Laserfiche WebLink
MCI METRO GENERAL NOTES AND REQUIREMENTS verizoal <br /> PROJECT: <br /> PROJECT ID NUMBER <br /> 1703MNTR.004 ROW EVT 0586 <br /> GENERAL NOTES MCI OSP CONSTRUCTION GENERAL REQUIREMENTS CITYNOFEVERETT <br /> 3619 ROCKER AVE <br /> EVERETT,WA <br /> 1. MCI COMPRISES THE FOLLOWING OPERATING ENTITIES: • ALL FEDERAL,STATE AND LOCAL SAFETY REGULATIONS MUST BE FOLLOWED WITHOUT EXCEPTION. <br /> MCI COMMUNICATIONS SERVICES,INC. <br /> MCI METRO ACCESS TRANSMISSION SERVICES,LLC a <br /> • PERSONAL PROTECTIVE EQUIPMENT APPROPRIATE FOR THE SPECIFIC WORK SITE SHALL BE USED AT ALL TIMES. cc <br /> MCI METRO ACCESS TRANSMISSION SERVICES OF MASSVIRGI C INC. AT A MINIMUM,HARD HAT,SAFETY SHOES/STEEL-TOED BOOTS,AND FLORESCENT ORANGE OR GREEN WORK VEST O <br /> MCI METRO ACCESS TRANSMISSION SERVICES OF MASSACHUSETTS,INC. Z <br /> ARE REQUIRED UPON ENTERING ANY MCI WORK SITE. U O — z <br /> - METROPOLITIAN FIBER SYSTEMS OF NEW YORK,INC. Uj — O <br /> _U Lu 0 Q <br /> • USE OF INTOXICANTS,DRUGS,INHALANTS OR ANY OTHER SUBSTANCES THAT MAY IMPAIR ALERTNESS ARE STRICTLY 0, Q Q 2. ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE APPLICABLE CODES OR REQUIREMENTS OF ANY REGULATING > = J <br /> GOVERNMENTAL AGENCY,MCI METRO,OR THE RIGHT-OF-WAY GRANTOR. PROHIBITED. O w H D- N <br /> � Z (D z <br /> • CONTRACTORS ARE NOT ALLOWED TO CUT ANY CABLE. CABLES SCHEDULED FOR REMOVAL WILL BE CUT BY MCI 4) O 7 ~ <br /> 3. LOCATIONS OF SOME OF THE PHYSICAL FEATURES WERE OBTAINED FROM DATED RAILROAD VALUATION MAPS OR OTHER CC /A U o <br /> DRAWINGS,AND MAY BE AS SHOWN OR DEPICTED ON THESE DRAWINGS. OPERATIONS PERSONNEL,AND ONLY AFTER VERIFICATION THAT ALL TRAFFIC HAS BEEN OFF-LOADED. C � �/ > z <br /> U Z LU OU <br /> CC o <br /> 4. UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS,BUT ARE NOT • EXTREME CAUTION MUST BE USED AT ALL TIMES WHEN WORKING ON OR NEAR ACTIVE CABLES. AN MCI EMPLOYEE z C d <br /> NECESSARILY EXACT.THEREFORE,UTILITY LOCATIONS WILL BE VERIFIED AT LEAST 100 FEET IN ADVANCE OF TRENCHING OR OR CONTRACT REPRESENTATIVE MUST APPROVE AND BE PRESENT PRIOR TO AND DURING ALL CABLE HANDLING Q LU = O <br /> PLOWING,SO THAT CHANGES IN CABLE PLACEMENT CAN BE MADE IN EVENT OF CONFLICT. ACTIVITIES. H 0 Q <br /> w <br /> TOOLS AND EQUIPMENT SPECIFICALLY DESIGNED FOR THE JOB AT HAND ARE REQUIRED. USE THE PROPER TOOL ■� 0 <br /> 5. ALL KNOWN BURIED OBSTRUCTIONS ARE SHOWN ON SITE PLAN.ANY AND ALL OTHERS ENCOUNTERED ARE ALSO THE • U Q � <br /> RESPONSIBILITY OF THE CONTRACTOR TO LOCATE,PROTECT,AND REPAIR,IF DAMAGED. FOR THE JOB. U <br /> Q <br /> 6. ANY AND ALL IMPROVEMENTS,SUCH AS ASPHALT OR CONCRETE PAVEMENT,CURBS,GUTTERS,WALKS,DRAINAGE DITCHES, • CONDUIT WORK INVOLVING ACTIVE CABLES REQUIRES SPECIALIZED TOOLS SPECIFICALLY DESIGNED TO ACCESS <br /> EMBANKMENTS,SHRUBS,TREES,GRASS SOD,ETC.,IF DAMAGED,SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS. DUCTS WITH ACTIVE CABLES. <br /> • PROTECTING MCI FACILITIES IS EXTREMELY IMPORTANT;HOWEVER,SAFETY REGARDING YOURSELF AND OTHERS IS FORESITE <br /> 7. EQUIPMENT TYPES SPECIFIED HEREIN(ie:"BACKHOE""SWAMP PLOW',ETC.)ARE SUGGESTIONS ONLY AND ARE NOT INTENDED THE MOST IMPORTANT PART OF ANY PROJECT. group <br /> AS REQUIREMENTS.CONTRACTOR WILL BE NOTIFIED AS TO EXCEPTIONS. Fur BB Gm p,Inc. wlwx fgAh°°� <br /> SoCO E-,Chavez St. e 1 334.007.6064 <br /> Suite 400 11 33,.007.6024 <br /> Austin,TX 70702 <br /> ENGINEER: AB <br /> DRAWN BY: Ps <br /> REVISIONS <br /> n^TF DESCRIPTION INITIAL <br /> EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT <br /> THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE <br /> PROPERTY OF MCI COMMUNICATIONS SERVICES,INC..BOT <br /> BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT B <br /> REPRODUCED, COPIED, OR USED FOR ANY PURPOSE <br /> WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> SCALE <br /> HORIZONTAL: N/A <br /> VERTICAL: N/A <br /> SHEET: D-01 <br />