Laserfiche WebLink
MCI CONSTRUCTION DETAILS/TYPICALS verizon,/ <br /> TYPICAL OPEN TRENCH DETAIL Ee P.-E. PROJECT: <br /> 1801AVAO.6 ROW EVT 1412 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY OFEVERETT <br /> 30 EAST CASINO RD, <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH & PLACE CONDUIT TRENCH & PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> 12"MIN. <br /> 6"MIN. EXISTING GRADE EXISTING GRADE 0 U) <br /> z <br /> U p Q z <br /> CONDUIT AS SPECIFIE I I w H a- <br /> 12"MIN.BELOW U <br /> E/W ANY NUMBER OF I I 12"MIN.BELOW FINISHED GRADE BURIED CABLE V A \ Ur <br /> INNERDUCTS AND/OR FINISHED GRADE BURIED CABLE MARKER TAPE > a/ <br /> HDPE's,AS SPECIFIED MARKER TAPE 0 w ~ <br /> &FIBER OPTIC CABLE � z I. z <br /> COMPACT BACKFILL IN 6"LAYERS 4 <br /> -- R/ Mltt COMPACT BACKFILLS IN A WITH ROCK FREE MATERIAL.2-SACK p OU W o <br /> COVER 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAY BE E v) � z <br /> FREE MATERIAL REQUIRED BY THE LOCAL GOV. `v) z LU a <br /> EOP° AGENCY V Q > <br /> ..: .' � Z � d W z <br /> o <br /> w Lu <br /> CONCRETE OR. Q_ <br /> CONDUIT AS SPECIFIED E/W <br /> ASPHALT ROAD V) � w <br /> ¢ + ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED E/W ut m I- <br /> > =" '. ; AND/OR HDPE's,AS SPECIFIED ANY NUMBER OF INNERDUCTS w O z <br /> &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIED u O <br /> EOP " X &FIBER OPTIC CABLE Q Q <br /> CONDUIT AS SPECIFIED U <br /> RAW E/W PULL ROPE <br /> SAW CUT AND 3 3 FORESITE <br /> REMOVE 2'MIN. <br /> Ro rest,Group.Inc. w www fg-Inc net <br /> 3000 E Cesar CM1avez St. o 334.86].6064 <br /> -i Am,00 f 334.86].6024 <br /> Bustin,TX]6]02 <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> \ EQUALLY <br /> / ENGINEER: AB <br /> FILLED BAGS DRAWN BY: AS <br /> \ \ REVISIONS <br /> \ FILLED BAGS DATE DESCRIPTION INITIAL <br /> A / CLEAN BACKFILL <br /> COVER <br /> \ TOE OF BANK \ <br /> NOTES: <br /> CONDUIT AS SPECIFIED \1. INTERLOCK BAGS INTO TRENCH,ONE EXCEPT AS MAY BE OTHERWISE PROVIDED CONTRACT <br /> / THE <br /> E/W ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE THESE PROPERTY <br /> FMCINGE ANOSGECIATIONE SPECIFICATIONS BOTH <br /> GROG ISS ISSUED <br /> MCI COMMUNICATIONS SERVICES,INC..BOT <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE BEING DUCED(COPIED, OR"USED°FORD BHA TNOT <br /> \ ` HDPE's,AS SPECIFIED& ` THIRD LAYER PARALLEL,ETC..TAMP THE WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE SCALE <br /> ` \ \ THE BAGS SO THEY WILL CONFORM TO <br /> THE PREDISTURBED BANK. <br /> NOTE: 2.BAGS WILL EXTEND HE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE / AND DEPTH OF EXCAVATION TO <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. VERTICAL: N/A <br /> SHEET: D-04 <br />