Laserfiche WebLink
• I <br /> CITY OF EVERETT <br /> PERMIT APPLICATION INFORMATION <br /> CONSTRUCTION MANAGER/PA/PM: Damir Alic <br /> PROJECT NAME: Cl&R and Stall 113 Design <br /> LOCATION (BLDG/FLR/COL): Stall 113: 45-767 &45-900(to be relocated) <br /> Stall 114: Butler Building—45-05 (new) <br /> Stall 115: 45-767&45-900(proposed relocated) <br /> PROJECT TIMELINE&PERMIT NEED DATE: Permits need by 5/13 or sooner <br /> MAXIMO JOB#: BA#: EVE-16-2939 WO#: 18-203 PO#: 1106432577 <br /> (I understand that you were able to get this a couple weeks ago <br /> —I don't have this number) <br /> CHARGELINE#: Rev 00 <br /> CONTRACT PRICE OF WORK BEING $50,000 <br /> PERMITTED: <br /> CONTRACTOR NAME: Dahlgren Industrial, Inc., Attn:Jeff Wiper <br /> CONTRACTOR E-MAIL jeffw@dahlgrenindustrial.com <br /> CONTRACT STATE LISC#: DAHLGII988BQ <br /> CONTRACTOR CITY OF EVERETT LISC#: 042200 <br /> BRIEF OVERVIEW OF PROJECT SCOPE: Stall 113/115 Modifications: Modify Stall 113 on the Everett <br /> (Do not include electrical and mechanical Boeing Flightline to allow all models of airplanes to be parked <br /> scope and costs. Contractors will secure and worked on in the stall. <br /> these permits) The following scope of work is included in the modifications: <br /> • Remove existing hardstands, provide new hardstands. <br /> • Install aircraft tie downs for all twin aisle aircraft. <br /> • Relocate building 45-767 and 45-900 from their existing <br /> location to new locations in Stall 115. <br /> Stall 114 Modifications: 777X Change Incorporation/Refurb: <br /> The following scope of work is included in the modifications: <br /> • Install new storage building on the East side of stall 114. <br /> IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br /> DOCUMENTATION AS REQUIRED: <br /> For building permits, include (1) site plan), (2) full size drawing sets, (1) set of structural calcs, and any <br /> applicable energy code forms <br /> For pallet rack installations, include (1) site plan, (2) copies of Existing/Proposed layouts and (2) sets of <br /> structural calculations. <br /> For Public Work permits, include (1) site plan, (4)full size drawing sets and (2) sets of drainage calcs. <br />