Laserfiche WebLink
Matchline `A' <br /> 1 BUFFER DATA 0) MINIMUM TAPER LENGTH = L(feet) Matchline `B' <br /> 350' W20-1 adod LONGITUDINAL BUFFER SPACE = B <br /> <D LANE POSTED SPEED(mph) <br /> WIDTH <br /> SPEED(MPH) 25 30 35 40 45 50 55 60 65 70 N) (feet) 25 30 35 40 45 50 55 60 65 70 <br /> LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 j 10 105 150 205 270 450 500 550 - - - <br /> 11 115 165 225 295 495 550 605 660 - RE <br /> 12 125 180 245 320 540 600 660 720 780 PR'To W3-4 <br /> DTOP <br /> ARROWBOARD to m <br /> rt <br /> TRAFFIC TO BE STOPPED <br /> W20-5R 3N"3"'�".'" cn D <br /> c° 10-15 MINUTES TO <br /> M TRANSFER O.H. WIRE <br /> `n W RAFFIC LIGHTS SET TO FLASHING RED 350' <br /> o m 102nd St SE 25 <br /> N N <br /> 100' Pvt <br /> 350' 1 °DI�3a =Ao <br /> '� <br /> MUM <br /> 28" 71b Q D� 4 too 100 <br /> 96th PI SE 25 0 0 o N o W20-7A <br /> f <br /> 100th St SE 30 200 200 D <br /> � °yD <br /> CID <br /> axa D <br /> a3x <br /> a < <br /> W4-2R =oo ® cn <br /> m <br /> oxo <br /> 200' R4 —— 41 C4 OAD W20-1 c <br /> WORK <br /> N W20-7A 200' AHEAD <br /> 0 <br /> GENERAL NOTES CONTACT INFO: <br /> 100th PI SE 25 ALL WORK TO BE PERFORMED DURING FIBE SOLUTIONS <br /> DAYTIME HOURS, UNLESS TRAFFIC PROJECT MANAGER <br /> 350' r VOLUMES OR MUNICIPALITY DICTATE TERRY CROMWELL <br /> O OTHERWISE 206.793.0637 <br /> N < moo <br /> °F° ALL SIGNS ARE 48"X48" BLACK ON TCS#010558 <br /> 100' C 100' 0 FLUORESCENT ORANGE UNLESS TYPE OF WORK:AERIAL <br /> OTHERWISE NOTED <br /> a 3 a N N WORK HOURS:M-F 8AM-5PM <br /> O O • TRAFFIC SHALL NOT BE STOPPED IN ANY <br /> v ONE DIRECTION FOR MORE THAN 10 <br /> 98th St SE 2r, D MINUTES <br /> IF • A PEDESTRIAN SPOTTER WILL BE USED AS \ /�i <br /> 350' NEEDED TO ACCOMMODATE PEDESTRIANS <br /> Matchline `A' THROUGH THE WORK ZONE <br /> • WORK AREA TO INCLUDE STAGING AREA <br /> Matchline `B' <br /> JOB#/PM# AGENCY PRIME CONTRACTOR TCP QUESTIONS CALL: MPH TAPER SIGN SPACING TAPER TANGENT <br /> 1132 EVERETT WA FORESITE 209-400-7075 „ CITY 35 245' 350' 35' 70' <br /> 7 PREPARED BY INITIALS I TA <br /> ....................................................................... ....................................... <br /> RISE <br /> SHEET# PROJECT LOCATION CITY RISE, INC S.P. SCALE V SHIFTTAPER = 1/2TAPER <br /> SHEET 2 19th Ave SE & 100th St SE DATE PREPARED NOT TO SCALE SHOULDER TAPER= 1/3TAPER <br /> 5/8/2019 WORK AREA <br />