Laserfiche WebLink
MCI CONSTRUCTION DETAILS/TYPICALS verizonN' <br /> TYPICAL OPEN TRENCH DETAIL JEe to" E. PROJECT: <br /> 1703MNTR.006 ROW EVT 0577 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY OFEVERETT <br /> 1602 ZITT AVE <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH & PLACE CONDUIT TRENCH & PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> 12"MIN. <br /> 6"MIN. EXISTING GRADE EXISTING GRADE O w <br /> z w <br /> U � ♦ = z: <br /> CONDUIT AS SPECIFIE I I w V a F <br /> E/W ANY NUMBER OF I I 12"MIN.BELOW 12"MIN.BELOW BURIED CABLE V U <br /> FINISHED GRADE > > <br /> INNERDUCTS AND/OR FINISHED GRADE BURIED CABLE MARKER TAPE > � <br /> HDPE's,AS SPECIFIED LU I— 5' � <br /> MARKER TAPE Q w > <br /> &FIBER OPTIC CABLE V z w z <br /> COMPACT BACKFILL IN 6"LAYERS + <br /> -- R/ MI�P„ COMPACT BACKFILLS IN A WITH ROCK FREE MATERIAL.2-SACK N z0 OU = o <br /> COVER 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAY BE E 35; <br /> FREE MATERIAL REQUIRED BY THE LOCAL GOV. `—^ z <br /> EOP° AGENCY VC Q O <br /> ..: C Z d z <br /> w CONCRETE OR. �_ H <br /> CONDUIT AS SPECIFIED E/W <br /> ASPHALT ROADS n o <br /> :: ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED E/W N H <br /> > ; AND/OR HDPE's,AS SPECIFIED ANY NUMBER OF INNERDUCTS u O Q <br /> &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIED U <br /> EOP X &FIBER OPTIC CABLE Q p <br /> CONDUIT AS SPECIFIED <br /> RAW E/W PULL ROPE <br /> SAW CUT AND 3 3 FORESITE <br /> REMOVE 2'MIN. <br /> Ro rest,Group.Inc. w www fg-Inc nel <br /> 3000 E Cesar CM1avez Sf. o 334.86].6064 <br /> Suite 400 f334.86].6024 <br /> Husfin,TX]6]02 <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> \ EQUALLY <br /> / ENGINEER: AB <br /> FILLED BAGS DRAWN BY: AB <br /> \ \ REVISIONS <br /> \ FILLED BAGS DATE DESCRIPTION INITIAL <br /> A / CLEAN BACKFILL <br /> COVER <br /> \ TOE OF BANK \ <br /> NOTES: <br /> CONDUIT AS SPECIFIED \1. INTERLOCK BAGS INTO TRENCH,ONE EXCEPT AS MAY BE OTHERWISE PROVIDED CONTRACT <br /> / THE <br /> E/W ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE THESE DRAWINGS ANOSGECGATIO ESERVIONS E,INCREM BOTH <br /> PROPERTY ISSUED <br /> MCI COMMUNICATIONS SERVICES,INC..BOT <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE BEING DUCED(COPIED, OR"USED°FORD ANYBHA T T B <br /> \ ` HDPE's,AS SPECIFIED& ` THIRD LAYER PARALLEL,ETC..TAMP THE WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE SCALE <br /> ` \ \ THE BAGS SO THEY WILL CONFORM TO <br /> THE PREDISTURBED BANK. <br /> NOTE: 2.BAGS WILL EXTEND HE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE / AND DEPTH OF EXCAVATION TO <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. VERTICAL: N/A <br /> SHEET: D-04 <br />