Laserfiche WebLink
MCI CONSTRUCTION DETAILS/TYPICALS verizon✓ <br /> TYPICAL OPEN TRENCH DETAIL 1...PROJECT: <br /> 1801AVAO.5 ROW EW 1493 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY"OF EVERETT <br /> 2600 100TH ST.SW, <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH&PLACE CONDUIT TRENCH&PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> 6"MIN. EXISTING GRADE 12"MIN. EXISTING GRADE W <br /> O Z° <br /> Q <br /> v a <br /> CONDUIT AS SPECIFIE I I '�+ H o <br /> ENV ANY NUMBER OF 12"MIN.BELOW TdINISHED <br /> 2"MIN.BELOW (D <br /> I I BURIED CABLEINNERDUCTSAND/OR FINISHED GRADE GRADE j <br /> BURIED CABLE MARKER TAPE <br /> HDPE's,AS SPECIFIED MARKER TAPE O w y FF <br /> 8 FIBER OPTIC CABLE COMPACT BACKFILL IN 6"LAYERS ++ Z Z W <br /> -- R/ MIS„ COMPACT BACKFILLS IN q WITH ROCK FREE MATERIAL.2-SACK N O OO o <br /> COVER 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAY BE E = r W <br /> FREE MATERIAL REQUIRED BY THE LOCAL GOV. Z > o <br /> �qP' AGENCY U N Al' < W z <br /> CONCRETE OR:�. 0 J <br /> CONDUIT AS SPECIFIED ENV R W <br /> rc 'ASPHALT RDAD� YYY N <br /> ¢ � • �� ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED ENJ W H LL <br /> z. <br /> > ' AN HDPE's,AS SPECIFIEDL ANY NUMBER OF INNERDUCTS O • 0 W <br /> • &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIED <br /> •EOP`•' ` &FIBER OPTIC CABLE Q Q <br /> CONDUIT AS SPECIFIED d <br /> RSV/ ENV PULL ROPE <br /> SAW CUT AND 3 3 FORESITE <br /> REMOVE 2'MIN. group <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> EQUALLY <br /> ENGINEER: AB <br /> FILLED BAGS DRAWN BY: AS <br /> REVISIONS <br /> DATE DESCRIPTION INITII <br /> FILLED BAGS <br /> A CLEAN BACKFILL <br /> COVER <br /> TOE OF BANK <br /> NOTES: <br /> CONDUIT AS SPECIFIED 1.INTERLOCK BAGS INTO TRENCH,ONE <br /> ENV ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE <br /> HDPE's,AS SPECIFIED& THIRD LAYER PARALLEL,ETC..TAMP THE <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE <br /> THE BAGS SO THEY WILL CONFORM TO SCALE <br /> NOTE: 2.BAGS WILL EXTEND THE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE AND DEPTH OF EXCAVATION TO VERTICAL: N/A <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. <br /> SHEET:0-04 <br />