My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3373-14
>
Ordinances
>
Ordinance 3373-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 9:12:30 AM
Creation date
3/25/2014 1:48:01 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3373-14
Date
3/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT I <br /> The City's Responsible Official has the authority to amend mitigation measures related to specific environmental studies, such as traffic, <br /> stream,and wetland reports,when conditions have changed and additional State Environmental Policy Act(SEPA) analysis is completed. <br /> This authority does not apply to mitigation measures associated with standards and requirements elsewhere in the Development <br /> Agreement,such as mitigation measures associated with standards or other requirements found in Attachment F,Attachment G,or <br /> Attachment H. <br /> Polygon and the City hereby amend,or amend and restate,certain table rows of Attachment I to the Development Agreement as follows, <br /> with strikeouts deleted and underlines added: <br /> Element of the Environment and Mitigation Action Mitigation Where Found in Responsible Implementation <br /> Measure is Tied to EIS Documents Party Time Frame <br /> P&A F, page 1-8 Buffer widths for FEIS 4.5.4.1, City Shoreline <br /> Plants and Animals F: Development of a tidal Simpson Pad Addendum 1 pages permits Prior to <br /> restoration plan for Wetland C 9-10, Addendum 4, construction of <br /> pages 2-3 residences on <br /> Simpson Pad <br /> Construction <br /> 2015 or first <br /> construction <br /> season after <br /> issuance of state <br /> and federal <br /> permits. <br /> P&A G, page 1-8-9 Buffer widths for FEIS 4.5.4.1 OAA <br /> Plants and Animals G: Remove or pay for the Simpson Pad Addendum 4, pages City Understanding. <br /> removal of up to 50 pilings in the Snohomish River 22=3. Shoreline <br /> associated with the City's tidal restoration plan Being done as permits, Prior to <br /> part of Wetland C construction of <br /> restoration / residences on <br /> enhancements. Simpson Pad <br /> Polygon At time of <br /> contributed to the construction of <br /> cost. Wetland C <br /> restoration <br /> V/L&G 0, pagel-15 All Development on DEIS 5.2.12.3 OAA PDO, Land <br /> Visual/Light and Glare 0: Use an east west Simpson Addendum 5, page 2 Division and/or <br /> Attachment I-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.