My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2019
>
Ordinances
>
Ordinance 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 2:34:45 PM
Creation date
10/18/2024 2:34:39 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2019
Date
4/18/1922
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2°19 <br /> An Ordinance providing for the improvement of Pacific <br /> Avenue from the East line of Rucker Avenue to the West line of <br /> 1 <br /> Hoyt Avenue and from the East line of Hoyt Avenue to the vest <br /> 2 <br /> line of Colby Avenue by grading to proper grade, removal of <br /> 3 <br /> old lumber, construction of an 8" "Portland Cement Concrete <br /> 4 Pavement full width between curbs, replacement of 8" water. <br /> 5 <br /> main, installation of necessary drainage and doing all other <br /> 6 work necessary in connection therewith to make a complete <br /> 7 improvement, all in accordance with Resolution No. 2894 of the <br /> 8 City of Everett , creating an assessment district, creating <br /> . 9 <br /> a Local Improvement District wand therefor, providing that <br /> 10 <br /> said improvement be made by special assessment upon the property <br /> 11. <br /> in said district under the mode of payment by bonds. <br /> 12 <br /> 13 WHEreas, by :.esolution No. 2894 of the City of <br /> 14 Everett the City Council of Everett has declared its intention <br /> J5 to order the improvement of Pacific Avenue from the East line <br /> 16 1 of Rucker Avenue to the lest line of Hoyt Avenue and from the <br /> 17 East line of Hoyt Avenue to the West line of Colby Avenue by <br /> 18 grading to proper grade, removal of old lumber, construction of <br /> 19 an 8" 'Portland Cement Concrete Pavement full width between curbs, <br /> 20 replacement of 8" water main, installation of necessary drainage <br /> 21 and doing all other work necessary in connection therewith to <br /> 22 make a complete improvement in accordance with the plans and <br /> ' <br /> 23 specifications prepared by theCity Engineer, now therefore, <br /> 24 TEE CITY OF EV7P,RETT DOES ORDAIN ; <br /> 25 <br /> S ection 1 : That Pacific Avenue from the East line <br /> 26 <br /> 27 of Rucker Avenue to the West line of Hoyt Avenue and from the <br /> 28 East line of Hoyt Avenue to the 'jest line of colby Avenue be <br /> 29 improved by grading to proper grade, removal of old lumber, <br /> 30 construction of an 8 " Portland Cement Concrete Pavement full <br /> 31 -1' <br />
The URL can be used to link to this page
Your browser does not support the video tag.