My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 10/7/2024 Change Order 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 10/7/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:24:28 AM
Creation date
10/8/2024 9:22:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
10/7/2024
Council Approval Date
10/2/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0004489
Total Compensation
$289,746.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 8/28/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
All material herein © 2003-2022 Randall-Reilly All rights reserved.Page 1 of 1 <br />September 27, 2022 <br />8000.0 lbsBase Capacity 99.0 hpHorsepower <br />528.0 inMaximum Lift Height 324.0 inMaximum Reach <br />DieselPower Mode <br />www.equipmentwatch.com <br />All prices shown in US dollars ($) <br />Adjustments for FL0534 in Active 2022 <br />Genie GTH-844 <br />Telescoping Boom Rough Terrain Lift Trucks <br />Size Class: <br />3.6 - 3.9 MTons <br />Weight: <br />22320 lbs <br />Configuration for GTH-844 <br />Blue Book Rates <br />** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. <br />Ownership Costs Estimated Operating <br />Costs <br />FHWA Rate** <br />Monthly Weekly Daily Hourly Hourly Hourly <br />Published Rates USD $13,565.00 USD $3,800.00 USD $950.00 USD $145.00 USD $54.33 USD $131.40 <br />Adjustments <br />Region ( Washington: <br />106.4%) <br />USD $868.16 USD $243.20 USD $60.80 USD $9.28 <br />Model Year (2014: 98.11%)(USD $272.83)(USD $76.43)(USD $19.11)(USD $2.92) <br />Adjusted Hourly Ownership <br />Cost (100%) <br />---- <br />Hourly Operating Cost (100%)- <br />Total:USD $14,160.33 USD $3,966.77 USD $991.69 USD $151.36 USD $54.33 USD $134.79 <br />Non-Active Use Rates Hourly <br />Standby Rate USD $40.23 <br />Idling Rate USD $96.33 <br />Rate Element Allocation <br />Element Percentage Value <br />Depreciation (ownership)22%USD $2,984.30/mo <br />Overhaul (ownership)62%USD $8,410.30/mo <br />CFC (ownership)4%USD $542.60/mo <br />Indirect (ownership)12%USD $1,627.80/mo <br />Fuel (operating) @ USD 5.70 29%USD $15.87/hr <br />Revised Date: 3rd quarter 2022 <br />These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match Rental Rate Blue <br />Book Print. Visit the Cost Recovery Product Guide on our Help page for more information. <br />The equipment represented in this report has been exclusively prepared for CHRIS PEACH <br />(BB@IMCOCONSTRUCTION.COM)www.equipmentwatch.com
The URL can be used to link to this page
Your browser does not support the video tag.