Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 11/18/2021 11/18/2021 PERMIT EXTENSION I CINDY BERGSMA I APPROVAL <br /> Notes: <br /> Good morning Cindy, <br /> Would I be able to get an extension on 2 of my permits? If so,these 2 are below with some brief notes as to why I am requesting these extensions. <br /> PW1903-009...conduit and handholes have been placed...need to place cable <br /> PW1903-010...SNOPUD placed new poles(on Glenwood Ave)and I need to see if we can attach to the new ones,since our original approval from them <br /> was to attach to the old poles. <br /> Thanks for considering this Cindy and I hope you have a nice day. <br /> Brad <br /> Brad Landis <br /> Sr.Engr Spec-Outside Plant <br /> Network Engineering&Operations-Pacific Northwest <br /> Verizon Business Group <br /> 425-229-3123 <br /> PERMIT EXTENSION EXTENSION <br /> 5/2/2022 5/2/2022 (REASON AUDREY ARBOW APPROVED eTRAKiT Inspection Request <br /> REQUIRED) <br /> Notes: <br /> 4/29/2022 3:34 PM brad landis <br /> Contractor placing cable 1st week in May then will need to splice <br /> Contact Name:brad landis <br /> Site Address:6121 BEVERLY LN <br /> Phone:4252293123 <br /> e-Mail:brad.landis@verizon.com <br /> PW 25-SITE APPRVD-PERMIT <br /> 10/20/2022 10/20/2022 FINAL/PERMIT JIM KNAPPERT FINAL eTRAKiT Inspection Request <br /> CLOSE OUT <br /> Notes: <br /> 10/18/2022 3:43 PM MASTEC NORTH AMERICA INC <br /> Contact Name:Casey Christlieb <br /> Site Address:6121 BEVERLY LN <br /> Phone:5098230965 <br /> e-Mail:casey.christlieb@mastec.com <br /> I <br /> Printed: Monday,07 October,2024 2 of 2 rk <br /> SUPERION <br />