My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3373-14
>
Ordinances
>
Ordinance 3373-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 9:12:30 AM
Creation date
3/25/2014 1:48:01 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3373-14
Date
3/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element of the Environment and Mitigation Action Mitigation Where Found in Responsible Implementation <br /> Measure is Tied to EIS Documents Party Time Frame <br /> Engineer documents that the reduced number of <br /> residential units results in a smaller proportionate <br /> share of traffic volumes attributable to this project. <br /> T D, page 1-19 Buildings on Simpson DEIS 5.5.13.7 and OM PDO, Issuance <br /> Pad FEIS of Building <br /> Transportation D:-A-To meet secondary Addendum 4 page 2 Permits <br /> emergency access requirements, a 34-foot wide <br /> driving surface/ main entrance boulevard with no <br /> parking on either side must be provided from the <br /> 415t Street roundabout to the first intersection within <br /> the development. must be provided to the <br /> with Appendix D of the City of Everett Fire Code. <br /> Attachment I-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.