Laserfiche WebLink
MCI CONSTRUCTION DETAILS/TYPICALS verizon,/ <br /> TYPICAL OPEN TRENCH DETAIL Ee P.-E. PROJECT: <br /> 1801AVAO.10 ROW EVT 1137 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY OFEVERETT <br /> 9610 Li AVE SE <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH & PLACE CONDUIT TRENCH & PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> 12"MIN. <br /> 6"MIN. EXISTING GRADE EXISTING GRADE � <br /> z <br /> U � W Z <br /> CONDUIT AS SPECIFIE I I w H <br /> E/W ANY NUMBER OF 12"MIN.BELOW 12"MIN.BEJADEJ <br /> V U Q <br /> I I BURIED CABLE <br /> INNERDUCTS AND/OR FINISHED GRADE FINISHED G j _ <br /> HDPE's,AS SPECIFIED BURIED CABLE MARKER TAPE <br /> MARKER TAPE 0 w ~ <br /> &FIBER OPTIC CABLE v z <br /> COMPACT BACKFILL IN 6"LAYERS 4� z z Z) � <br /> -- R/ MM2" COMPACT BACKFILLS IN A WITH ROCK FREE MATERIAL.2-SACK N O OU � o <br /> COVER 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAY BE E v; c z <br /> FREE MATERIAL REQUIRED BY THE LOCAL GOV. `—^ z W O <br /> EOP° AGENCY VCC Q <br /> ..: C Z d N z <br /> Q W LC) O0 <br /> .mow. CONCRETE ❑R <br /> CONDUIT AS SPECIFIED E/W <br /> ASPHALT ROAD vi w <br /> :: 4. ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED E/W N H o <br /> > ; AND/OR HDPE's,AS SPECIFIED ANY NUMBER OF INNERDUCTS u O = <br /> &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIED U <br /> EOP &FIBER OPTIC CABLE Q <br /> CONDUIT AS SPECIF <br /> RAW E/W PULL ROPE <br /> SAW CUT AND 3 > FORESITE <br /> REMOVE 2'MIN. <br /> Ro rest,Group.Inc. w www fg-Inc net <br /> 3000 E Cesar CM1avez St. o 334.86].6064 <br /> -i Am,00 f 334.86].6024 <br /> Bustin,TX]6]02 <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> \ EQUALLY <br /> / ENGINEER: AB <br /> FILLED BAGS DRAWN BY: NIL <br /> \ \ REVISIONS <br /> \ FILLED BAGS DATE DESCRIPTION INITIAL <br /> A / CLEAN BACKFILL <br /> COVER <br /> \ TOE OF BANK \ <br /> NOTES: <br /> CONDUIT AS SPECIFIED \1. INTERLOCK BAGS INTO TRENCH,ONE EXCEPT AS MAY BE OTHERWISE PROVIDED CONTRACT <br /> / THE <br /> E/W ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE THESE DRAWINGS ANOSGECGATIO ESERVIONS E,INCREM BOTH <br /> PROPERTY ISSUED <br /> MCI COMMUNICATIONS SERVICES,INC..BOT <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE BEING DUCED(COPIED, OR"USED°FORD ANYBHA T T B <br /> \ ` HDPE's,AS SPECIFIED& ` THIRD LAYER PARALLEL,ETC..TAMP THE WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE SCALE <br /> ` \ \ THE BAGS SO THEY WILL CONFORM TO <br /> THE PREDISTURBED BANK. <br /> NOTE: 2.BAGS WILL EXTEND HE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE / AND DEPTH OF EXCAVATION TO <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. VERTICAL: N/A <br /> SHEET: D-04 <br />