Laserfiche WebLink
City of Everett 00 63 63 - 5 <br />Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> <br /> <br />00 63 63 - 5 CHANGE ORDER – AGREED (Addendum 1) <br /> <br /> <br /> <br />fees is now available and is documented in Work Change Directives 23, 24, 25, 28, 29, 30, 35, <br />36, 37, 38, 39, and 40. The combined total cost for these Work Change Directives is $345,151.93 <br />of which $172,922.28 was previously allocated and paid via Bid Item #104. The remaining <br />$172,229.65 is to be added to Bid Item #104 for a total bid item price of $345,151.93. Further <br />explanation of the bid item modification is shown under Work Change Directives 23, 24, 25, 28, <br />29, 30, 35, 36, 37, 38, 39, and 40 on the attached justification documents. No contract time <br />revisions are included in Change Order #2. An equitable adjustment to contract time will be <br />processed as part of a future Change Order #3 occurring at final project completion. <br />New Item #107 – New Power Study. Per electrical code, a revised power study was required for <br />the project when Location 3 Electrical System Upgrade was added to the project. City of Everett <br />staff have reviewed the scope and cost to revise the power study, negotiated a lump sum amount <br />of $11,119.25 to cover the cost, and issued Work Change Directive 27 authorizing the work. <br />Further justification is shown under Work Change Directive 27 on the attached justification <br />documents. <br />New Item #108 – Electrical Union Wage Increase #2. Given the project delays, the project <br />contractor is seeking additional funds to pay for increased hourly wages for electrical union <br />workers throughout the remainder of the project. The increased hourly wages coincide with a <br />regional electrical union wage increase. City of Everett staff have reviewed the wage increase <br />request and negotiated a lump sum amount of $6,389.79 to cover the electrical union wage <br />increase. Further justification for the wage increase request is shown under Work Change <br />Directive 42 on the attached justification documents. <br />