Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/7/2024 5/7/2024 BLDG 10-DRYWALL Matt Schreifels PARTIAL Vertical Exterior Densglass <br /> NAILING APPROVAL <br /> Notes: <br /> Vertical Exterior Densglass <br /> 5/14/2024 5/14/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 5/8/2024 3:54 PM PACIFIC RIDGE-DRH LLC <br /> Frame and fire stopping inspection for Unit B. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:1831 100TH ST SW UNIT B <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> Excludes exterior deck,framing.To be inspected prior to cover and/or final. <br /> BLDG 09-FIRE CORRECTION <br /> 5/14/2024 5/14/2024 STOPPING/BLOCKIN Matt Schreifels REQUIRED eTRAKiT Inspection Request <br /> G <br /> Notes: <br /> 5/8/2024 3:54 PM PACIFIC RIDGE-DRH LLC <br /> Frame and fire stopping inspection for Unit B. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:1831 100TH ST SW UNIT B <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> Address gabs at party wall dens glass and missing penetrations in top plate.Reschedule fire,stopping inspection once corrections have been addressed <br /> 5/16/2024 5/17/2024 BLDG 12- Matt Schreifels PARTIAL See notes <br /> INSULATION APPROVAL <br /> Notes: <br /> Insulation inspection for the exterior soffits for entry ways of building E <br /> BLDG 10-DRYWALL PARTIAL <br /> 5/21/2024 5/21/2024 NAILING Matt Schreifels APPROVAL Exterior Vertical Densglass <br /> Notes: <br /> Exterior under soffit Densglass <br /> 5/21/2024 5/21/2024 BLDG 12- <br /> INSULATION Matt Schreifels CANCELLED eTRAKiT Inspection Request <br /> Notes: <br /> 5/14/2024 3:29 PM PACIFIC RIDGE-DRH LLC <br /> Batts insulation inspection for entire building E.Units A through C. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:1831 100TH ST SW UNIT B <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> 5/22/2024 5/22/2024 BLDG 12 INSULATION Matt Schreifels PARTIAL APPROVAL See Notes <br /> Notes: <br /> excludes blow in insulation in attic area.To be inspected prior to final approval <br /> I <br /> Printed: Friday, 23 August,2024 4 of 6 rk <br /> SUPERION <br />