My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 10/7/2024 Change Order 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 10/7/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:24:28 AM
Creation date
10/8/2024 9:22:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
10/7/2024
Council Approval Date
10/2/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0004489
Total Compensation
$289,746.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 8/28/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WFP Emergency Generator - IMCO General Construction - Management Delay Costs December 2023 <br />20.00 <br />NA <br />HOURS RATE HOURS RATE <br />40.0 103.960 4158.40 <br />55.0 89.800 4939.00 <br />65.0 55.010 3575.65 <br />0.00 <br />0.00 <br />12673.05 <br />3675.18 <br />16348.23 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />IN USE AMOUNT <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />AMOUNT <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />16348.23TOTAL $ <br />TOTAL SUBCONTRACTOR $ <br />12% MARKUP FOR FORCE ACCOUNT SUBCONTRACT <br />SUBTOTAL EQUIPMENT $ <br />QTYUNIT UNIT PRICE <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME <br />TOTAL MATERIALS $ <br />NAME DESCRIPTION <br />21% MARKUP FOR FORCE ACCOUNT MATERIALS <br />SUBTOTAL MATERIALS $ <br />21% MARKUP FOR FORCE ACCOUNT EQUIPMENT <br />SUBTOTAL EQUIPMENT $ <br />DESCRIPTIONYEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />Subcontractor <br />TOTAL EQUIPMENT RENTAL TAX $ <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional) <br />LABOR <br />SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />TOTAL EQUIPMENT $ <br />IMCO / Mitchell Sorestad City of Everett / Bill Fisher <br />TOTAL LABOR $ <br />UNIT QTY PRICEDESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />29% MARKUP FOR FORCE ACCOUNT LABOR <br />SUBTOTAL LABOR $ <br />Project Manager <br />Field Engineer <br />NAME <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#:WFP Emergency Generator <br />Tuesday, February 28, 2023 <br />TRADE/CLASSIFICATION AMOUNT <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer <br />IMCO management costs due to project delays for December 2023.Description of Work: <br />CONTRACTOR PERFORMING <br />WORK: <br />REPORTED BY: <br />IMCO <br />Colbi Bertrand <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />James Janda <br />Mitchell Sorestad <br />Colbi Bertrand <br />Superintendent
The URL can be used to link to this page
Your browser does not support the video tag.