Laserfiche WebLink
MCI CONSTRUCTION DETAILS/TYPICALS verizon,/ <br /> TYPICAL OPEN TRENCH DETAIL JEe to" E. PROJECT: <br /> 1703MNTR.003 ROW EVT 0937 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY OF EVERETT <br /> 2 1'5 EVERETT AVE <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH & PLACE CONDUIT TRENCH & PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> 12"MIN. — <br /> 6"MIN. EXISTING GRADE EXISTING GRADE EEEE <br /> U � z W <br /> ♦ O w a <br /> CONDUIT AS SPECIFIE I I w V = F <br /> E/W ANY NUMBER OF 12"MIN.BELOW 12"MIN.BEJADEJ <br /> V U a <br /> I I BURIED CABLE <br /> INNERDUCTS AND/OR FINISHED GRADE FINISHED G j <br /> HDPE's,AS SPECIFIED BURIED CABLE MARKER TAPE n <br /> MARKER TAPE 0 w ~ � <br /> &FIBER OPTIC CABLE v Z I— z <br /> COMPACT BACKFILL IN 6"LAYERS 41 <br /> -- R/ MM2" COMPACT BACKFILLS IN A WITH ROCK FREE MATERIAL.2-SACK N p 'w W o <br /> COVER 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAY BE E. V, � <br /> EOP FREE MATERIAL REQUIRAGENCED BY THE LOCAL GOV. VC Q J a <br /> w CONCRETE OR: Q X, <br /> CONDUIT AS SPECIFIED E/W <br /> :�.� ;:ASPHALT ROADS ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED E/W N ■ ■ H o <br /> > =" '. ; AND/OR HDPE's,AS SPECIFIED ANY NUMBER OF INNERDUCTS w ■ 5 CD z <br /> &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIED umEOP.. &FIBER OPTIC CABLE Q <br /> CONDUIT AS SPECIF <br /> RAW E/W PULL ROPE <br /> SAW CUT AND 3 3 FORESITE <br /> REMOVE 2'MIN. <br /> Ro rest,Group.Inc. w www fg-Inc nel <br /> 3000 E Cesar CM1avez Sf. o 334.86].6064 <br /> Suite 400 f334.86].6024 <br /> Husfin,TX]6]02 <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> \ EQUALLY <br /> / ENGINEER: AB <br /> FILLED BAGS DRAWN BY: NIL <br /> \ \ REVISIONS <br /> \ FILLED BAGS DATE DESCRIPTION INITIAL <br /> A / CLEAN BACKFILL <br /> COVER <br /> \ TOE OF BANK \ <br /> NOTES: <br /> CONDUIT AS SPECIFIED \1. INTERLOCK BAGS INTO TRENCH,ONE EXCEPT AS MAY BE OTHERWISE PROVIDED CONTRACT <br /> / THE <br /> E/W ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE THESE DRAWINGS ANOSGECGATIO ESERVIONS E,INCREM BOTH <br /> PROPERTY ISSUED <br /> MCI COMMUNICATIONS SERVICES,INC..BOT <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE BEING DUCED(COPIED, OR"USED°FORD ANYBHA T T B <br /> \ ` HDPE's,AS SPECIFIED& ` THIRD LAYER PARALLEL,ETC..TAMP THE WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE SCALE <br /> ` \ \ THE BAGS SO THEY WILL CONFORM TO <br /> THE PREDISTURBED BANK. <br /> NOTE: 2.BAGS WILL EXTEND HE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE / AND DEPTH OF EXCAVATION TO <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. VERTICAL: N/A <br /> SHEET: D-04 <br />