My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1722 127TH PL SE 2025-01-14
>
Address Records
>
127TH PL SE
>
1722
>
1722 127TH PL SE 2025-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 11:28:48 AM
Creation date
10/28/2024 8:24:39 AM
Metadata
Fields
Template:
Address Document
Street Name
127TH PL SE
Street Number
1722
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />6/9/2021 <br />6/9/2021 <br />BLDG 01- <br />KURT KECK <br />OTHER <br />see notes <br />CONSULTATION <br />Notes: <br />6/8/2021 12:22 PM Stephen Morrison <br />Wall framing is complete. Let me know when you are here. <br />Contact Name: Stephen Morrison <br />Site Address: 1722 127TH PL SE <br />Phone:4253591187 <br />e-Mail: stemo76@gmail.com <br />(6/9/2021 1:11 PM KMK) <br />KMK changed Inspection Type from BLDG 08-FRAMING to BLDG 01-CONSULTATION <br />(6/9/2021 1:15 PM KMK) <br />Contractor has framed walls and there is a delay in getting trusses due to market difficulties. Project will resume in the fall. Recall for shear nailing when <br />ready. <br />10/14/2021 <br />10/14/2021 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />CORRECTION <br />See Notes <br />REQUIRED <br />Notes: <br />10/12/2021 8:48 AM Stephen Morrison <br />general framing with plywood on exterior walls and roof complete. Looking for sign off so I can tar paper and house wrap <br />Contact Name: Stephen Morrison <br />Site Address: 1722 127TH PL SE <br />Phone:4253591187 <br />e-Mail: stemo76@gmail.com <br />(10/14/2021 3:52 PM RFK) <br />-2200 lb strap connecting header to jack -stud on opposite side of sheating @ garage door portal frames. Both portal frames <br />-Wall top plate to header nailing (2) rows 16d sinker nails @ 3" o.c. Both portal frames <br />-blocking at panel joints. one row of 3" o.c. nailing reuired for each panel edge. Both portal frames <br />-gable end bracing. <br />10/14/2021 <br />10/14/2021 <br />BLDG 14-ROOF <br />RAKEEB KHAN <br />APPROVAL <br />NAILING <br />Notes: <br />10/20/2021 <br />10/20/2021 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />APPROVAL <br />eTRAKiT Inspection Request <br />Notes: <br />10/19/2021 8:42 AM Stephen Morrison <br />corrections have been made, Truss supports are in place, inside straps are in place. Panel splice blocking in place on portal seams <br />Contact Name: Stephen Morrison <br />Site Address: 1722 127TH PL SE <br />Phone:4253591187 <br />e-Mail: stemo76@gmail.com <br />PERMIT <br />EXTENSION <br />4/21/2022 <br />4/21/2022 <br />EXTENSION- <br />RYAN HAMMER <br />SEE NOTE <br />REASON REQUIRED <br />APPROVED <br />Notes: <br />It doesn't look like this got extended. How can I keep this open. <br />I <br />Printed: Wednesday, 07 February, 2024 2 of 5 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.