My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 10/7/2024 Change Order 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 10/7/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:24:28 AM
Creation date
10/8/2024 9:22:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
10/7/2024
Council Approval Date
10/2/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0004489
Total Compensation
$289,746.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 8/28/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WFP Emergency Generator - IMCO General Construction - Loc 2 Added Demo and Louver Removal <br />20.00 <br />NA <br />HOURS RATE HOURS RATE <br />59.0 87.264 5148.58 <br />50.0 77.407 3870.35 <br />3.0 85.503 256.51 <br />3.0 62.38 187.13 <br />9462.56 <br />2744.14 <br />12206.71 <br />LS 1.0 3596.97 <br />3596.97 <br />755.36 <br />4352.33 <br />IN USE AMOUNT <br />61.0 EST 3855.20 <br />61.0 EST 8222.19 <br />61.0 EST 439.81 <br />55.0 EST 1690.15 <br />61.0 EST 436.15 <br />14643.50 <br />0.00 <br />3075.14 <br />17718.64 <br />AMOUNT <br />1260.00 <br />1260.00 <br />151.20 <br />1411.20 <br />35688.87TOTAL $ <br />TOTAL SUBCONTRACTOR $ <br />12% MARKUP FOR FORCE ACCOUNT SUBCONTRACT <br />SUBTOTAL EQUIPMENT $ <br />TR2302 2019 Load Trail 83x14 Low P Utility Trailers 7.15 <br />QTYUNIT UNIT PRICE <br />HR <br />NAME DESCRIPTION <br />Aqualis Vacuum Truck and Operator 4.50 280.00 <br />Subcontractor <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME <br />21% MARKUP FOR FORCE ACCOUNT MATERIALS <br />SUBTOTAL MATERIALS $ <br />21% MARKUP FOR FORCE ACCOUNT EQUIPMENT <br />SUBTOTAL EQUIPMENT $ <br />Light Duty Truck <br />DESCRIPTION <br />EX0460 2019 1221 Yanmar VIO50-6 Compact Excavator <br />FL0533 2013 Genie 8000# Reach Lift Truck <br />YEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />TOTAL EQUIPMENT RENTAL TAX $ <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional) <br />LABOR <br />SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />TOTAL EQUIPMENT $ <br />IMCO / Mitchell Sorestad City of Everett / Bill Fisher <br />HR0107 2013 Cat H65 Mini Breaker Hydraulic Impact Breakers <br />ST0296 2022 Ford F450 <br />TOTAL LABOR $ <br />TOTAL MATERIALS $ <br />29% MARKUP FOR FORCE ACCOUNT LABOR <br />SUBTOTAL LABOR $ <br />Carpenter <br />Back01-15 <br />UNIT QTY PRICE <br />3596.97 <br />DESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />See the attached spreadsheet <br />James Placek <br />Operator Foreman <br />NAME <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#:WFP Emergency Generator <br />Tuesday, February 28, 2023 <br />TRADE/CLASSIFICATION AMOUNT <br />Laborer <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer <br />Complete the added concrete demo and louver removal at location 2.Description of Work: <br />CONTRACTOR PERFORMING <br />WORK: <br />REPORTED BY: <br />IMCO <br />Colbi Bertrand <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />30.73 <br />63.20 <br />134.79 <br />7.21 <br />Corey Davis <br />Sam King <br />Cory Eddings
The URL can be used to link to this page
Your browser does not support the video tag.