My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 COLUMBIA AVE 2024-11-08
>
Address Records
>
COLUMBIA AVE
>
2318
>
2318 COLUMBIA AVE 2024-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 8:53:49 AM
Creation date
10/7/2024 10:40:56 AM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MCI METRO GENERAL NOTES AND REQUIREMENTS verizoal <br /> PROJECT: <br /> PROJECT C NUMBER <br /> 1801AVAO.21 ROW EVT 1017 <br /> CONSTRUCTION NOTES FIBER OPTIC CABLE UNCOVERING SYSTEM CITYNOFEVERETT <br /> 2530 MADISON ST, <br /> EVERETT,WA <br /> 1. ALL CONDUIT WILL BE 4"ID SCHEDULE 40(i.e.PVC OR BSP/GSP,MANUFACTURED SPLIT PVC OR SPLIT BSP/GSP),UNLESS SPECIFIED 1. THE TITLE OF THIS PROGRAM,F.O.C.U.S.,AN ACRONYM FOR"FIBER OPTIC CABLE UNCOVERING SYSTEM,"WAS SELECTED W <br /> OTHERWISE. TO REMIND EVERYONE INVOLVED WITH WORKING NEAR MCI'S ACTIVE FIBER OPTIC SYSTEMS TO FOCUS ON PROTECTING U) <br /> THE FACILITIES. IF,DURING THE COURSE OF THE PROJECT,YOU NOTICE ANY ACTIVITY WHICH MAY JEOPARDIZE THE a Q <br /> MCI OSP FACILITIES,IT IS YOUR DUTY TO STOP THE WORK AND RE-F.O.C.U.S. O Z = <br /> 2. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY.SEE CONTACT SHEET FOR CONTACT NAME AND TELEPHONE NUMBER. V W z0 <br /> vi <br /> 2. F.O.C.U.S.RULES MUST BE FOLLOWED ON ALL MCI PROJECTS INVOLVING WORK ON OR NEAR MCI OSP FACILITIES. Lu U Q <br /> 3. ALL UNDERGROUND OBSTRUCTIONS,WHEN LOCATED,WILL REQUIRE THE PLACEMENT OF A BURIED CABLE MARKER AND THE <br /> SAFETY IS MCI'S NUMBER ONE PRIORITY;EVERYONE MUST REFRAIN FROM UNSAFE AND IMPROPER PRACTICES. IV 5 <br /> PLACEMENT OF 4'MANUFACTURED SPLIT PVC,BSP/GSP OVER OR UNDER EACH OBSTRUCTION. 0 Lu V7 W z <br /> 3. REVIEW OF F.O.C.U.S.IS MANDATORY AT EVERY PRE-BID,PRE-CONSRUCTION SITE MEETING AND DAILY TAILGATE 4-1Z F <br /> 4. SHORING MAY BE REQUIRED AND SHALL COMPLY WITH O.S.H.A.STANDARDS. <br /> MEETING. F.O.C.U.S.DISCUSSION MUST INCLUDE SITE-SPECIFIC HISTORY,UNIQUE PROBLEMS,FACILITY 4! z <br /> O O W o <br /> C <br /> CONFIGURATIONS THAT MAY BE ENCOUNTERED,AND PAST ERRORS. "THOSE WHO DO NOT LEARN FROM HISTORY ARE C <br /> U <br /> DOOMED TO REPEAT IT." DO NOT LET THIS HAPPEN TO YOU. 01 Z Lu O <br /> 5. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 42"MINIMUM COVER UNLESS SPECIFIED OTHERWISE ON THE CONSTRUCTION UUC 2i co Q o <br /> DRAWINGS. C z d <br /> 4. ANY WORK NEAR OR REQUIRING HANDLING OF MCI OUTSIDE PLANT FACILITIES CAN ONLY BE PERFORMED WITH AN MCI LL 0 p <br /> EMPLOYEE OR CONTRACT REPRESENTATIVE PRESENT-THIS MEANS OUT OF HIS OR HER VEHICLE AND DIRECTLY cr <br /> 6. MECHANICAL PROTECTION SHALL BE REQUIRED ANYTIME A 36"MINIMUM COVER IS UNOBTAINABLE UNLESS SPECIFIED OTHERWISE MONITORING THE SYSTEM. THE REPRESENTATIVE MUST HAVE A PROPERLY OPERATING CABLE LOCATOR CHECKED FOR N .m � <br /> ON THE CONSTRUCTION DRAWINGS. ACCURACY EVERY DAY PRIOR TO COMMENCEMENT OF WORK(COMPARISON OF LINE AND DEPTH READINGS TO ACTUAL u) ■�■ Lu <br /> LINE AND DEPTH OF THE CABLE). Lu 5 < <br /> U O <br /> 7. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM 38.2"RADIUS UNLESS SPECIFIED OTHERWISE.ALL SPLIT Q <br /> CONDUIT BENDS AND SOLID PVC BENDS SHALL REQUIRE CONCRETE ENCASEMENT,UNLESS SPECIFIED OTHERWISE. 5. LOCATE AND POTHOLE REQUIREMENTS: <br /> • PRIOR TO ANY EXCAVATION,THE MCI EMPLOYEE OR CONTRACT REPRESENTATIVE MUST VERIFY THE INITIAL <br /> LOCATE MARKS COMPLETED BY MCI OPERATIONS. DO NOT TRUST LOCATE RESULTS COMPLETED BY OTHERS! <br /> 8. OPERATIONS PERSONNEL TO BE CONTACTED BY THE CONTRACTOR 48 HOURS PRIOR TO CONSTRUCTION.SEE CONTACT SHEET THE MCI OR CONTRACT REPRESENTATIVE MUST LOCATE THE CABLE RUNNING LINE BY MAKING AT LEAST FORESITE <br /> FOR CONTACT NAME AND TELEPHONE NUMBER. ONE PASS IN EACH DIRECTION. LOCATE RESULTS MUST THEN BE COMPARED WITH PREVIOUS MARKS AND <br /> THE AS-BUILTS. group <br /> 9. ALL STATIONING IS BASED ON AS-BUILT INFORMATION,THERFORE SOME VARIANCE SHOULD BE ANTICIPATED.ADJUST AS NEEDED. SoCOE�a:Ch..St. "'I 31.::7'"e <br /> 0 1 336.007.BOB6 <br /> • IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 3 FEET OF THE CABLE,THE CABLE Suica— f 133,.007.6026 <br /> ..in,TX 707. <br /> ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTED BY MARKER FLAGS PLACED <br /> EVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE(ALL POTHOLES MUST BE COMPLETED BY HAND <br /> 10.RAILROAD COMMUNICATION AND SIGNAL CABLES TO BE LOCATED PRIOR TO THE CONSTRUCTION ACTIVITY.RAILROAD TO BE GIVEN DIGGING OR VACUUM EXCAVATION)A MINIMUM OF EVERY 15 FT.,THEN EXPOSE THE ENTIRE LENGTH OF THE <br /> 48 HOURS NOTICE PRIOR TO CONSTRUCTION. CABLE BY HAND DIGGING OR VACUUM EXCAVATION. <br /> 11.ALL BURIED CABLE MARKER POSTS AND HARDWARE PLACED AND/OR REMOVED ON ALL NEW AND EXISTING ROUTES SHALL BE • IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 5 FEET(BUT NOT CLOSER THAN 3 FEET) <br /> IMPLEMENTED AS FOLLOWS. OF THE CABLE,THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTED <br /> BY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE THE CABLE A <br /> • ON THOSE ROUTES THAT ARE CONSIDERED TO BE IN A NORTH TO SOUTH GEOGRAPHICAL ORIENTATION,THE SOUTHERN-MOST MINUMUM OF EVERY 15 FT. <br /> SIGN AND POST SHOULD BE REMOVED. <br /> FOR NEW ROUTES BEING CONSTRUCTED,ONE SIGN POST WILL BE PLACED AT THE NORTH END OF EACH HANDHOLE. • IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 15 FEET(BUT NOT CLOSER THAN 5 FEET) <br /> OF THE CABLE,THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTED <br /> BY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE THE CABLE A <br /> • ON THOSE ROUTES THAT ARE CONSIDERED TO BE IN AN EAST TO WEST GEOGRAPHICAL ORIENTATION,THE WESTERN-MOST SIGN MINIMUM OF EVERY 30 FT. <br /> AND POST SHOULD BE REMOVED. <br /> FOR NEW ROUTES BEING CONSTRUCTED,ONE SIGN POST WILL BE PLACED AT THE EAST END OF THE EACH HANDHOLE. ENGINEER: AB <br /> • THE CABLE WILL ALSO BE POTHOLED AT ANY CHANGE IN THE RUNNING LINE OF MORE THAN 1 FT.IN ANY <br /> DIRECTION,ANYTIME THE ACCURACY OF THE ELECTRONIC LOCATE IS QUESTIONED,OR THE MARKED RUNNING DRAWN BY: Ps <br /> LINE DOES NOT MATCH THE AS-BUILTS. REVISIONS <br /> n^TF DESCRIPTION INITIAL <br /> 6. EXPOSING REQUIREMENTS: <br /> • NO MECHANICAL EXCAVATION WITHIN 3 FT.OF OSP FACILITIES WILL BE ALLOWED UNLESS THE FACILITIES <br /> HAVE FIRST BEEN PROPERLY LOCATED,POTHOLED,POSITIVELY IDENTIFIED,CONTINUOUSLY EXPOSED BY HAND <br /> DIGGING OR VACUUM EXCAVATION,AND THE FACILITIES ARE CLEARLY VISIBLE. <br /> • IN ADDITION,MECHANICAL EXCAVATION WITHIN 3 FT.OF OSP FACILITIES REQUIRES ON-SITE PRIOR APPROVAL <br /> FROM MCI'S EMPLOYEE OR CONTRACT REPRESENTATIVE. <br /> EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT <br /> N THE <br /> 7. PLEASE REFER TO THE LATEST EDITION OF THE MCI OSP HANDBOOK FOR ADDITIONAL DETAILS. KNOW IT AND PEOPENTYY OFNMCI COMMUNICATIONS ERVCES,S SHALL MCI BOT <br /> BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT B <br /> FOLLOW IT. REPRODUCED, COPIED, OR USED FOR ANY PURPOSE <br /> WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> SCALE <br /> HORIZONTAL: N/A <br /> VERTICAL: N/A <br /> SHEET: D-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.