MCI METRO GENERAL NOTES AND REQUIREMENTS verizon
<br /> PROJECT:
<br /> PROJECT ID NUMBER
<br /> 1703MNTR.003 ROW EVT 0937
<br /> GENERAL NOTES MCI OSP CONSTRUCTION GENERAL REQUIREMENTS CITYNOFEVERETT
<br /> 2715 EVERETT AVE
<br /> EVERETT,WA
<br /> 1. MCI COMPRISES THE FOLLOWING OPERATING ENTITIES: • ALL FEDERAL,STATE AND LOCAL SAFETY REGULATIONS MUST BE FOLLOWED WITHOUT EXCEPTION.
<br /> MCI COMMUNICATIONS SERVICES,INC.
<br /> MCI METRO ACCESS TRANSMISSION SERVICES,LLC a
<br /> • PERSONAL PROTECTIVE EQUIPMENT APPROPRIATE FOR THE SPECIFIC WORK SITE SHALL BE USED AT ALL TIMES.
<br /> MCI METRO ACCESS TRANSMISSION SERVICES OF MASSVIRGI C INC. AT A MINIMUM,HARD HAT,SAFETY SHOES/STEEL-TOED BOOTS,AND FLORESCENT ORANGE OR GREEN WORK VEST O
<br /> MCI METRO ACCESS TRANSMISSION SERVICES OF MASSACHUSETTS,INC. Z W
<br /> ARE REQUIRED UPON ENTERING ANY MCI WORK SITE. J) � O < z
<br /> - METROPOLITIAN FIBER SYSTEMS OF NEW YORK,INC. Uj Q O
<br /> w C) 2 Q
<br /> V ^ , d
<br /> • W
<br /> 2. ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE APPLICABLE CODES OR REQUIREMENTS OF ANY REGULATING USE OF INTOXICANTS,DRUGS,INHALANTS OR ANY OTHER SUBSTANCES THAT MAY IMPAIR ALERTNESS ARE STRICTLY > � (�
<br /> GOVERNMENTAL AGENCY,MCI METRO,OR THE RIGHT-OF-WAY GRANTOR. PROHIBITED. 0 w H p N
<br /> i J) z
<br /> 3. LOCATIONS OF SOME OF THE PHYSICAL FEATURES WERE OBTAINED FROM DATED RAILROAD VALUATION MAPS OR OTHER • CONTRACTORS ARE NOT ALLOWED TO CUT ANY CABLE. CABLES SCHEDULED FOR REMOVAL WILL BE CUT BY MCI C4C! ZO ,/� Op W o
<br /> DRAWINGS,AND MAY BE AS SHOWN OR DEPICTED ON THESE DRAWINGS. OPERATIONS PERSONNEL,AND ONLY AFTER VERIFICATION THAT ALL TRAFFIC HAS BEEN OFF-LOADED. C v v, i.-_ - zO
<br /> Z U
<br /> 0
<br /> CC J
<br /> 4. UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS,BUT ARE NOT • EXTREME CAUTION MUST BE USED AT ALL TIMES WHEN WORKING ON OR NEAR ACTIVE CABLES. AN MCI EMPLOYEE C z cc <d Q
<br /> NECESSARILY EXACT.THEREFORE,UTILITY LOCATIONS WILL BE VERIFIED AT LEAST 100 FEET IN ADVANCE OF TRENCHING OR OR CONTRACT REPRESENTATIVE MUST APPROVE AND BE PRESENT PRIOR TO AND DURING ALL CABLE HANDLING Q LU O
<br /> PLOWING,SO THAT CHANGES IN CABLE PLACEMENT CAN BE MADE IN EVENT OF CONFLICT. ACTIVITIES. H p 2
<br /> N
<br /> w
<br /> TOOLS AND EQUIPMENT SPECIFICALLY DESIGNED FOR THE JOB AT HAND ARE REQUIRED. USE THE PROPER TOOL w p
<br /> 5. ALL KNOWN BURIED OBSTRUCTIONS ARE SHOWN ON SITE PLAN.ANY AND ALL OTHERS ENCOUNTERED ARE ALSO THE • U Q <
<br /> RESPONSIBILITY OF THE CONTRACTOR TO LOCATE,PROTECT,AND REPAIR,IF DAMAGED. FOR THE JOB. Q
<br /> 6. ANY AND ALL IMPROVEMENTS,SUCH AS ASPHALT OR CONCRETE PAVEMENT,CURBS,GUTTERS,WALKS,DRAINAGE DITCHES, • CONDUIT WORK INVOLVING ACTIVE CABLES REQUIRES SPECIALIZED TOOLS SPECIFICALLY DESIGNED TO ACCESS
<br /> EMBANKMENTS,SHRUBS,TREES,GRASS SOD,ETC.,IF DAMAGED,SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS. DUCTS WITH ACTIVE CABLES.
<br /> • PROTECTING MCI FACILITIES IS EXTREMELY IMPORTANT;HOWEVER,SAFETY REGARDING YOURSELF AND OTHERS IS FORESITE
<br /> 7. EQUIPMENT TYPES SPECIFIED HEREIN(ie:"BACKHOE""SWAMP PLOW',ETC.)ARE SUGGESTIONS ONLY AND ARE NOT INTENDED THE MOST IMPORTANT PART OF ANY PROJECT. group
<br /> AS REQUIREMENTS.CONTRACTOR WILL BE NOTIFIED AS TO EXCEPTIONS. Foh,s Gm p,Inc. wlw.A jgA,°°�
<br /> 3oCO E-,Ch..St. e 1 334.007.6064
<br /> Suite 400 11 33,.007.6024
<br /> Austin,TX 70702
<br /> ENGINEER: AB
<br /> DRAWN BY: NL
<br /> REVISIONS
<br /> n^TF DESCRIPTION INITIAL
<br /> EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT
<br /> THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
<br /> PROPERTY OF MCI COMMUNICATIONS SERVICES,INC..BOT
<br /> BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT B
<br /> REPRODUCED, COPIED, OR USED FOR ANY PURPOSE
<br /> WITHOUT SPECIFIC WRITTEN PERMISSION.
<br /> SCALE
<br /> HORIZONTAL: N/A
<br /> VERTICAL: N/A
<br /> SHEET: D-01