My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 9/27/2024 Amendment 1
>
Contracts
>
Agreement
>
Interagency Agreements (not grant agreements)
>
Snohomish County 9/27/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2024 3:21:54 PM
Creation date
9/30/2024 2:02:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
9/27/2024
Council Approval Date
9/4/2024
End Date
12/10/2025
Department
Information Technology
Department Project Manager
Kevin Walser
Subject / Project Title
Lidar Imagery
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002842
Total Compensation
$21,268.00
Contract Type
Agreement
Contract Subtype
Interagency Agreements (not grant agreements)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Tiling Scheme <br />DNR Format: All geospatial products will be delivered in a 4500 x 4500-foot tiling scheme <br />unless otherwise specified. ESRI grids and shapefiles will have complete and correct associated <br />projection files. Tiled products will be edge matched, without gaps or overlap. <br />Block Delivery Plan — Shapefile format once majority of acquisition is complete. <br />Schedule & Timeline <br />NV5G, Inc. will work with DNR to coordinate data collection to coincide with optimal weather <br />conditions and as best meets the needs of the project. Collection will occur during leaf off and <br />snow -free conditions. All products will be delivered before the term of the contract ends (1 <br />year) and as block deliveries as planned by the Project Manager and DNR. <br />Cost Estimate <br />Lump sum costs are provided <br />below for the study areas <br />portrayed in Figure 1 and in <br />Exhibit A, assuming timeline <br />and deliverables listed above. <br />Changes in the size and/or <br />shape of the areas of interest <br />will result in modifications to <br />the cost structure. Costs <br />include mobilization, <br />acquisition, survey, <br />processing of products and <br />reporting. Option A <br />Cost <br />Six Counties (7,770 square <br />miles) <br />$2,657,323 <br />Option B <br />Cost <br />Thurston County (773 sqmi) <br />$259,730 <br />Adams County (1929 sqmi) <br />$648,144 <br />Snohomish County (115 sqmi) <br />$38,640 <br />City of Everett (63 sqmi) <br />$21,168 <br />City of Marysville (21 sqmi) <br />$7,056 <br />Option B Total <br />$974,738 <br />Page 1 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.