Laserfiche WebLink
NORTH <br /> 0 /11� verizoal <br /> Ko,m what's below. <br /> Call before you dig <br /> PROJECT: <br /> LEGEND: <br /> 1801AVAO.3 ROW EVT 0637 <br /> BORE/MISSILE BORE 1ER.Ill- <br /> OPEN TRENCH CITY OF EVERETT <br /> R.O.W. SIDEWALK <br /> E.O.P EDGE OF PAVEMENT 2215 MERRILL CREEK PKWY <br /> R.O.W. <br /> EVERETT,WA <br /> B.O.0 BACK OF CURB <br /> _ R.O.W. RIGHT OF WAY <br /> C.L.--- STREET CENTERLINE <br /> B.O.C. CB • POTHOLE LOCATION L 00 _ z <br /> B.O.C. <br /> Lu n ' W ° <br /> W T <br /> W 0' 10' 20' 40' > Q J <br /> W —W - 0 <br /> _ zo Z Z <br /> —W —W v N 0 o <br /> 75TH ST SW ~ ~ ° <br /> U g co Q W ° <br /> 0 <br /> z <br /> — — _ Q LLI <br /> C.L. N <br /> ow <br /> w mom 5 IJi o <br /> UGE UGE UGE UGE UGE J 0 " <br /> _ UGE UGE UGE UG UGE UGEG� — — — GAS — — — GAS — — — GAS — a <br /> — GAS — — — GAS — — GAS — — — I co <br /> + GAS — cv <br /> NO _ _ SW _ _ FORESITE <br /> N B.O.C.— _ 24+00 I` — S W— S W S W ce B.O.C. N <br /> _ _ groin <br /> _ F...Group,Inc. w I wxw.fg-Inc net <br /> —O • O O 3000 E Ceasr Chavez Sf. a 1334.66].6064 <br /> (n ^ Suite 400 f 1 334.66].6024 <br /> V' Austin,TX]6]02 <br /> w TREES R.O.W. _z <br /> z <br /> J � o <br /> = R.O.W. o <br /> INSTALL 126 LF OF J <br /> v ALL 89 LF OF STA: 24+00 1 - 2" HDPE CONDUIT EX STORM `y U <br /> Q 1 -2" HDPE CONDUIT DIG (1) 5'x 5' BOREPIT (BORE) MAINTAIN 24" MIN ~ <br /> � Q <br /> (BORE) CLEARANCE <br /> POTHOLE AND RESTORE <br /> TO STANDARDS <br /> SS I EX WATER <br /> � ENGINEER: AB <br /> SS �c _ MAINTAIN 24" MIN DRAWN BY: NL <br /> SS _ _ CLEARANCE <br /> REVISIONS <br /> POTHOLE AND RESTORE DATE DESCRIPTION INITIAL <br /> TO STANDARDS NOTE TO CONTRACTOR. 04/02/19 REVISION I.O AB <br /> ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREE <br /> TO BE DUGGED USING HYDRO VACCUUM EXCAVATION. <br /> CAUTION" <br /> 1320 75TH ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OF <br /> STREET SOUTHWEST ADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED IN <br /> HWEST EVERETT I ACCORDANCE WITH ALL REQUIRED ADA STANDARDS AND <br /> SPECIFICATIONS. <br /> ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ON <br /> 3 FIELD SURVEY AND OBSERVATIONS.LOCATIONS MAY NOT BE <br /> ACCURATE OR COMPLETE. EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT <br /> / THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN TH <br /> CONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36 PROPERTY OF MCI COMMUNICATIONS SERVICES,INC..BOT <br /> E <br /> INCHES OF COVER WHEN UNOBSTRUCTED.CONTRACTOR TO BEING ISSUED IN STRICT CONFIDENC AND SHALL NOT B <br /> REPRODUCED, COPIED, OR USED FOR ANY PURPOSE <br /> MAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES. WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> DEPTH TO BE ADJUSTED ACCORDINGLY. <br /> / UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ON SCALE <br /> DOCUMENT RESEARCH AND FIELD EVALUATION. THE <br /> INFORMATION MAY NOT BE ACCURATE OR COMPLETE.IT IS HORIZONTAL: 1"=20' <br /> THE CONTRACTOR'S RESPONSABILITY TO PHYSICALLY <br /> LOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIES VERTICAL: N/A <br /> 3 WITHIN CONSTRUCTION PATH. <br /> ALL INSTALLATIONS MUST COMPLY WITH MINIMUM <br /> (� HORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES. <br /> SHEET: C-12 <br />