My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1831 100TH ST SW B 2024-11-12
>
Address Records
>
100TH ST SW
>
1831
>
1831 100TH ST SW B 2024-11-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 2:32:54 PM
Creation date
10/3/2024 10:46:06 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1831
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2401-015 Description: Install New Plumbing <br /> Applied: 1/10/2024 Approved: 1/11/2024 Site Address: 1831 100TH ST SW UNIT B <br /> Issued: 1/11/2024 Finaled: 7/26/2024 City,State Zip Code: EVERETT,WA 98204 <br /> Status: FINALED Applicant: Lois Mccain <br /> Parent Permit: B2308-081 Owner: PACIFIC RIDGE-DRH LLC <br /> Parent Project: Contractor: RAINIER CUSTOM(PLBG) PLUMBING INC <br /> Details: <br /> Install new plumbing throughout the house <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 02- JASON <br /> 3/5/2024 3/5/2024 GROUND MORRISSEY APPROVAL see notes <br /> WORK/SLAB <br /> Notes: <br /> 3/4/2024 12:29 PM Lois Mccain <br /> Contact Name:Lois Mccain <br /> Site Address:1831 100TH ST SW UNIT B <br /> Phone:4257891767 <br /> e-Mail:Lois@rainiercustomplumbing.com <br /> -Rough under slab DWV ok.**** Make sure to wrap or sleeve wirsbo pex water supply at penetration through garage slab per UPC 312.2. <br /> 5/6/2024 5/6/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 5/3/2024 2:42 PM Lois Mccain <br /> Contact Name:Lois Mccain <br /> Site Address:1831 100TH ST SW UNIT B <br /> Phone:4257891767 <br /> e-Mail:Info@rainiercustomplumbing.com <br /> -Non code horizontal wet vent system.Per UPC horizontal wet vent system is for bathroom group fixtures in an individual bath.Cannot tie both <br /> bathrooms together.Must tie in downstream of each other.AW must tie in downstream of bathrooms as well. UPC 908.2.1 through 908.2.5.-Under <br /> 2021 code toilet has to be last fixture on horizontal wet vent system,can no longer tie in showers and tubs downstream of toilet without separately <br /> venting. UPC 908.2.4.-Support ABS every 4'on horizontal per UPC chap 3.***Corrections within 2nd floor ceiling. <br /> I <br /> Printed:Thursday,03 October, 2024 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.