My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 10/7/2024 Change Order 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 10/7/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:24:28 AM
Creation date
10/8/2024 9:22:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
10/7/2024
Council Approval Date
10/2/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0004489
Total Compensation
$289,746.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 8/28/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
May 31, 2024 <br />Invoice#96952 <br />Our file#16144-1 <br />2116 Buchanan Loop <br />Ferndale, WA 98248 <br />Billing through 05/31/2024 <br />IMCO General Construction, Inc. <br />Phone: 206-287-9900 <br />Advisory <br />PROFESSIONAL SERVICES <br />05/03/2024 LKT Email with CJ re review of design build provisions 0.40 hrs.206.00 <br />05/06/2024 LKT (City of Everett) Continue to identify potential design <br />build language; Call with CJ and Mitchell re <br />background on deal and potential change order <br />0.60 hrs.309.00 <br />05/07/2024 LKT (City of Everett) Review draft change verification and <br />email with Mitchell <br />0.20 hrs.103.00 <br />05/09/2024 LKT (Bliss Dam - Release revisions) Review email from Jim <br />re release and revisions proposed; Email to Jim and call <br />re the same <br />0.40 hrs.206.00 <br />05/10/2024 LKT (Bliss Dam) Call with Jim re revisions and strategy re <br />approach <br />0.30 hrs.154.50 <br />05/13/2024 LKT (Simplot) Review email, background, and brief review <br />of comments from Fred; Respond to the same <br />0.30 hrs.154.50 <br />05/15/2024 LKT (Simplot) Review comments and proposed <br />revisions/issues; Draft language or alternatives; Email to <br />Fred; Call with Fred and Tyler; Follow up drafting <br />agreement <br />1.70 hrs.875.50 <br />05/16/2024 LKT (Simplot) Call with Simplot/IMCO re contract revisions 1.50 hrs.772.50 <br />Tax ID # 20-5640615Terms: Net 30 Days
The URL can be used to link to this page
Your browser does not support the video tag.