Laserfiche WebLink
MCI CONSTRUCTION DETAILS/TYPICALS verizonN' <br /> TYPICAL OPEN TRENCH DETAIL JEe P.L.D. PROJECT: <br /> 1801AVAO.21 ROW EVT 1017 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY OFEVERETT <br /> 2530 MZSON ST, <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH & PLACE CONDUIT TRENCH & PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> w <br /> 12"MIN. co <br /> 6"MIN. EXISTING GRADE EXISTING GRADE < <br /> O <br /> 2 Z <br /> 1 r ' O OL z <br /> CONDUIT AS SPECIFIE II I BURIED CABLE w v H U' F <br /> E/W ANY NUMBER OF 12"MIN.BELOW 12"MIN.BELOW V U <br /> I <br /> INNERDUCTS A FINISHED GRAD <br /> ND/OR FINISHED GRADE E j <br /> HDPE's,AS SPECIFIED BURIED CABLE MARKER TAPE <br /> MARKER TAPE 0 U) W z <br /> &FIBER OPTIC CABLE L t V) z <br /> COMPACT BACKFILL IN 6"LAYERS + <br /> -- RI MIS„ COMPACT BACKFILLS IN A WITH ROCK FREE MATERIAL.2-SACK N p OU W o <br /> COVER 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAY BE E v; � z <br /> FREE MATERIAL REQUIRED BY THE LOCAL GOV. V) Z W o <br /> EOP° AGENCY VCID Q <br /> ..: Z a W z <br /> w CONCRETE OR. <br /> CONDUIT AS SPECIFIED E/W <br /> ASPHALT ROAD V) V) w <br /> ¢ + ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED E/W N ■ ■ H o <br /> > AND/OR HDPE's,AS SPECIFIED ANY NUMBER OF INNERDUCTS w ■ Q z <br /> &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIED u <br /> X O <br /> &FIBER OPTIC CABLE Q <br /> CONDUIT AS SPECIFIED <br /> RAW E/W PULL ROPE <br /> SAW CUT AND 3 3 FORESITE <br /> REMOVE 2'MIN. <br /> Fo resne Group.Inc. w I www re-Inc nel <br /> 3000 E Cesar CM1avez St. o 334.86].6064 <br /> Suite400TX f334.86].6024 <br /> Austin, ]6]02 <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> \ EQUALLY <br /> / ENGINEER: AB <br /> FILLED BAGS DRAWN BY: PS <br /> \ \ REVISIONS <br /> \ ` FILLED BAGS DATE DESCRIPTION INITIAL <br /> A / CLEAN BACKFILL <br /> COVER <br /> \ TOE OF BANK \ <br /> NOTES: <br /> CONDUIT AS SPECIFIED \1. INTERLOCK BAGS INTO TRENCH,ONE FX°FPT AS MAY BE OTHERWISE PROVIDED BY°°"TRACT <br /> / THE <br /> E/W ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE PESE DRAWINGS AND COMMUNICATIONS ONS <br /> BOTH <br /> PROPERTY OF MCI COMMUNICATIONS SERVICES,INC..BOT <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE BE <br /> aEPaooucEo,IcoPeoT OR USED FOR SHALLNURPOs <br /> \ ` HDPE's,AS SPECIFIED& ` THIRD LAYER PARALLEL,ETC..TAMP THE WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE SCALE <br /> ` \ \ THE BAGS SO THEY WILL CONFORM TO <br /> THE PREDISTURBED BANK. <br /> NOTE: 2.BAGS WILL EXTEND HE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE / AND DEPTH OF EXCAVATION TO <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. VERTICAL: N/A <br /> SHEET: D-04 <br />