Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 4/16/2024 4/16/2024 BLDG 07-EXTERIOR I Matt Schreifels PARTIAL See notes <br /> SHEAR APPROVAL <br /> Notes: <br /> P1-6 exterior shear walls inspected. <br /> Provide special inspection(Upload to permit portal)report for all shear walls that have 4"o.c.or less nailing. <br /> 4/18/2024 4/18/2024 BLDG 12- Matt Schreifels PARTIAL Pre-Insulation <br /> INSULATION APPROVAL <br /> Notes: <br /> Pre-Insulation at showers at Party Walls <br /> 4/24/2024 4/24/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL Garage portal framing <br /> APPROVAL <br /> Notes: <br /> Garage portal framing(2-sided shear locations) <br /> 4/24/2024 4/24/2024 T <br /> G 10-DRYWALL Matt Schreifels PARTIAL Pre-Rock <br /> NAILING APPROVAL <br /> Notes: <br /> Pre-Rock @ Prty Wall Shwr/bth locations <br /> BLDG 10-DRYWALL PARTIAL <br /> 5/7/2024 5/7/2024 NAILING Matt Schreifels APPROVAL Vertical Exterior Densglass <br /> Notes: <br /> Vertical Exterior Densglass <br /> 5/14/2024 5/14/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 5/8/2024 3:55 PM PACIFIC RIDGE-DRH LLC <br /> Frame and fire stopping inspection for Unit C. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:1831 100TH ST SW UNIT C <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> Excludes exterior decks to be inspected prior to final <br /> BLDG 09-FIRE CORRECTION <br /> 5/14/2024 E <br /> 4/2024 STOPPING/BLOCKIN Matt Schreifels REQUIRED eTRAKiT Inspection Request <br /> G <br /> Notes: <br /> 5/8/2024 3:55 PM PACIFIC RIDGE-DRH LLC <br /> Frame and fire stopping inspection for Unit C. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:1831 100TH ST SW UNIT C <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> Address gabs at party wall dens glass and missing penetrations in top plate.Reschedule fire,stopping inspection once corrections have been addressed. <br /> 5/16/2024 5/17/2024 BLDG 1 Matt Schreifels PARTIAL See notes <br /> INSULATION <br /> N APPROVAL <br /> Notes: <br /> Insulation inspection for the exterior soffits for entry ways of building E <br /> I <br /> Printed: Friday, 23 August,2024 4 of 6 rk <br /> SUPERION <br />