Laserfiche WebLink
BCE.COET.P.doc <br />September 5, 2024 <br />page | 3 <br /> <br /> <br /> <br />SCHEDULE AND BUDGET <br />We are prepared to proceed with our scope of services immediately upon receipt of your notice <br />to proceed (NTP), and we anticipate the following project milestones: <br /> <br />• NTP + Two days – Site reconnaissance complete, utility locate ticket requested <br />• NTP + Two weeks – Subsurface exploration program execution <br />• NTP + Four weeks – Draft design report issued <br /> <br />We estimate that our scope of work can be completed within the costs outlined below. All line <br />items are inclusive of travel expenses, where applicable. Our geotechnical scope of work will be <br />billed on a fixed fee basis. <br /> <br />Scope of Work Cost <br /> Field Preparation $ 450 <br />Site Reconnaissance $ 385 <br /> Subsurface Exploration $ 6,625 <br />Engineering Analysis $ 975 <br />Laboratory Testing $ 660 <br />Geotechnical Report $ 2,250 <br /> Estimated Total Cost $11,075 <br /> <br />CLOSURE <br /> We appreciate the opportunity to submit this proposal and look forward to its favorable <br />consideration. We consider our firm to be especially well qualified to complete this project. <br />Authorization to proceed may be indicated by returning one copy of the proposal signed in the <br />space provided below, or by providing a subcontractor agreement. <br /> <br />Yours very truly, <br /> GeoResources <br /> <br /> <br /> <br /> <br /> Seth T. Mattos, LEG <br /> Associate <br /> <br />STM/dc <br />Doc ID: BCE.COET.P.doc <br />Attachments: Terms and Conditions <br /> <br />