPT) checklists establish criteria for acceptance <br /> and illustrate the progress of Commissioning activities throughout the project's <br /> construction and installation phases. <br /> PFPTs are to be executed by the Contractor prior to equipment startup and system <br /> functional performance testing. <br /> VIII. BLANK FUNCTIONAL PERFORMANCE TEST FORMS <br /> See attached documentation. <br /> Functional Performance Test (FPT) verify that all systems are operating and interacting <br /> with other systems correctly, per contract sequences of operations, design intent, and <br /> owner's project requirements. <br /> FPTs are to be executed by Contractor's skilled technician familiar with the project, as <br /> directed and witnessed by Neudorfer Engineers. <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 32 of 68 Everett, WA <br />