Laserfiche WebLink
NORTH <br /> verizon,' <br /> PROJECT: <br /> _ _ PROJECT IDNDMBER. <br /> 1807BDIN.6 ROWI EVT 0956 <br /> PERM TTING ENTITY <br /> __ I Pole# 131190 EVERETT <br /> L Existing Proposed P—ECT LOCATION <br /> POA Height Height BACKHAUL <br /> ' Neutral 30'2" EVERETT,WA <br /> PWR Guy 29'8"PWR Guy 29'8" C-01.1 <br /> PWR Riser 29'7" <br /> Drip Loop 28'11" LU <br /> I Frontier 22'2" Z IX <br /> MRE Notes O O <br /> 1= U <br /> I I N Q U) <br /> I LU <br /> w <br /> Pole# 65765 I ZO W <br /> POA <br /> Existing Proposed I Z g O <br /> / I Height Height I O :j w <br /> Primary Cross Arm 69'8" I I Z u) O <br /> ' PWR Guy 68'10" Z z ' <br /> \ I I M E Notes 'S" I J ¢ Z <br /> a <br /> LU uj <br /> a < <br /> J I Pole# 65764 I I U F <br /> \� CASCADE VIEW POA Existing Proposed I _ 0 I j <br /> i Height Height I I W <br /> Secondary Cross I > <br /> r_ Arm 57 7" I I � W <br /> / I co <br /> / PWR Guy 36'6" I <br /> Frontier 34'9" <br /> Frontier 3 30' FORESITE <br /> Comcast 30 I <br /> group <br /> 4100 I Frontier 20'5" Dl�a�cro"P,In s_I <br /> SOUTH MRE Notes I Sono „cn..e:sc oi33a�. <br /> Austin,T%JSJOl <br /> AVENUE I <br /> EVERETT I I N Pole# 65762 <br /> IPOA Existing Proposed I <br /> / 2J Height Height <br /> Secondary 48'11" <br /> Q I Drip Loop 48' I <br /> W I Frontier 36' <br /> / z <br /> z Comcast 32'2" <br /> a I Frontier 22'9" <br /> y/ I a Frontier 22'6" <br /> Frontier 21' <br /> IM/ 4201 MRE Notes/ = <br /> SOUTH � <br /> 4TH <br /> AVENUE 4126 13 <br /> I <br /> i DATE: 04/12/2019 <br /> co ENGINEER: F.Colon <br /> EVERETT SOUTH I o <br /> 3RD I N <br /> AVENUE Pole# 65761 DRAWN BY: S.Dickson <br /> EVERETT I POA Existing Proposed REVISIONS <br /> Hei ht Height DATE DESCRIPTION INITIAL <br /> Neutral 38'7" <br /> Frontier 33'8" Know what's below. <br /> Call before you dig. <br /> 4202 I Comcast 29'10" <br /> SOUTH Frontier 28'8" <br /> 3RD 4205 Frontier 2T 8n LEGEND: <br /> AVENUE SOUTH PROPOSED STRAND <br /> r207EVERETT 3RDMRE NotesUTH I AVENUE STRAND PROPOSED IN <br /> 4TH I EVERETT SEPARATE PACKAGE <br /> AVENUE <br /> POLE FOR EVALUATION <br /> EVERETT I EXCEPT AS MAY BE OTHERWISE PROVIDED I CONTRACT w THESE DRAWINGS AND SPECIFICATIONS SHALL <br /> REMAIN THE <br /> PROPERTY OF MCI COMMUNICATIONS SERVICES,INC..BOB <br /> ® BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT <br /> POLE PROPOSED IN REPRODUCED, COPIED, OR USED FOR ANY PURPOS <br /> I W SEPARATE PACKAGE WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> PROPOSEDANCHOR SCALE <br /> ANCHORI HORIZONTAL: 1"=100' <br /> l SEPARATE <br /> PROPOSED IN <br /> /'► J SEPARATE PACKAGE VERTICAL: N/A <br /> J C-02 — RIGHT OF WAY(ROW) <br /> I EDGE OF PAVEMENT(EDP) SHEET: C-01 <br /> PARCELS <br />