Laserfiche WebLink
� NORTH <br /> _ ' verizon� <br /> - ss / / HsbeloW. <br /> / Call be—wB ai9. <br /> ro,*foNUYeEP PROJECT:LEGEND: <br /> 1801 AVAVAO.16 ROW EVF 2396 <br /> L----j — BORE/MISSILE BORE <br /> 3403 W MUKILTEO BLVD — OPEN TRENCH CITY OF EVERETT <br /> 3413 W MUKILTEO BLVD / — SIDEWALK 'r <br /> E.O.P — EDGE OF PAVEMENT 2200LYMPIC BLVD, <br /> EVERETT,WA <br /> B.O.0 — BACK OF CURB <br /> R.O.W.— RIGHT OF WAY <br /> C.L.--- STREET CENTERLINE <br /> R.O.W. ® R.O.W. • POTHOLE LOCATION I - O Q <br /> V o <br /> v <br /> U 2 � <br /> 0' 10, 20' 40' w af <br /> O z <br /> B.O.C. — — A 'B.O.c. v z o F�F <br /> O U F o <br /> V Q IX <br /> Z SO > <br /> WEST MUKILTEO BLVD F w w & <br /> C.L.-- — — — — — — — <br /> O w <br /> EX SEWER C L W, 2 <br /> o cn <br /> MAINTAIN 24"MIN ¢ 0 <br /> Cl) CLEARANCE rn <br /> POTHOLE AND RESTORE N <br /> M — —ISS— — —SS— — —SS— �— —SS TO STANDARDS � <br /> B.O.C. — �� — ss — ss W—ss a FORESITE <br /> sw — sw sw ® B.O.C. � <br /> 14+00 S W S S W- ® S 15+00 <br /> w w w <br /> z R.O.W. z <br /> = EX SEWER INSTALL 220 LF OF y EX SEWER R.O.W. <br /> v N MAINTAIN 24"MIN 1-2"HDPE CONDUIT <br /> y MAINTAIN 24"MIN w F <br /> a CLEARANCE (BORE) CLEARANCE a <br /> POTHOLE AND RESTORE <br /> TO STANDARDS / 1 POTHOLE AND RESTORE <br /> TO STANDARDS <br /> co <br /> � / 1 <br /> � Cn ENGINEER: AS <br /> DRAWN BY: AS <br /> m / REVISIONS <br /> O DATE DESCRIPTION INITIAL <br /> W <br /> / F NOTE TR.N-ACTOR: <br /> J ANY BOREPITS.UG N.-T. <br /> E%T TO.RIPLINE OF AN EXISTING TREE <br /> co cl) <br /> TO BE DUGGED USING HYDRO VACCUUM EXCAVATION. <br /> Y <br /> CAUTIO ANY DISTURBANCE <br /> _ _ <br /> AOF <br /> ADA .R WILL REQUIRE ENTTHF AMP TO BE REPAIREFEETD IN <br /> CC DANCE WITH ALL REQUIRED ASIA STANDARDS AND <br /> O SPECIORFICATIONS. <br /> ALL TELECOM UTTY LOCATIONS ON PRINT ARE BASE.ON <br /> m3402 W MUKILTEO BLVD FIELD SURVEY ANDILI OBSERVATIONS.LOCATIONSMAYNOTBE <br /> ACCU <br /> RATE OR COMPLELE. <br /> / NCHES OF COVER WHEN UNOBSTRUCTED.CONTRACTOR TO �Ec'Fco ou"s"o6 rn vua <br /> MAINTAIN 20INCHES OF SEPARATION FROM OTHER UTILITIES. <br /> DEPT, BE A.,STEDACCORDINGLY <br /> / UTILITYTLOCATIONS SHOWN ON THIS O PLAN ARE BASED ON SCALE <br /> DOCUMENT RESEARCH AND J / INFORMATION MAY NOT BE ACCURATE ORVCOMPLETE IT IS HORIZONTAL: 1'=20' <br /> H IN CONSTRUCTION PATH NNAN.IOEPTH LY OF ALViIILNIES VERTICAL: N/A <br /> WIT ALL INSTALLATIONS MUST COMPLY WITH MINIMUM <br /> HORIMNTAL AND VERTICAL CLEARANCES FROM UTILITIES. <br /> SHEET:C-07 <br />