Laserfiche WebLink
AIR BARRIER REQUIREMENT <br /> PER 2018 WASHINGTON STATE ENERGY CODE R402.4 A CONTINUOUS AIR BARRIER <br /> SHALL BE INSTALLED IN THE BUILDING ENVELOPE.EXTERIOR THERMAL ENVELOPE :L r <br /> CONTAINS A CONTINUOUS AIR BARRIER.BREAKS OR JOINTS IN THE AIR BARRIER SHALL <br /> BE SEALED.AIR PERMEABLE INSULATION SHALL NOT BE USED AS AS A SEALING <br /> MATERIAL. f <br /> PROVIDE BUILDING AIR LEAKAGE TESTING WITH APPROVED BLOWER DOOR PER C <br /> CEILING G.W.B.TAPED TO WALL INFORMATION BELOW.SUBMIT TESTING RESULTS TO JURISDICTION FOR APPROVAL. m <br /> G.W.B. �SEAL G.W.B <br /> Q <br /> OF DOOR&WINDOW PERIMETER BLOWER DOOR TEST <br /> OPENINGS II - = o. <br /> 2018 Washington State Energy Code(WSEC)section R402.4.1.2 requires air leakage testing for o <br /> SEAL G.W.B.TO TOP I I SEAL G.W.B.PERIMETER all new houses and additions.The requirement is met if the structure has a leakage rate of 5 air d +d <br /> PLATE AT ALL EXTERIOR OF DOOR&WINDOW changes per hour when depressurized with a blower door to 50 Pascals or less(5ACH50).A <br /> WALLS I I OPENINGS Pascal is a measurement of pressure.249 Pascals are equal to 1"of water column.The test must <br /> G.W.B.CAULKED TO TOP PLATE be performed using a Blower Door device which consists of a large fan,a frame and panel.A av,m <br /> manometer(pressure gauge)is used to read house and fan pressures. <br /> SHADED WSEC <br /> COMPONENTS states that the test may be performed at any time after rough in.All penetrations in the <br /> / I I I I building envelope must be sealed including those for utilities,plumbing, 'ventilation and <br /> INDICATE ELEMENTS I com <br /> IS, <br /> sh bustion appliances.The code also states that when requiretl by the building'official,the test w <br /> COMPRSall be conducted by an approved third party. <br /> NG THE N <br /> CONTINUOUS AIR I <br /> BARRIER ENCLOSURE I I To conduct the test: _ <br /> I I 1.Close all windows,doors and fireplace and stove doors. <br /> 2.Close all dampers including exhaust,intake,make-up air,backdraft and <br /> G.W.B.CAULKED TO BOTTOM PLATE I I I I I I flue dampers.Since you will be depressurizing the house,dampers in bath <br /> fans,etc.will be sucked closed during the test and will therefore not <br /> I I negatively affect the results. re 1 U <br /> r/ <br /> BOTTOM PLATE CAULKED OR GASKETED I I I I 3.Make sure plumbing traps am filled with water. <br /> TO SUBFLOOR/CONCRETE SLAB AT / I ( \ 4.Leave doors between heated areas open. <br /> SLAB ON GRADE CONDITIONS I / I I I 5.Open access hatches to conditioned attics and/or conditioned crawl <br /> spaces.Leave hatches closed if these are unconditioned areas. 6evkion saeauie <br /> 6.Seal exterior openings for continuously operating ventilation systems and <br /> RIM JOIST CAULKED,GLUED OR / I I heat recovery ventilators. <br /> GASKETED TO SUBFLOOR 7.Turn off heating and cooling systems but do not seal supply or return <br /> / / I registers. <br /> 8.Adjust all combustion appliances so that they do not turn on during the <br /> test. <br /> RIM JOIST CAULKED,GLUED OR I 9.Install the blower door in an exterior door opening and connect hoses from <br /> RIM JOIST <br /> A TOP PLATE the manometer to the blower door fan and the exterior pressure tap.See <br /> / I manufacturer's instructions for correct set-up. <br /> EA/ I SL G.W.B.TO FIRST 10.Depressurize the house to-50 Pascals. <br /> EA/ SL G.W.B.TO TOP STUD AT INTERIOR 11.Record the flow rate(with simple manometers,the fan pressure(Pa)is <br /> G.W.B.CAULKED TO TOP PLATE / PLATE WHEN ADJACENT I PARTIITIONS converted to.CF.2 using a flow table.Many digital manometers sold with <br /> / TO UNCONDITIONED I blower doors can automatically perform this conversion,and display <br /> ATTIC CFM5odimctly.)Consult your blower door and manometer manuals. <br /> // I You now must convert the flow rate(CFMw)to ACH5o. w <br /> // I Use the following formula: Cc <br /> ACH/ ACH 5o=(CFM w X 60)/Volume < <br /> QM <br /> SEAL G.W.B.TO SILL Where. W <br /> PLATE AT ALL EXTERIOR ACH 5o=Air Changes per Hour at-50 Pascals <br /> G.W.B.CAULKED TO BOTTOM PLATE WALLS SEAL ALONG INSIDE OF CFMso X 60=Converts Cubic Feet per Minute to Cubic Feet per <br /> BOTTOM OF FIRST STUD Hour Ir <br /> AT INTERIOR WALL OR Volume=Conditioned floor area of the housing unit multiplied by <br /> BOTTOM PLATE CAULKED OR GASKETED OLD BACK FIRST STUD the ceiling height <br /> TO SUBFLOOR/CONCRETE SLAB AT JI�A <br /> DRUN G.W.B. <br /> SLAB ON GRADE CONDITIONS ;;;;!�� ONTINUOUS Example:A blower door test has be.en done on a 2,000 square foot house <br /> and the fan flow(CFM50)rate is 1100 CFM. <br /> ALL ELECTRICAL PENETRATIONS AT EXTERIOR ACH.=(CFM50 X 60)1 Volume <br /> SUBFLOOR CAULKED,GLUED OR ACH._(11 00 X 60)1(2000 X 8) <br /> WALLS TO USE AIR-SEALED BOXES.ALL WIRE <br /> GASKETED TO RIM JOIST ACH.=66,000/16,000 <br /> OPENINGS&PENETRATIONS SEALED WITH ACH. <br /> CAULK,PUTTY OR INTEGRAL SEAL. <br /> RIM JOIST CAULKED OR GASKETED Since the code requires the ACHw to be less than 4,this house complies with an <br /> SEAL G.W.B.TO BOX FLANGE WITH <br /> TO SILL PLATE CONTINUOUS BEAD OF CAULK OR ADHESIVE. ACHwf o 4.1.Record the ACHm on the energy certificate on or near the electrical <br /> panel. <br /> P.T.SILL PLATE INSTALLED <br /> OVER CONTINUOUS SILL GASKET W <br /> O J <br /> L � <br /> W <br /> � (3 <br /> Z gn <br /> N CC <br /> G.W.B AIR BARRIER-CONCEPTUAL EXTERIOR WALL SECTION G.W.B AIR BARRIER-CONCEPTUAL ISOMETRIC O W <br /> � o <br /> Z T Q <br /> w v a <br /> m <br /> N CONCEPTUAL INTERIOR AIR BARRIER SYSTEM-GYPSUM WALL BOARD(G.W.B.)METHOD <br /> N N.T.S. <br /> a <br /> o I � <br /> E <br /> J <br /> s BOTH SIDES O ADHESIVE RST I SEALANT OR ADHESIVE O N v <br /> ON CONTINUOUS BEAD OF <br /> \NTERIOR STUD SUBFLOOR ADHESIVE <br /> I / \\ " <br /> o <br /> U <br /> \\ I \ v JOB NO.: <br /> rn \\ I \ 22205 <br /> G.W.B.ADHESIVE <br /> \ I SEALANT OR ADHESIVE v PLOT DATE <br /> e/4/2023 10:45:39 AM <br /> AT BOTTOM AND <br /> CONTINUOUS SEALANT AT TOP OF STUD -_ FIXTURE PERIMETER TO \ IDATE: 06/08/2023 <br /> G.W.B. \\ 2 SCALE: 1"=1'-0" <br /> I.C.RATED RECESSED \ <br /> o G.W.B.ADHESIVE ,�°,DRAWN: MB <br /> o LIGHT FIXTURE AT BOTTOM AND \ v CHCKD: TM <br /> TOP OF PLATE \ -� GENERAL SHEETS <br /> SHEET NO.: <br /> SEALING AT RECESSED FIXTURES A SEALING AT INTERSECTING WALLS SEALING AT RIM JOIST A 19 <br /> 3 N.T.S. N.T.S. N.T.S. <br /> U <br />