Laserfiche WebLink
Proposal for Geotechnical Engineering Services <br /> Proposed Bank: 1515 132nd Street Southeast, Everett, Washington <br /> March 15, 2019 <br /> In our opinion,the predominately silty sand and silt soils underlying the site are not suitable <br /> for use as wall backfill. <br /> Wall backfill should be moisture conditioned to within about 3 percent of optimum <br /> moisture content, placed in loose, horizontal lifts less than 8 inches in thickness, and <br /> systematically compacted to a dense and relatively unyielding condition and to at least 95 <br /> percent of the maximum dry density, as determined using test method ASTM D-1557. <br /> Within 5 feet of the wall, the backfill should be compacted with hand-operated equipment <br /> to at least 90 percent of the maximum dry density. <br /> 5.5 PERMANENT CUT AND FILL SLOPES <br /> Based on the anticipated soil that will be exposed in the planned excavation, we <br /> recommend permanent cut and fill slopes be constructed no steeper than 2H:1 V <br /> (Horizontal:Vertical). <br /> 6.0 EARTHWORK CONSIDERATIONS <br /> 6.1 STRIPPING,CLEARING AND SUBGRADE PREPARATION <br /> Foundation and pavement areas, and areas to receive structural fill, should be stripped and <br /> cleared of surface vegetation, organic matter, existing pavements, and other deleterious <br /> materials. In no case should stripped materials be used as structural fill nor should they be <br /> mixed with materials to be used as structural fill. Outside of construction areas, the existing <br /> site pavement may be left in-place to provide an all-weather construction surface. <br /> In areas where existing foundations,slab-on-grade floors,and pavements are removed,it may <br /> be possible to crush the existing materials for re-use as structural fill. Materials reclaimed by <br /> crushing to be re-used as structural fill should have a maximum particle size of four inches <br /> and should be mixed with soil to provide a well-graded fill material. <br /> Existing underground utilities to be abandoned should be plugged or removed so they do not <br /> provide a conduit for water and cause soil saturation and stability problems. <br /> Following the stripping operation and excavations necessary to achieve construction <br /> subgrade elevations,the ground surface where structural fill, or pavements are to be placed <br /> should be observed by PanGEO. Proofrolling using a fully loaded dump truck should be <br /> performed to identify soft or unstable areas. <br /> 19-049 1515 132nd St SE Page 10 PanGEO,Inc. <br />