Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Unit be inspected today and approved.All framing is a proved OK to cover. <br /> BLDG 09-FIRE <br /> 7/9/2024 7/9/2024 STOPPING/BLOCKIN Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> G <br /> Notes: <br /> 6/25/2024 1:12 PM Chris Kiel <br /> B <br /> Contact Name:Chris Kiel <br /> Site Address:1610 106TH PL SW UNITS A,B <br /> Phone:4259235414 <br /> e-Mail:chrisklphomes@gmail.com <br /> 7/11/2024 7/11/2024 BLDG 12- <br /> INSULATION Matt Schreifels APPROVAL Unit B(Left side)See notes <br /> Notes: <br /> 6/25/2024 1:13 PM Chris Kiel <br /> Contact Name:Chris Kiel <br /> Site Address:1610 106TH PL SW UNITS A,B <br /> Phone:4259235414 <br /> e-Mail:chrisklphomes@gmail.com <br /> Exterior wall thermal insulation approved for unit B.Excludes blow in insulation in attic areas.to be inspected prior to building final. <br /> Excludes blow in insulation in attic area.To be inspected prior to building final inspection. <br /> 7/15/2024 7/15/2024 BLDG 10-DRYWALL Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> NAILING <br /> Notes: <br /> 6/25/2024 1:13 PM Chris Kiel <br /> B <br /> Contact Name:Chris Kiel <br /> Site Address:1610 106TH PL SW UNITS A,B <br /> Phone:4259235414 <br /> e-Mail:chrisklphomes@gmail.com <br /> 9/23/2024 9/23/2024 BLDG 12- Matt Schreifels APPROVAL unit A attic and under floor <br /> INSULATION <br /> Notes: <br /> 9/23/2024 9/23/2024 BLDG 12- Matt Schreifels APPROVAL unit b attic and under floor <br /> INSULATION <br /> Notes: <br /> 9/23/2024 9/23/2024 BLDG 16-FINAL Matt Schreifels NOT READY See notes <br /> Notes: <br /> 9/17/2024 8:58 AM Chris Kiel <br /> Contact Name:Chris Kiel <br /> Site Address:1610 106TH PL SW UNITS A,B <br /> Phone:4259235414 <br /> e-Mail:chrisklphomes@gmail.com <br /> I <br /> Printed:Thursday,03 October, 2024 6 of 7 rk <br /> SUPERION <br />