Laserfiche WebLink
MCI CONSTRUCTION DETAILS/TYPICALS verizonN' <br /> TYPICAL OPEN TRENCH DETAIL Ee P.-E. PROJECT: <br /> 1703MNTR.005 ROW EVT 0581 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY OFEVERETT <br /> Z ZaR AVE <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH & PLACE CONDUIT TRENCH & PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> 12"MIN. <br /> 6"MIN. EXISTING GRADE EXISTING GRADE O <br /> U � z <br /> ♦ O o <br /> CONDUIT AS SPECIFIE I I w V F <br /> E/W ANY NUMBER OF 12"MIN.BELOW 12"MIN.BEIjEf <br /> V <br /> I I BURIED CABLE <br /> INNERDUCTS AND/OR FINISHED GRADE FINISHED G j <br /> BURIED CABLE MARKER TAPE J <br /> HDPE's,AS SPECIFIED H 0 <br /> &FIBER OPTIC CABLE MARKER TAPE 0 � d z <br /> COMPACT BACKFILL IN 6"LAYERS 4� z Z (D L_ <br /> -- R/ Mltt COMPACT BACKFILLS IN A WITH ROCK FREE MATERIAL.2-SACK N p OU o <br /> 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAY BE E F- <br /> COVER FREE MATERIAL REQUIRED BY THE LOCAL GOV. " Z w <br /> EOP° AGENCY V Q <br /> Z a O z <br /> .mow. CONCRETE ❑R �_ Q <br /> CONDUIT AS SPECIFIED E/W <br /> ASPHALT ROAD- vi w <br /> ¢ :: ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED E/W N H o <br /> > " '. ; AND/OR HDPE's,AS SPECIFIED ANY NUMBER OF INNERDUCTS w ■ D z <br /> &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIEDuO <br /> EOP &FIBER OPTIC CABLE Q <br /> CONDUIT AS SPECIF <br /> RAW E/W PULL ROPE <br /> SAW CUT AND 3 3 FORESITE <br /> REMOVE 2'MIN. <br /> Ro rest,Group.Inc. w www fg-Inc net <br /> 3000 E Cesar CM1avez St. o 334.86].6064 <br /> -i Am,00 f 334.86].6024 <br /> Bustin,TX]6]02 <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> \ EQUALLY <br /> / ENGINEER: AB <br /> FILLED BAGS DRAWN BY: PS <br /> \ \ REVISIONS <br /> \ FILLED BAGS DATE DESCRIPTION INITIAL <br /> A / CLEAN BACKFILL <br /> COVER <br /> \ TOE OF BANK \ <br /> NOTES: <br /> CONDUIT AS SPECIFIED \1. INTERLOCK BAGS INTO TRENCH,ONE EXCEPT AS MAY BE OTHERWISE PROVIDED CONTRACT <br /> / THE <br /> E/W ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE THESE DRAWINGS ANOSPECGATIO ESERVIONS E,INCREM BOTH <br /> PROPERTY ISSUED <br /> MCI COMMUNICATIONS SERVICES,INC..BOT <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE BEING DUCED(COPIED, OR"USED°FORD BHA TNOT <br /> \ ` HDPE's,AS SPECIFIED& ` THIRD LAYER PARALLEL,ETC..TAMP THE WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE SCALE <br /> ` \ \ THE BAGS SO THEY WILL CONFORM TO <br /> THE PREDISTURBED BANK. <br /> NOTE: 2.BAGS WILL EXTEND HE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE / AND DEPTH OF EXCAVATION TO <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. VERTICAL: N/A <br /> SHEET: D-04 <br />