My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lisa Sjong Wilson 10/23/2024
>
Contracts
>
Agreement
>
Settlement Agreements
>
Lisa Sjong Wilson 10/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 9:30:59 AM
Creation date
10/25/2024 9:30:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lisa Sjong Wilson
Approval Date
10/23/2024
Department
Real Property
Department Project Manager
Darcie Byrd
Subject / Project Title
City Use Agreement 3814 W Mukilteo Blvd - Edgewater Bridge Repalcement
Tracking Number
0004554
Total Compensation
$21,657.71
Contract Type
Agreement
Contract Subtype
Settlement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> DESCRIPTION OF FOUNDATION SURVEY <br /> Includes four monitoring points on the house's foundation. Surveyor to establish a baseline and <br /> thereafter collect data on three visits post baseline, including one after bridge construction has <br /> been completed. <br /> DESCRIPTION OF VIBRATION MONITORING <br /> Automated vibration monitor system to be installed either directly onto the side of the house <br /> foundation or in the ground next to the foundation. Contractor to calibrate the equipment to <br /> send an email notification any time a specific vibration threshold as agreed upon by parties is <br /> exceeded. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.