My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3804 W MUKILTEO BLVD 2024-12-03
>
Address Records
>
W MUKILTEO BLVD
>
3804
>
3804 W MUKILTEO BLVD 2024-12-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 3:08:55 PM
Creation date
10/25/2024 11:02:23 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3804
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MCI CONSTRUCTION DETAILS/TYPICALS verizonl <br /> TYPICAL OPEN TRENCH DETAIL 1...PROJECT: <br /> 1801AVA0.16 ROW EVT 2395 <br /> TYPICAL DETAIL A TYPICAL DETAIL B TYPICAL DETAIL C CITY"OF EVERETT <br /> 220 O_N;PIC BLVD, <br /> OPEN CUT CONCRETE OR ASPHALT TRENCH&PLACE CONDUIT TRENCH&PLACE JOINT CONDUIT EVERETT,WA <br /> PLAN VIEW <br /> — <br /> 6"MIN. EXISTING GRADE 12"MIN. EXISTING GRADE � <br /> O Z W <br /> O (n o <br /> CONDUIT U SPECIE I I '�+ H Q <br /> ENV ANY NUMBER OF 12"MIN.BELOW TFINISHED <br /> 2"MIN.BELOW U 2I I BURIED CABLE <br /> INNERDUCTSAND/OR FINISHED GRADE GRADE j It <br /> D- <br /> HDPE's,AS SPECIFIED BURIED CABLE MARKER TAPE w <br /> MARKERTAPE i0 <br /> 8 FIBER OPTIC CABLE COMPACT BACKFILL IN 6"LAYERS ++ Z Z - <br /> -- R/ MIAP" COMPACT BACKFILLS IN q WITH ROCK FREE MATERIAL.2-SACK N O OU o <br /> COVER 6"LAYERS WITH ROCK COVER. SAND-SLURRY BACKFILL MAYBE E = r W <br /> FREE MATERIAL REQUIRED BY THE LOCAL GOV. Z <br /> 'EQ?.;.�' AGENCY M � W z <br /> Q a.,CONCRETE <br /> rc % ASPHALT ROAD CONDUIT AS SPECIFIED ENV W LEIrn = w <br /> ¢ ANY NUMBER OF INNERDUCTS CONDUIT AS SPECIFIED ENV W YY <br /> > ' AND/OR HDPE's,AS SPECIFIED ANY NUMBER OF INNERDUCTS U O <br /> " &FIBER OPTIC CABLE AND/OR HDPE's,AS SPECIFIED <br /> •EOP`�•" ` &FIBER OPTIC CABLE Q <br /> CONDUIT AS SPECIFIED <br /> RAH ENV PULL ROPE <br /> SAW CUT AND 3 3 FORESITE <br /> REMOVE 2'MIN. group <br /> TYPICAL DETAIL D <br /> TRENCH EROSION CONTROL <br /> TOP OF BANK <br /> FRONT CROSS SECTION SIDE CROSS EXISTING <br /> VIEW SECTION VIEW GRADE <br /> VARIES VARIES <br /> EXISTING GRADE SPACE RO <br /> EQUALLY <br /> ENGINEER: AB <br /> FILLED BAGS DRAWN BY: AS <br /> REVISIONS <br /> DATE DESCRIPTION INITII <br /> FILLED BAGS <br /> A CLEAN BACKFILL <br /> COVER <br /> TOE OF BANK <br /> NOTES: <br /> CONDUIT AS SPECIFIED 1.INTERLOCK BAGS INTO TRENCH,ONE <br /> ENV ANY NUMBER OF LAYER PARALLEL WITH THE CABLE,THE <br /> INNERDUCTS AND/OR SECOND LAYER CROSSWISE AND THE w" <br /> HDPE's,AS SPECIFIED& THIRD LAYER PARALLEL,ETC..TAMP THE <br /> FIBER OPTIC CABLE BAGS FIRMLY INTO PLACE AND PLACE <br /> THE BAGS SO THEY WILL CONFORM TO SCALE <br /> NOTE: 2.BAGS WILL EXTEND THE FULL WIDTH <br /> HORIZONTAL: N/A <br /> BACKFILL MUST BE MADE AND DEPTH OF EXCAVATION TO VERTICAL: N/A <br /> WITH ROCK FREE MATERIAL UNDISTURBED SOIL. <br /> SHEET:D-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.