Laserfiche WebLink
NORTH <br /> 0 /111� verizonv' <br /> INSTALL 13 LF OF Kow .ne`sbelow. <br /> Call before you dig- <br /> 1 -2" HDPE CONDUIT O PROJECT: <br /> 1801AVAO. <br /> 16+00 (BORE) �e LEGEND: .I�"800.3 ROW EVT 0637 <br /> (° ) STA: 16+09 I QO — — BORE/MISSILE BORE <br /> BOREPIT/ INSTALL (1) BMI.TIN�ENTI, <br /> OPEN TRENCH CITY OF EVERETT <br /> R.O.W. 36" x 60" x 36"VAULT R.O.W. SIDEWALK 3B 1� LOATIaN <br /> E.O.P EDGE OF PAVEMENT 2215 MERRILL CREEK PKWY <br /> L I I EVERETT,WA <br /> EX WATER ®I B.O.0 BACK OF CURB <br /> MAINTAIN 24" MIN CLEARANCE R.O.W. RIGHT OF WAY <br /> B.O.C. POTHOLE AND RESTORE TO STANDARDS B.O.C. C.L.--- STREET CENTERLINE o Z <br /> • POTHOLE LOCATION _ <br /> INSTALL 70 LF OF I L LU o <br /> 1 - 2" HDPE CONDUIT —w W o 10 20 ao > Q Q <br /> (BORE) I _ <br /> O N z U z <br /> EX SEWER v v o ♦/� o o <br /> MAINTAIN 24" MIN CLEARANCE I 75TH ST SW U D N Q w o <br /> C.L. - POTHOLE AND RESTORE TO STANDARDS - - - -C.L. V1 � J <br /> z a W a <br /> EX ELEC o Y <br /> MAINTAIN 24" MIN CLEARANCE I N Fm ? Z <br /> POTHOLE AND RESTORE TO STANDARDS U o <br /> UG�\ 1GE E UGE U(�f UGE UL U <br /> U) J^ EX GAS - GAS — GAS — G�S — GAS 0 a <br /> + MAINTAIN 24" MIN CLEARANCE + <br /> In B.O.C. POTHOLE AND RESTORE TO STANDARDS B.O.C. FORESITE <br /> —T /< Foreslle GrouP�Inc. grown <br /> 1/�J+00 1 +00 '� V/�/ 3000EC—Chavez St. a1334.887.6064 <br /> Sure 400 f334.88].6024 <br /> Austin,TX]8]02 <br /> z_ TREES DRIVEWAY io Li <br /> J R.O.W. R.O.W. J <br /> -� - - <br /> _ ---�- SS SS S SS � <br /> SS <br /> o <br /> INSTALL 215 LF OF <br /> 1 -2" HDPE CONDUIT <br /> STA: 16+78 (BORE) <br /> DIG (1) 5'x 5' BOREPIT <br /> ENGINEER: AB <br /> EX SEWER <br /> DRAWN BY: NL <br /> MAINTAIN 24" MIN REVISIONS <br /> CLEARANCE DATE DESCRIPTION INITIAL <br /> POTHOLE AND RESTORE I NO TETOCONTRACTOR. 04/02/19 REVISION I.O AB <br /> ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREE <br /> TO STANDARDS TO BE DUGGED USING HYDRO VACCUUM EXCAVATION. <br /> CAUTION" <br /> ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OF <br /> ADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED IN <br /> ACCORDANCE WITH ALL REQUIRED ADA STANDARDS AND <br /> Cg SPECIFICATIONS. <br /> 1520 75TH STREET SOUTHWEST EVERETT ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ON <br /> FIELD SURVEY AND OBSERVATIONS.LOCATIONS MAY NOT BE <br /> ACCURATE OR COMPLETE. <br /> EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT <br /> THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN TH <br /> CONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36 PROPERTY OF MCI COMMUNICATIONS SERVICES,INC..BOT <br /> SING ISSUED IN STRICT CONFIDENCE AND SHALL NOT B <br /> / INCHES OF COVER WHEN UNOBSTRUCTED.CONTRACTOR TO REPRODUCED, COPIED, OR <br /> USED FOR ANY PURPOSE <br /> MAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES. WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> DEPTH TO BE ADJUSTED ACCORDINGLY. <br /> UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ON SCALE <br /> DOCUMENT RESEARCH AND FIELD EVALUATION. THE <br /> INFORMATION MAY NOT BE ACCURATE OR COMPLETE.IT IS HORIZONTAL: 1"=20' <br /> THE CONTRACTOR'S RESPONSABILITY TO PHYSICALLY <br /> LOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIES VERTICAL: N/A <br /> WITALL <br /> INS <br /> HI CONSTRUCTION MUST COMPLY WITH MINIMUM <br /> HORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES. <br /> SHEET: C-09 <br />