My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
900 PACIFIC AVE PROVIDENCE HEALTH AND SERVICES 2024-11-08
>
Address Records
>
PACIFIC AVE
>
900
>
PROVIDENCE HEALTH AND SERVICES
>
900 PACIFIC AVE PROVIDENCE HEALTH AND SERVICES 2024-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2024 11:53:58 AM
Creation date
10/23/2024 11:02:56 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
900
Tenant Name
PROVIDENCE HEALTH AND SERVICES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 1/16/2024 <br /> City of Everett Permit Services Public Works Permit#: PW2401-011 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EV E R E T T Everett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $65.00 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> Christopher La Rue Christopher La Rue <br /> 1124 Columbia Street 1124 Columbia Street <br /> Seattle,WA 98104 Seattle,WA 98104 <br /> PHONE:4258914833 PHONE:4258914833 <br /> SITE ADDRESS:900 PACIFIC AVE TAX PARCEL ID#:29053000200300 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION: Revise parking lot striping to create new ADA parking stall <br /> NOTES: Revision of existing parking lot striping and addition of(1)ADA parking sign <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections. <br /> 6. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 7. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 8. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> PERMIT FEE BREAKDOWN: <br /> Misc. Minor Permits...............................................................$25.00 <br /> PW Plan Review......................................................................$20.00 <br /> PW Site Inspection.................................................................$20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br /> all claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other <br /> right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br /> thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br /> This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration <br /> date 180 days to keep the permit open while work is active. <br /> Page 1 of 1 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.