Laserfiche WebLink
GRAPHIC SCALE EVERETT CHASE BANK ' <br /> City of Everett Permit Review m <br /> 0 20 40 A PORTION OF THE SE 1/4 OF THE SE 1/4 OF SECTION 30, TOWNSHIP 28 NORTH, RANGE 5 EAST, W.M. EVERETT Status:Reviewed for Permit W <br /> I INCH=20 FEET(22"04^) CITY OF EVERETT, SNOHOMISH COUNTY, WASHINGTON 09/13/2023 2:34:54PM o <br /> 1 INCH=40 FEET(11"X17") TESC PLAN <br /> DEMOLISH AND® SEE DEMOLITION NOTE,PER PLAN SHEETS. <br /> SHEET C4. O <br /> FILTER FENCE.SEE DETAIL 2,SHEET C4. <br /> IC FENCE PER DOE BMP 233: <br /> SILT U <br /> / / I INLET PROTECTION PER DOE BMP 220: <br /> STORM DRAIN INLET PROTECTION <br /> SEE DETAIL 1,SHEET C4 <br /> / REROUTE E UNDERGROUND <br /> COMMUNIMMUNI <br /> / CL CLEARING LIMITS <br /> \ CATION AND GAS LINES / / / I I / I. Z <br /> AROUND NEW BUILDING LOCATION. ^^ / <br /> W———Yy- CONTRACTOR TO COODRINATE WITH PP Y EXISTING UTILITIES LS \ <br /> PURVEYORS. PRESERVE AND PROTECT W <br /> CL <br /> _ _ — — — c <br /> LS ICB FH U(n M <br /> f L I J W p <br /> I �I a _S S— - —� I DEMOLITION NOTE z a�a <br /> — — — — — 1. ALL DEMOLITION MATERIAL SHALL BE RECYCLED OR DISPOSED OF AT AN J z M 3 <br /> _kD—-} I APPROVED WASTE HANDLING FACILITY. CONCRETE AND ASPHALT • p <br /> DEBRIS AT NO TIME SHALL BE UTILIZED AS FILL. c m <br /> �LS 2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING DISCONNECTIONS U' $a 2 <br /> 3 "GTI" I AND REMOVAL OF ALL UTILITIES AND OBTAINING ALL NECESSARY z Cdd 3 <br /> G <br /> \ EXISTING UTILITIES PERMITS.ALL UTILITIES SHALL BE REMOVED TO EXISTING STRUCTURES, Z t <br /> p <br /> P <br /> I G G �'� o I a L. OR UNDERGROUND UTILITIES CUT AND CAPPED AT PROPERTY LINE <br /> — A UNLESS OTHERWISE NOTED. _ <br /> 0 SIGN o SIGN DEMOLISH AND REMOVE 3. IF CONTRACTOR DETERMINES THERE ARE SIGNS OF POLLUTION AND/OR <br /> EXISTING PAVEMENT CONTAMINATION TO SITE SOILS,CONTRACTOR SHALL IMMEDIATELY o c7 <br /> CEASE WORK IN THE AFFECTED AREA AND CONTACT OWNER,ENGINEER, ®r., <br /> Q a+of <br /> I I <br /> I I AND COUNTY INSPECTOR FOR CONSULTATION AND DIRECTION. FM LLI Z <br /> 4. ALL WORK TO BE ACCOMPLISHED IN STRICT ACCORDANCE WITH ALL W vMi a, <br /> LOCAL ORDINANCES,CITY OR STATE. <br /> SINTENTN p4j <br /> REMOVE EXISTING CATCH BASIN AND STORM WITHIN THE SUBJECT PROPERTY,THE INTENT IS TO HAVE A CLEAN, x <br /> IICAUTIONII CLEAR SITE,FREE OF ALL EXISTING ITEMS NOTED TO BE REMOVED IN Z li <br /> LINE AFTER INSTALLING NEW STORM LINE I UNDERGROUND DRY UTILITIES,INCL. a t <br /> ORDER TO PERMIT THE CONSTRUCTION OF THE NEW PROJECT. 2 n <br /> POWER,COMMUNICATIONS,i.AND GAS <br /> � 6. BACKFILL ALL EXCAVATIONS RESULTING FROM THE DEMOLITION WORK � <br /> I I TO MEET THE <br /> TS FOR FILL <br /> S RE <br /> SD. I p� 7. GENERAL CONTRACTOR IS RESPONSIBLE ESPONSIB E OUTLINED TO VERIFY PRIOR TO THEFINAL L <br /> CONTRACT EXECUTION,IF ANY BUILDING STRUCTURE THAT IS NOTED TO Z W rn <br /> BUILDING / II I BE REMOVED HAS A BASEMENT.IF SO THE BUILDING STRUCTURE,BOTH Z(,.�c <br /> l FLOOR STRUCTURES,BASEMENT,FOUNDATION,ETC.ARE TO BE LJJ 0� <br /> m-o <br /> DEMOLISH AND REMOVE \ N I I. REMOVED AND BACKFILLED TO EXISTING GRADE ELEVATIONS N Q <br /> EXISTING PARKING AREA; I I I ' BO 25 SURROUNDING THE EXISTING STRUCTURE. W c15 <br /> TO BE IMPROVED TO SITE II bl H a L <br /> UTILITI <br /> i I PLAN P <br /> I ( I EXISTING ES PP <br /> ° 1 c I �1 I I � i EXISTING IMPROVEMENTS NOTE <br /> UNLESS OTHERWISE NOTED,EXISTING IMPROVEMENTS,INCLUDING CURBS, <br /> N I V BUILDINGS,I I I EXISTING IMPROVEMENTSN SSHHALLL BE RESERVED AND NAGE STRUCTURES, LPROTECT PITIES,AND ROTECTED. <br /> OTHER 4��Cp4M�s LL LS <br /> I 0 ry <br /> I I <br /> I I I I �►„x <br /> p� /\yl, I 4 I I u �.1 �A RACIs'fER�CL C�i) S�SD SD-SD-SD ffs'SYONALGl <br /> DEMOLISH AND REMOVE T\ 2(23.09.06 <br /> EXISTING PAVEMENT DE <br /> — H \\P <br /> \ I n <br /> L ' REMOVE AND BOLLARDS EXISTING CURB P... / ry G U_C1. G.—I^. PV <br /> SIGN E�XI�STING UTILITIESYpp 454_ I v <br /> I ICB a _ IL)C UC u C-�B ILLBOARD rn <br /> PP G TP _ P CtxUhhUUh I —� <br /> _ _t--- — — _ ot <br /> OPP EXISTING POWER POLEPU UC F UC P P 0 P _ m CJB TIP i 1 Z <br /> AND GUY WIRE ANCHORSC� o - - — Z o O <br /> 4 ®REMOVE BOLLARDS AS NEEDED TO F CCC o d <br /> �a -�. o CONSTRUCT PROPOSEDSIDEWALK o o -- w <br /> ° LU <br /> CONNECTING PARKING LOT TO BUS STOP ' oHH a <br /> 0 4 & SIDtWALK. v = 1 <br /> se I U a <br /> 0 41 BUS sTOP 4° ° Q uc - — I I Q LU <br /> IGNa L J—_-¢ Q A cr <br /> (1. LU J a LU <br /> I V LU <br /> o m <br /> I LU Moo <br /> a <br /> 132ND STREET SE (PUBLIC) <br /> VERIFICATION NOTE iL a <br /> _ 30 ALL EXISTING UTILITIES IN THE CONSTRUCTION AREA SHALL BE V <br /> — — — — — — /�,_ — — 29 IDENTIFIED AND VERIFIED DR DEPTH AND LOCATION PRIOR TO ANY F- F- <br /> v gI 38 CONSTRUCTION ACTIVITIES SO TO IDENTIFY ANY POTENTIAL CONFLICTS LU zZ <br /> WITH PROPOSED CONSTRUCTION.CONTACT PROJECT ENGINEER LU O <br /> IMMEDIATELY IF ANY CONFLICTS ARE IDENTIFIED. 0) U <br /> PRIOR TO ANY CONSTRUCTION ACTIVITIES,VERIFY EXISTING DESIGNER: K.MAUREN <br /> TOPOGRAPHY IS CONSISTENT WITH WHAT IS SHOWN ON PLANS AND IF ENGINEER: B.ALLEN <br /> THERE ARE ANY POTENTIAL CONFLICTS WITH PROPOSED CONSTRUCTION DRAWN: L.BESLER <br /> ACTIVITIES. CONTACT PROJECT ENGINEER IMMEDIATELY IF ANY S30 T28 N R05E WM <br /> CONFLICTS ARE IDENTIFIED. DATE: 2023.09.06 <br /> REVISED: <br /> PROJECT: 22-281 <br /> CALL 811 AT LEAST 48 DWG NAME: 22-281-C <br /> SHEET REV. <br /> HOURS BEFORE YOU DIG C3 0 <br /> 3 OF 10 <br />